Office Engineer

Proposal Letting List
March 25, 2016, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. HPP-0035(514), MONTGOMERY 3. ACAA59494-ATRP(006), JEFFERSON
4. ACAA61019-ATRP(012), SHELBY 5. ACAA61023-ATRP(012), SHELBY
6. ACAA61026-ATRP(012), SHELBY 7. ACAA61048-ATRP(003), MONTGOMERY
8. ACAA61131-ATRP(011), ETC., LEE 10. ACBRZ58647-ATRP(010), JACKSON
11. ACBRZ59350-ATRP(007), WASHINGTON *12. ACBRZ59351-ATRP(002), WASHINGTON
17. ACNU59633-ATRP(007), MACON 18. ACNU60295-ATRP(006), BIBB
19. ACNU60307-ATRP(017), CHILTON *20. ACNU60374-ATRP(015), ETC., CLAY
21. ACNU61882-ATRP(017), ETC., SUMTER 24. ACOA58400-ATRP(010), MORGAN
25. ACOA58404-ATRP(016), MORGAN 26. ACOA58459-ATRP(009), CALHOUN
28. ACOA63305-ATRP(018), LIMESTONE 32. HSIP-4913(250), MOBILE
36. IM-I065(455), ETC., BUTLER 37. IM-I085(347), LEE
40. NH-0001(591), MARSHALL 41. NH-0003(595), ESCAMBIA, ETC.
42. NH-0005(549), BIBB 43. NH-0074(536), MARION
46. STPOA-0005(550), WALKER 47. STPAA-0052(512), GENEVA
49. STPAA-0239(503), BARBOUR 50. STPAA-4915(250), MOBILE
51. STPAA-0253(505), MARION 52. STPAA-HSIP-0003(596), BUTLER
53. STPAA-HSIP-0004(542), CALHOUN 54. STPAA-HSIP-0018(506), LAMAR
55. STPAA-HSIP-0097(505), LOWNDES 57. STPAA-HSIP-0039(502), SUMTER
59. STPBH-CN13(907), JEFFERSON 62. STPNU-0315(250), BARBOUR
63. STPNU-1814(250), CONECUH 64. STPNU-6215(250), TALLAPOOSA
67. STPOA-5214(250), MORGAN 71. ST-051-110-008, MONTGOMERY
73. 99-307-341-173-601, HENRY
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.HPP-0035(514) ,MONTGOMERY COUNTY

Contract Time: 285 Working Days

for constructing the Roadway Lighting on the Montgomery Outer Loop at the I-85 Interchange. Length 2.500 km.

The Bracket Estimate on this project is from $1,714,989 to $2,096,098 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.ACAA59494-ATRP(006) ,JEFFERSON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 6.00

for constructing the Resurfacing and Traffic Stripe on CR-42 (Tyler Road) from the junction of Southland Drive to the junction of Columbiana Road (Site 1); on CR-62 (Overton Road) from 441 feet west of the junction of Liberty Parkway to the I-459 Exit Ramp (Site 2); and on CR-99 (Columbiana Road) from the junction of SR-3 (US-31) to the junction of Gentilly Drive (Site 3). Length 1.706 mi.

The Bracket Estimate on this project is from $871,743 to $1,065,463 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ACAA61019-ATRP(012) ,SHELBY COUNTY

Contract Time: 45 Working Days

for constructing the Resurfacing and Traffic Stripe on Old Highway 25 from the junction of SR-25 to the junction of Walton Street in Columbiana. Length 1.400 mi.

The Bracket Estimate on this project is from $326,646 to $399,234 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.ACAA61023-ATRP(012) ,SHELBY COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-99 from the junction of SR-145 to the junction of CR-47 south of Columbiana. Length 2.049 mi.

The Bracket Estimate on this project is from $187,193 to $228,791 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACAA61026-ATRP(012) ,SHELBY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on CR-30 from the junction of the SR-25 Business Loop in Columbiana to the junction of SR-145. Length 5.152 mi.

