Office Engineer

Proposal Letting List
February 26, 2016, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. ACIMF-I059(382), JEFFERSON 3. ACOA43892F-ATRP(003), LEE
7. ACAA61151-ATRP(013), RUSSELL 8. ACAA61259-ATRP(011), BLOUNT
11. ACBRZ59352-ATRP(003), ETC., WASHINGTON 12. ACBRZ61971-ATRP(016), LEE
13. ACBRZ62132-ATRP(006), ETC., LAUDERDALE 19. ACNU60305-ATRP(014), CHILTON
20. ACNU60312-ATRP(015), CHILTON 21. ACOA61198-ATRP(008), ETC., ETOWAH
26. ACOA59651-ATRP(007), LAUDERDALE 27. ACOA61194-ATRP(008), DEKALB
32. ERPR-8980(907), MOBILE 34. FLAP-FLAP(004), MONTGOMERY
40. NH-0005(545), DALLAS 41. NH-HSIP-0013(595), ETC., MARENGO
42. NH-0020(523), LAUDERDALE 43. NH-HSIP-0001(587), CHAMBERS
46. STPAA-0028(509), ETC., WILCOX * 47. STPAA-0039(502), SUMTER
48. STPAA-0041(514), ETC., MONROE 49. STPAA-0187(500), FRANKLIN
* 50. STPAA-0253(505), MARION 51. STPAA-0269(508), WALKER
54. STPAA-HSIP-0022(522), COOSA 55. STPAA-HSIP-0055(512), COVINGTON
56. STPAA-HSIP-0095(505), HENRY 57. STPAA-HSIP-0174(502), ST. CLAIR
60. STPNU-0614(250), BULLOCK 61. STPOA-2614(252), ELMORE
62. STPNU-3413(252), HENRY 63. STPNU-3915(251), LAUDERDALE
64. STPNU-6514(254), WASHINGTON 67. STPOA-0204(515), CALHOUN
71. ST-002-180-013, BALDWIN 74. 99-501-362-065-401, JACKSON
200. HPP-1602(511), MOBILE

* --- WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACIMF-I059(382) ,JEFFERSON COUNTY

Contract Time: 225 Working Days

DBE Goal Percent:1.00

for constructing the Installation of ITS Devices and Infrastructure on I-59/I-20 and I-65 in support of the CBD Bridge Replacement Project in Birmingham.

The Bracket Estimate on this project is from $5,181,706 to $6,333,196 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $50.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 AM on Thursday, February 18, 2016, at the Alabama Department of Transportation, East Central Region, Birmingham Area Office, District 1 Assembly Room; 1020 Bankhead Highway West, Birmingham, Alabama 35204. Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


3.ACOA43892F-ATRP(003) ,LEE COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement and Additional Lanes (Grade, Drain, Base, Pave, and Signals) on CR-146 (Moore's Mill Road) at the I-85 Overpass in Auburn. Length 0.724 mi.

The Bracket Estimate on this project is from $8,212,914 to $10,038,006 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $72.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACAA61151-ATRP(013) ,RUSSELL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-41 (Clark Road) from the junction of CR-137 (Uchee Hill Highway) to the junction of CR-28 (Sandfort Road). Length 3.739 mi.

The Bracket Estimate on this project is from $672,562 to $822,020 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACAA61259-ATRP(011) ,BLOUNT COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on CR-15 from the junction of SR-75 to the junction of SR-79 in Locust Fork. Length 5.561 mi.

The Bracket Estimate on this project is from $1,041,050 to $1,272,395 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ59352-ATRP(003) & ACBRZ59353-ATRP(004) ,WASHINGTON COUNTY

Contract Time: 325 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacements on CR-12 over Bassetts Creek northeast of Chatom and on CR-19 over Bassetts Creek southeast of Chatom. Length 0.135 mi.

The Bracket Estimate on this project is from $2,127,179 to $2,599,885 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.ACBRZ61971-ATRP(016) ,LEE COUNTY

Contract Time: 45 Working Days

for constructing the Bridge Replacement on CR-150 over Phelps Creek. Length 0.016 mi.

The Bracket Estimate on this project is from $374,417 to $457,621 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


13.ACBRZ62132-ATRP(006), ACBRZ62133-ATRP(007) & ACBRZ62135-ATRP(002) ,LAUDERDALE COUNTY

Contract Time: 210 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacement and Approaches on CR-49 over the West Fork of Anderson Creek (Site 1); on CR-52 over Deerlick Creek (Site 2); and on CR-489 over Second Creek (Site 3). Length 0.330 mi.

The Bracket Estimate on this project is from $1,338,100 to $1,635,456 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACNU60305-ATRP(014) ,CHILTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-29 from the junction of CR-48 to the junction of CR-42. Length 2.600 mi.

