1. STPMBF-STPAAF-7503(601), MOBILE 3. ACAA60992-ATRP(009), JEFFERSON
5. ACAA61001-ATRP(009), JEFFERSON 6. ACAA65112-ATRP(015), ELMORE
9. ACBR61814-ATRP(013), MORGAN 11. ACBR61358-ATRP(014), LAUDERDALE
17. ACNU59638-ATRP(005), MACON 18. ACNU60293-ATRP(005), BIBB
19. ACNU60429-ATRP(013), RANDOLPH 20. ACNU60991-ATRP(012), ETC., BUTLER
21. ACNU60374-ATRP(015), ETC., CLAY 23. ACOA59378-ATRP(010), CALHOUN
24. ACOA59431-ATRP(002), ETC., TUSCALOOSA 25. ACOA61088-ATRP(008), BARBOUR
34. IM-I059(391), ETC., TUSCALOOSA 35. IM-I065(460), MONTGOMERY
*38. NH-0002(570), LIMESTONE 40. NH-0009(559), CRENSHAW
41. NH-0013(597), TUSCALOOSA 42. NH-0020(525), LAWRENCE
43. NH-0053(577), MORGAN 44. NH-0013(602), WASHINGTON
45. NH-HSIP-0001(590), ETC., BARBOUR 46. NH-HSIP-0005(547), PERRY
50. STPAA-0016(518), BALDWIN 51. STPAA-0145(506), SHELBY
52. STPAA-0167(509), COFFEE 54. STPAA-HSIP-0022(524), RANDOLPH
55. STPAA-HSIP-0077(519), CLAY 56. STPAA-HSIP-0092(500), DALE, ETC.
57. STPAA-HSIP-0111(501), ELMORE, ETC. 58. STPAA-HSIP-0117(511), DEKALB
59. STPAA-HSIP-0169(502), RUSSELL 60. STPAA-HSIP-0227(502), ETC., DEKALB, ETC.
66. STPNU-3115(250), GENEVA 67. STPNU-3115(251), GENEVA
71. STPOA-0216(505), TUSCALOOSA 72. STPOA-0815(252), CALHOUN
73. STPOA-1714(256), ETC., COLBERT 74. STPOA-2815(250), ETOWAH
75. STPOA-4115(250), ETC., LEE 80. 99-507-700-690-501, GENEVA, ETC.
81. 99-509-022-182-600, BALDWIN 200. STPHV-4500(200), MADISON
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.STPMBF-STPAAF-7503(601) ,MOBILE COUNTY

Contract Time: 380 Working Days

DBE Goal Percent: 10.00

for constructing the Additional Lanes and Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on CR-372 (Schillinger Road) from the intersection of SR-42 (US-98) to the intersection of SR-217 (Lott Road). Length 1.572 mi.

The Bracket Estimate on this project is from $9,621,937 to $11,760,145 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $88.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.ACAA60992-ATRP(009) ,JEFFERSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on Martin Luther King Jr. Drive (6th Street Southwest/Lomb Avenue) from the intersection of Dennison Avenue Southwest to the intersection of Tuscaloosa Avenue in Birmingham. Length 1.420 mi.

The Bracket Estimate on this project is from $1,019,071 to $1,245,531 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.ACAA61001-ATRP(009) ,JEFFERSON COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on 1st Avenue North from the intersection of Center Street North to the junction of 4th Place North in Birmingham. Length 0.456 mi.

The Bracket Estimate on this project is from $345,113 to $421,805 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACAA65112-ATRP(015) ,ELMORE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-209 (Grier Road) from the junction of Weoka Road to the junction of Balm Road. Length 11.436 mi.

The Bracket Estimate on this project is from $2,564,183 to $3,134,001 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACBR61814-ATRP(013) ,MORGAN COUNTY

Contract Time: 150 Working Days

DBE Goal Percent: 6.00

for constructing the Bridge Replacement, Resurfacing, and Traffic Stripe on CR-73 (Cotaco Florette Road) from the intersection of SR-67 to the junction of SR-36 over Cotaco Creek north of Florette. Length 4.099 mi.

The Bracket Estimate on this project is from $1,700,697 to $2,078,630 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBR61358-ATRP(014) ,LAUDERDALE COUNTY

Contract Time: 50 Working Days

for constructing the Bridge Rehabilitation on Jackson Road in Florence. Length 0.051 mi.

The Bracket Estimate on this project is from $185,698 to $226,964 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACNU59638-ATRP(005) ,MACON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on CR-4 from the Montgomery County Line to the junction of CR-9 and on CR-9 from the junction of CR-4 to the intersection of SR-8 (US-80) southeast of Shorter. Length 9.243 mi.

The Bracket Estimate on this project is from $1,537,791 to $1,879,522 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACNU60293-ATRP(005) ,BIBB COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-36 from the Chilton County Line to the junction of SR-6 (US-82) southwest of Lawley. Length 1.469 mi.

The Bracket Estimate on this project is from $267,542 to $326,995 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACNU60429-ATRP(013) ,RANDOLPH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-65 from the junction of CR-26 to the junction of CR-62 northwest of Roanoke. Length 2.876 mi.