The Bracket Estimate on this project is from $860,218 to $1,051,378 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACAA61048-ATRP(003) ,MONTGOMERY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on CR-233 (Fairview Avenue) from 0.1 mile south of the intersection of Airbase Boulevard to the I-65 Interchange in Montgomery. Length 1.153 mi.

The Bracket Estimate on this project is from $1,127,763 to $1,378,377 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACAA61131-ATRP(011) & ACAA61133-ATRP(011) ,LEE COUNTY

Contract Time: 70 Calendar Days

DBE Goal Percent: 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-230 from the junction of CR-240 to the junction of CR-246 in Smiths Station and the Planing, Widening, Resurfacing, and Traffic Stripe on CR-430 from the junction of SR-1 (US-431) in Smiths Station to the Russell County Line. Length 7.255 mi.

The Bracket Estimate on this project is from $2,192,830 to $2,680,126 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ58647-ATRP(010) ,JACKSON COUNTY

Contract Time: 150 Working Days

DBE Goal Percent: 6.00

for constructing the Bridge Replacement and Approaches on CR-213 over Mud Creek northeast of Hollywood. Length 0.192 mi.

The Bracket Estimate on this project is from $1,055,223 to $1,289,716 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ59350-ATRP(007) ,WASHINGTON COUNTY

Contract Time: 250 Working Days

DBE Goal Percent: 7.00

for constructing the Bridge Replacements (Main and Relief) on CR-20 over the Escatawpa River southeast of Fruitdale. Length 0.128 mi.

The Bracket Estimate on this project is from $2,241,467 to $2,739,571 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


*12.ACBRZ59351-ATRP(002) ,WASHINGTON COUNTY

Contract Time: 135 Working Days

DBE Goal Percent: 10.00

for constructing the Bridge Replacement on CR-2 over the Escatawpa River. Length 0.047 mi.

The Bracket Estimate on this project is from $1,135,830 to $1,388,237 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


17.ACNU59633-ATRP(007) ,MACON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 8.00

for constructing the Resurfacing and Traffic Stripe on CR-22 from the junction of CR-26 to the intersection of CR-24. Length 5.110 mi.

The Bracket Estimate on this project is from $593,246 to $725,078 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACNU60295-ATRP(006) ,BIBB COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-65 (Bulldog Bend Road) from the junction of SR-25 to the intersection of CR-24 south of Seymour. Length 5.799 mi.

The Bracket Estimate on this project is from $1,030,234 to $1,259,175 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACNU60307-ATRP(017) ,CHILTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-48 from the junction of CR-29 to the junction of CR-42 in Jemison. Length 2.627 mi.

The Bracket Estimate on this project is from $731,690 to $894,288 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACNU60374-ATRP(015) & ACNU60375-ATRP(013) ,CLAY COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-30 (Cragford Road) from the intersection of SR-49 to the junction of Wesobulga Creek Road and on CR-2 (Partridge Creek Road) from the junction of CR-7 to the junction of SR-9. Length 6.945 mi.

The Bracket Estimate on this project is from $915,852 to $1,119,375 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


21.ACNU61882-ATRP(017), ACNU61883-ATRP(017) & ACNU61885-ATRP(017) ,SUMTER COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing, Traffic Stripe, Guardrail, and Culvert Extensions on CR-1 (Wire Road) from the intersection of CR-10 in Cuba to the Mississippi State Line (Site 1); on CR-23 from the junction of SR-28 in Coatopa to the junction of McDowell Road in Belmont (Site 2); and on CR-20 from the intersection of SR-17 to the junction of Henry Ware Road east of Sumterville (Site 3). Length 20.143 mi.

The Bracket Estimate on this project is from $3,269,899 to $3,996,543 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACOA58400-ATRP(010) ,MORGAN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on Austinville-Flint Road, Central Avenue Southwest, and Mill Road in Decatur as indicated in the plans. Length 3.541 mi.

The Bracket Estimate on this project is from $1,011,380 to $1,236,132 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACOA58404-ATRP(016) ,MORGAN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent: 7.00

for constructing the Resurfacing and Traffic Stripe on Moulton Street, CR-61 (Old Moulton Road), and 12th Avenue Southwest in Decatur as indicated in the plans. Length 2.027 mi.