The Bracket Estimate on this project is from $666,086 to $814,106 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACNU60312-ATRP(015) ,CHILTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-50 (Jones Street) from the intersection of SR-3 (US-31) to the Yellow Creek Bridge in Thorsby. Length 1.364 mi.

The Bracket Estimate on this project is from $363,657 to $444,470 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACOA61198-ATRP(008) & ACOA61199-ATRP(013) ,ETOWAH COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Fourth Street from the intersection of Sixth Avenue to the junction of SR-7 (US-11) and on Burke Avenue from the junction of Lee Street to the junction of SR-77 in Attalla. Length 1.862 mi.

The Bracket Estimate on this project is from $843,682 to $1,031,167 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACOA59651-ATRP(007) ,LAUDERDALE COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing, Reconstruction, and Traffic Stripe on Wood Avenue from the intersection of East Tuscaloosa Street to the junction of Gilbert Court in Florence. Length 0.886 mi.

The Bracket Estimate on this project is from $814,795 to $995,860 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ACOA61194-ATRP(008) ,DEKALB COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:12.00

for constructing the Resurfacing and Traffic Stripe on Dean Road from the junction of CR-89 (DeSoto Parkway) to the junction of CR-153 (Fisher Road) in Fort Payne. Length 2.599 mi.

The Bracket Estimate on this project is from $349,439 to $427,092 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.ERPR-8980(907) ,MOBILE COUNTY

Contract Time: 30 Working Days

for constructing the Permanent Restoration of a damaged site on SR-17 (US-45) at MP 13.130 near the junction of Hogg Road northwest of Prichard.

The Bracket Estimate on this project is from $105,716 to $129,208 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.FLAP-FLAP(004) ,MONTGOMERY COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing a Walking Path from the current end of the Montgomery River (MATS Intermodal Bridge and Tower) to Wrights Brothers Park via the Pedestrian Stairway.

The Bracket Estimate on this project is from $427,246 to $522,190 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.NH-0005(545) ,DALLAS COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-5 from the Wilcox County Line to just north of the intersection of CR-21 (MP 42.978). Length 10.351 mi.

The Bracket Estimate on this project is from $1,682,121 to $2,055,926 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-HSIP-0013(595), NH-0013(596), STPAA-0028(508) & STPAA-HSIP-0069(549) ,MARENGO COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-13 (US-43) from 0.780 mile north of the intersection of SR-10 to south of the junction of CR-30 (Site 1); Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from 0.030 mile north of the junction of SR-69 to 0.340 mile north of the junction of SR-28 (Site 2); Planing, Resurfacing, and Traffic Stripe on SR-28 from the junction of SR-13 (US-43) to west of the junction of Lawrence Street in Linden (Site 3); and the Safety Widening, Resurfacing, and Traffic Stripe on SR-69 from the Clarke County Line to north of the Horse Creek Bridge (Site 4). Length 11.413 mi.

The Bracket Estimate on this project is from $2,922,580 to $3,572,042 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $19.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.NH-0020(523) ,LAUDERDALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-20 from the junction of SR-133 (MP 17.160) to the junction of SR-2 (US-43/MP 22.050) in Florence. Length 4.793 mi.

The Bracket Estimate on this project is from $1,740,284 to $2,127,014 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-HSIP-0001(587) ,CHAMBERS COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-1 (US-431) from north of the Lafayette City Limits (MP 161.640) to the south Town Limits of Five Points (MP 169.779). Length 8.139 mi.

The Bracket Estimate on this project is from $2,642,666 to $3,229,926 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.STPAA-0028(509) & STPAA-HSIP-0221(501) ,WILCOX COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-28 from the junction of SR-10 (MP 88.288) to west of the junction of SR-21 (MP 97.267) and the Safety Widening, Resurfacing, and Traffic Stripe on SR-221 from the intersection of SR-10 (MP 1.920) to the junction of SR-28 (MP 6.345). Length 13.403 mi.

The Bracket Estimate on this project is from $3,567,474 to $4,360,246 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-0039(502) ,SUMTER COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing, Traffic Stripe, and Cross Slope/Superelevation Corrections on SR-39 from north of the Factory Creek Bridge (MP 5.603) to the Tombigbee River Bridge (MP 11.161) in Gainesville. Length 5.557 mi.

The Bracket Estimate on this project is from $1,723,400 to $2,106,378 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

 --- WITHDRAWN FROM THE LETTING ---

 

Return To: Proposal Letting List (Top of web page)


48.STPAA-0041(514) & STPAA-HSIP-0041(515) ,MONROE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-41 from a point south of the junction of SR-21 (MP 45.506) to the northwest corner of the Monroeville Square (MP 47.514) and the Safety Widening, Resurfacing, and Traffic Stripe on SR-41 from 0.130 mile south of the junction of CR-230 (MP 62.500) to 0.160 mile south of the junction of CR-17 (MP 65.000). Length 4.508 mi.