The Bracket Estimate on this project is from $479,852 to $586,485 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACNU60991-ATRP(012) & ACNU61017-ATRP(012) ,BUTLER COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 1.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-45 (Airport Road) from the North Greenville City Limits to the junction of Cassidy Road (Site 1) and on CR-62 from the junction of SR-3 (US-31) in Spring Hill to the Lowndes County Line (Site 2). Length 21.285 mi.

The Bracket Estimate on this project is from $1,259,333 to $1,539,185 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU60374-ATRP(015) & ACNU60375-ATRP(013) ,CLAY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-30 (Cragford Road) from the intersection of SR-49 to the junction of Wesobulga Creek Road and on CR-2 (Partridge Creek Road) from the junction of CR-7 to the junction of SR-9. Length 7.881 mi.

The Bracket Estimate on this project is from $1,022,834 to $1,250,130 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACOA59378-ATRP(010) ,CALHOUN COUNTY

Contract Time: 120 Working Days

for constructing the Traffic Signal Improvements along SR-21 at various locations in Jacksonville as indicated in the plans.

The Bracket Estimate on this project is from $1,064,131 to $1,300,605 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACOA59431-ATRP(002) & ACOA61866-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-140 from the Pickens County Line to the junction of SR-6 (US-82) west of Northport. Length 11.172 mi.

The Bracket Estimate on this project is from $1,859,220 to $2,272,381 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACOA61088-ATRP(008) ,BARBOUR COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Country Club Road from the junction of Firefox Road to the junction of West Barbour Street (Site 1); on West Barbour Street from the junction of Country Club Road to the intersection of SR-1 (US-431) (Site 2); and on West Broad Street from the junction of West Barbour Street to the intersection of SR-1 (US-431) (Site 3) in Eufaula. Length 2.299 mi.

The Bracket Estimate on this project is from $512,876 to $626,849 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.IM-I059(391), IM-I059(389) & IM-I059(390) ,TUSCALOOSA COUNTY

Contract Time: 240 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-59 from north of the Brookwood Interchange (Exit 86/MP 86.630) in Vance to the Jefferson County Line (MP 100.867). Length 14.234 mi.

The Bracket Estimate on this project is from $15,845,353 to $19,366,542 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.IM-I065(460) ,MONTGOMERY COUNTY

Contract Time: 300 Working Days

for constructing the Bridge Repairs (Girders, Caps, and Bearing Pads) on I-65 Southbound Relief Bridges 6, 7, and 8.

The Bracket Estimate on this project is from $1,786,926 to $2,184,020 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.NH-0002(570) ,LIMESTONE COUNTY

Contract Time: 95 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from just near the intersection of Jefferson Street (MP 74.600) in Athens to near the junction of McCulley Mill Road (MP 81.400). Length 6.552 mi.

The Bracket Estimate on this project is from $4,234,215 to $5,175,151 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


40.NH-0009(559) ,CRENSHAW COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on SR-9 (US-331) from north of the junction of Fulton Avenue in Brantley to south of the junction of Meadow Crest Drive in Luverne. Length 6.730 mi.

The Bracket Estimate on this project is from $2,364,160 to $2,889,528 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-0013(597) ,TUSCALOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the intersection of SR-6 (US-82) in Northport to MP 202.010. Length 3.916 mi.

The Bracket Estimate on this project is from $1,266,953 to $1,548,498 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.NH-0020(525) ,LAWRENCE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-20 from the Colbert County Line to MP 45.700 in Town Creek. Length 4.939 mi.

The Bracket Estimate on this project is from $1,937,409 to $2,367,945 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-0053(577) ,MORGAN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-53 (US-231) from north of the junction of Kennamer Drive (MP 301.030) south of Lacey Springs to the southern end of the Tennessee River Bridges (MP 306.530). Length 5.355 mi.

The Bracket Estimate on this project is from $2,825,641 to $3,453,561 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.NH-0013(602) ,WASHINGTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from north of McIntosh (MP 38.766) to 0.333 mile north of the Lewis Creek Bridge (MP 43.400). Length 4.633 mi.

The Bracket Estimate on this project is from $1,263,699 to $1,544,521 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.NH-HSIP-0001(590), NH-0006(561) & 99-407-036-001-501 ,BARBOUR COUNTY

Contract Time: 160 Working Days

DBE Goal Percent: 7.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from south of the junction of SR-131 (MP 61.484) to north of the intersection of SR-6 (US-82/MP 66.987) to include Drainage Improvements at the intersection of SR-6 (US-82) and south of Boundary Street; and Bridge Rail Retrofit over the Cheneyhatchee Creek and Barbour Creek in Eufaula (Site 1) and the Planing, Resurfacing, Traffic Stripe, and Abandoned Railroad Crossing Removal on SR-6 (US-82) from the intersection of SR-1 (US-431) in Eufaula to the Georgia State Line (Site 2). Length 6.090 mi.