The Bracket Estimate on this project is from $1,229,960 to $1,503,285 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACOA58459-ATRP(009) ,CALHOUN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on portions of Main Street, Astor Avenue, and Alexandria Road at sites in Weaver as indicated in the plans. Length 1.039 mi.

The Bracket Estimate on this project is from $405,390 to $495,476 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACOA63305-ATRP(018) ,LIMESTONE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on Hine Street from the intersection of SR-2 (US-72) to the junction of Elm Street in Athens. Length 2.001 mi.

The Bracket Estimate on this project is from $373,448 to $456,436 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.HSIP-4913(250) ,MOBILE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent: 6.00

for constructing the Intersection Improvements (Grade, Drain, Base, Pave, Additional Lanes, and Utilities Relocation) on CR-70 (Tanner Williams Road) at CR-523 (Eliza Jordan Road) west of Mobile. Length 0.367 mi.

The Bracket Estimate on this project is from $650,994 to $795,659 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.IM-I065(455) & IM-I065(464) ,BUTLER COUNTY

Contract Time: 100 Working Days

DBE Goal Percent: 3.00

for constructing the Pavement Rehabilitation on I-65 from the Conecuh County Line (MP 105.607) to 0.400 mile north of the Conecuh County Line (MP 106.000) and the Planing, Resurfacing, and Traffic Stripe from just north of the Conecuh County Line (MP 106.000) to 0.400 mile south of the CR-141 Overpass (MP 115.550). Length 9.942 mi.

The Bracket Estimate on this project is from $7,021,708 to $8,582,087 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.IM-I085(347) ,LEE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-85 from south of Exit 57 (MP 56.720) in Auburn to north of Exit 64 (MP 65.271) in Opelika. Length 8.551 mi.

The Bracket Estimate on this project is from $2,773,960 to $3,390,395 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.NH-0001(591) ,MARSHALL COUNTY

Contract Time: 65 Working Days

DBE Goal Percent: 7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of SR-79 in Guntersville to the south end of the Tennessee River Bridge (MP 297.570). Length 2.730 mi.

The Bracket Estimate on this project is from $1,525,800 to $1,864,867 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-0003(595) ,ESCAMBIA AND CONECUH COUNTIES

Contract Time: 60 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on SR-3 (US-31) from the pavement joint just south of the Escambia County Line (MP 81.196) to the junction of SR-12 (US-84) near Evergreen. Length 11.673 mi.

The Bracket Estimate on this project is from $1,785,922 to $2,182,793 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.NH-0005(549) ,BIBB COUNTY

Contract Time: 110 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-5 from the South City Limits of West Blocton to MP 105.468 in Woodstock. Length 7.160 mi.

The Bracket Estimate on this project is from $3,623,877 to $4,429,182 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-0074(536) ,MARION COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from near the junction of Ragsdale Avenue (MP 5.415) to the junction of Rollins Road (MP 5.749) and from the junction of Industrial Drive (MP 7.099) to west of the intersection of CR-57 (MP 11.154) in Hamilton. Length 4.389 mi.

The Bracket Estimate on this project is from $1,227,818 to $1,500,667 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.STPOA-0005(550) ,WALKER COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-5 from the SR-69 Overpass (MP 171.890) in Jasper to the Buck Creek Bridge (MP 180.958). Length 9.069 mi.

The Bracket Estimate on this project is from $2,042,206 to $2,496,030 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-0052(512) ,GENEVA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-52 from the intersection of SR-167 to the intersection of CR-69 in Hartford. Length 2.355 mi.

The Bracket Estimate on this project is from $706,394 to $863,369 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-0239(503) ,BARBOUR COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on SR-239 from Stinking Creek to the Bullock County Line. Length 6.279 mi.

The Bracket Estimate on this project is from $478,553 to $584,899 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-4915(250) ,MOBILE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 5.00

for constructing the Widening, Resurfacing, Guardrail Replacement, and Traffic Stripe on CR-33 (Dawes Road) from the junction of CR-32 (Three Notch Road) to the pavement joint 350 feet south of the intersection of Scott Dairy Loop Road South in Dawes. Length 1.864 mi.