The Bracket Estimate on this project is from $1,660,860 to $2,029,940 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-0187(500) ,FRANKLIN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:6.00

for constructing the Maintenance Resurfacing and Traffic Stripe on SR-187 from the intersection of SR-172 in Hodges to just south of the intersection of CR-22 (MP 17.270). Length 7.538 mi.

The Bracket Estimate on this project is from $1,694,335 to $2,070,853 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-0253(505) ,MARION COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-253 from the junction of SR-44 (MP 6.437) in Twin to the junction of CR-45 (MP 12.914). Length 6.476 mi.

The Bracket Estimate on this project is from $2,020,727 to $2,469,777 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

--- WITHDRAWN FROM THE LETTING ---

Return To: Proposal Letting List (Top of web page)


51.STPAA-0269(508) ,WALKER COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-269 from the Jefferson County Line (MP 21.740) to north of the junction of CR-22 (MP 32.120) northwest of Goodsprings. Length 9.839 mi.

The Bracket Estimate on this project is from $2,887,807 to $3,529,542 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0022(522) ,COOSA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-22 from MP 89.308 to the intersection of SR-21 (US-231) in Rockford. Length 6.657 mi.

The Bracket Estimate on this project is from $2,667,690 to $3,260,509 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0055(512) ,COVINGTON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-55 from just south of the junction of Poplar Street (MP 1.490) in Lockhart to the Yellow River (MP 10.374). Length 8.668 mi.

The Bracket Estimate on this project is from $2,411,090 to $2,946,888 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPAA-HSIP-0095(505) ,HENRY COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-95 from the junction of CR-46 in Abbeville to the junction of CR-92. Length 6.964 mi.

The Bracket Estimate on this project is from $2,347,027 to $2,868,589 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-HSIP-0174(502) ,ST. CLAIR COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-174 from the junction of SR-25 (US-411/MP 9.446) south of Odenville to the junction of SR-53 (US-231/MP 19.598) north of Pell City. Length 10.152 mi.

The Bracket Estimate on this project is from $2,245,864 to $2,744,945 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPNU-0614(250) ,BULLOCK COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-11 from the junction of CR-8 to the junction of CR-14 northwest of Inverness. Length 3.098 mi.

The Bracket Estimate on this project is from $789,661 to $965,141 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPOA-2614(252) ,ELMORE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on Possum Trot Road from the intersection of Coosa River Road to the intersection of Lightwood Road northwest of Holtville. Length 1.778 mi.

The Bracket Estimate on this project is from $332,797 to $406,752 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPNU-3413(252) ,HENRY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 from the intersection of SR-1 (US-431) to the junction of SR-173 southwest of Abbeville. Length 1.580 mi.

The Bracket Estimate on this project is from $314,079 to $383,874 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-3915(251) ,LAUDERDALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on CR-11 from the junction of SR-157 to the intersection of CR-8 east of Cloverdale (Site 1) and on CR-51 from the intersection of CR-92 to the intersection of CR-76 in Whitehead (Site 2). Length 4.435 mi.

The Bracket Estimate on this project is from $478,188 to $584,451 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPNU-6514(254) ,WASHINGTON COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-19 from the junction of CR-35 west of McIntosh to the intersection of CR-20. Length 6.705 mi.

The Bracket Estimate on this project is from $1,317,690 to $1,610,510 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPOA-0204(515) ,CALHOUN COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing, Traffic Stripe, and Bridge Rail Retrofit on SR-204 from the intersection of SR-1 (US-431) to the intersection of CR-73 (West Point Road/Pleasant Valley Road) west of Jacksonville. Length 6.620 mi.

The Bracket Estimate on this project is from $2,855,473 to $3,490,023 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.ST-002-180-013 ,BALDWIN COUNTY

Contract Time: 45 Working Days

for constructing the Resurfacing and Traffic Stripe on SR-180 from 0.560 mile east of the Foley Beach Express (MP 26.038) to just west of SR-161 (MP 28.264) in Orange Beach. Length 2.226 mi.

The Bracket Estimate on this project is from $783,958 to $958,171 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.99-501-362-065-401 ,JACKSON COUNTY

Contract Time: 40 Working Days

for constructing the Culvert Replacement (Grade, Drain, Base, and Pave) on SR-65 over Lick Fork Creek east of Princeton. Length 0.151 mi.

The Bracket Estimate on this project is from $343,146 to $419,400 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.HPP-1602(511) ,MOBILE COUNTY

Contract Time: 65 Working Days

for constructing the Historic Whistler Bike Trail (Bike Path along an abandoned Railroad Corridor) along SR-17 from a point near the I-65 Interchange (Exit 9) to a point near the SR-158 Interchange in Prichard. Length 1.293 mi.

The Bracket Estimate on this project is from $525,351 to $642,096 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)