The Bracket Estimate on this project is from $903,068 to $1,103,750 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-0253(505) ,MARION COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on SR-253 from the junction of SR-44 (MP 6.437) in Twin to the junction of CR-45 (MP 12.914). Length 6.476 mi.

The Bracket Estimate on this project is from $2,020,727 to $2,469,777 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-HSIP-0003(596) ,BUTLER COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from just north of the junction of CR-37 (MP 125.450) in Chapman to the pavement joint at MP 133.300. Length 7.850 mi.

The Bracket Estimate on this project is from $2,269,054 to $2,773,289 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-HSIP-0004(542) ,CALHOUN COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-4 (US-78) from near the junction of SR-1 (US-431/MP 166.715) east of Oxford to just west of the Cleburne County Line (MP 171.122). Length 4.407 mi.

The Bracket Estimate on this project is from $1,897,817 to $2,319,554 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0018(506) ,LAMAR COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-18 from the intersection of SR-17 in Vernon to the intersection of CR-49. Length 6.454 mi.

The Bracket Estimate on this project is from $2,229,122 to $2,724,482 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0097(505) ,LOWNDES COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-97 from the I-65 Interchange (Denied Access Limits/MP 14.934) to the intersection of SR-21 (MP 23.700). Length 8.765 mi.

The Bracket Estimate on this project is from $3,694,123 to $4,515,039 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-HSIP-0039(502) ,SUMTER COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-39 from north of Factory Creek Bridge (MP 5.603) to the Tombigbee River Bridge (MP 11.161) in Gainesville. Length 5.557 mi.

The Bracket Estimate on this project is from $1,863,538 to $2,277,658 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPBH-CN13(907) ,JEFFERSON COUNTY

Contract Time: 155 Working Days

DBE Goal Percent: 5.00

for constructing the Sidewalks, Crosswalks, and Signs on the Shades Creek Parkway from the Jemison Trail/Shades Creek Greenway Connection - Jemison Park to Brookwood Village.

The Bracket Estimate on this project is from $742,842 to $907,918 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPNU-0315(250) ,BARBOUR COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-15 from the Dale County Line to the junction of SR-51 in Clio (Site 1) and on CR-79 from the intersection of SR-131 to the junction of SR-30 east of Clayton (Site 2). Length 13.220 mi.

The Bracket Estimate on this project is from $769,335 to $940,299 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-1814(250) ,CONECUH COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-47 from the intersection of CR-24 to the Butler County Line south of McKenzie. Length 5.929 mi.

The Bracket Estimate on this project is from $378,950 to $463,161 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPNU-6215(250) ,TALLAPOOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-41 (Cowpens Road) from the junction of CR-61 (Goldville Cut Off Road) to the junction of SR-22 in New Site. Length 2.822 mi.

The Bracket Estimate on this project is from $489,780 to $598,620 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPOA-5214(250) ,MORGAN COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on South Greenway Drive from the junction of SR-24 (Gordon Terry Parkway) to the intersection of Old Highway 24 in Trinity. Length 0.874 mi.

The Bracket Estimate on this project is from $286,625 to $350,319 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.ST-051-110-008 ,MONTGOMERY COUNTY

Contract Time: 45 Working Days

for constructing the Access Management and Intersection Improvements (Widening, Resurfacing, Culvert Extension, Overhead Sign, Lighting Modifications, and Signals) on SR-126 (Atlanta Highway)/SR-110 (Chantilly Parkway) from west of the junction of Technacenter Drive to east of the junction of Eastchase Parkway in Montgomery. Length 0.896 mi.

The Bracket Estimate on this project is from $2,412,984 to $2,949,202 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.99-307-341-173-601 ,HENRY COUNTY

Contract Time: 50 Working Days

for constructing the Resurfacing and Traffic Stripe on SR-173 from the South Town Limits of Newville to the junction of SR-27 southwest of Abbeville. Length 8.572 mi.

The Bracket Estimate on this project is from $1,686,243 to $2,060,964 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)