The Bracket Estimate on this project is from $4,302,108 to $5,258,132 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.NH-HSIP-0005(547) ,PERRY COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-5 from north of the junction of SR-183 (MP 58.787) to south of the junction of SR-14 (MP 63.062) and on SR-183 from the junction of SR-5 (MP 20.268) to the junction of SR-14 (MP 21.273) in Marion. Length 5.279 mi.

The Bracket Estimate on this project is from $2,475,040 to $3,025,049 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-0016(518) ,BALDWIN COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-16 (US-90) from the junction of SR-59 in Robertsdale to the Florida State Line. Length 16.543 mi.

The Bracket Estimate on this project is from $2,634,824 to $3,220,340 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-0145(506) ,SHELBY COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-145 from the Chilton County Line to the junction of SR-61 (End of SR-145) southwest of Wilsonville. Length 12.034 mi.

The Bracket Estimate on this project is from $3,912,105 to $4,781,462 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-0167(509) ,COFFEE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-167 from south of the Pea River at the intersection of CR-154 to the Pike County Line. Length 12.344 mi.

The Bracket Estimate on this project is from $3,099,700 to $3,788,522 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0022(524) ,RANDOLPH COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-22 from MP 153.109 east of Dickert to MP 157.853 in Roanoke. Length 4.744 mi.

The Bracket Estimate on this project is from $1,558,494 to $1,904,826 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0077(519) ,CLAY COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 8.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-77 from the junction of SR-49 (MP 34.215) to west of Ashland Square (MP 43.860). Length 8.508 mi.

The Bracket Estimate on this project is from $1,974,022 to $2,414,694 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPAA-HSIP-0092(500) ,DALE, HOUSTON, AND COFFEE COUNTIES

Contract Time: 40 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on SR-92 from the junction of SR-167 in Coffee County to the junction of SR-12 (US-84) in Houston County. Length 10.916 mi.

The Bracket Estimate on this project is from $1,501,427 to $1,835,077 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-HSIP-0111(501) ,ELMORE AND AUTAUGA COUNTIES

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-111 from just north of the junction of Hogan Road (MP 11.478) in Holtville to the junction of SR-143 (MP 17.000). Length 5.522 mi.

The Bracket Estimate on this project is from $1,003,825 to $1,226,897 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-HSIP-0117(511) ,DEKALB COUNTY

Contract Time: 100 Working Days

DBE Goal Percent: 10.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-117 from the Georgia State Line to the junction of SR-7 (US-11) in Hammondville. Length 10.380 mi.

The Bracket Estimate on this project is from $4,290,955 to $5,244,501 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-HSIP-0169(502) ,RUSSELL COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-169 from the junction of SR-1 (US-431) north of Seale to the junction of SR-8 (US-80) in Crawford. Length 9.704 mi.

The Bracket Estimate on this project is from $1,970,244 to $2,408,075 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-HSIP-0227(502) & STPAA-HSIP-0227(503) ,DEKALB AND MARSHALL COUNTIES

Contract Time: 35 Working Days

DBE Goal Percent: 4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-227 from the junction of CR-400 south of Grove Oak to the junction of South Sauty Road and SR-62. Length 7.820 mi.

The Bracket Estimate on this project is from $1,930,397 to $2,359,374 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPNU-3115(250) ,GENEVA COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-4 from the junction of SR-52 to the junction of Spring Creek Road in Eunola. Length 0.441 mi.

The Bracket Estimate on this project is from $105,576 to $129,038 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPNU-3115(251) ,GENEVA COUNTY

Contract Time: 30 Working Days

for constructing the Widening, Resurfacing (Triple Layer Bituminous Surface Treatment), and Traffic Stripe on CR-65 from the intersection of CR-4 to the intersection of SR-52 northwest of Geneva. Length 2.702 mi.

The Bracket Estimate on this project is from $426,483 to $521,257 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPOA-0216(505) ,TUSCALOOSA COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-216 from just east of the junction of Booler Road (MP 21.000) to just west of the I-20/I-59 Interchange (MP 25.841) east of Lakeview. Length 4.221 mi.

The Bracket Estimate on this project is from $1,887,489 to $2,306,931 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPOA-0815(252) ,CALHOUN COUNTY

Contract Time: 30 Working Days

for constructing the Bicycle and Pedestrian Improvements on West 10th Street from the intersection of Pipe Street to the junction of Clydesdale Avenue (Site 1); on Clydesdale Avenue from the junction of West 10th Street to the junction of 11th Street (Site 2); and on 11th Street from the junction of Clydesdale Avenue to the junction of Cobb Avenue (Site 3) in Anniston. Length 0.905 mi.

The Bracket Estimate on this project is from $54,080 to $66,098 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPOA-1714(256), STPOA-1714(255) & STPOA-1714(254) ,COLBERT COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 6.00

for constructing the Resurfacing and Traffic Stripe on CR-51 from the Shoals Metropolitan Planning Organization (MPO) Limits to the junction of CR-65 (Site 1); on CR-22 (Old Highway 20) from the junction of SR-133 to the intersection of CR-48 in Leighton (Site 2); and on CR-48 from the North City Limits of Leighton to north of the intersection of SR-184 (Site 3). Length 10.311 mi.

The Bracket Estimate on this project is from $1,251,175 to $1,529,214 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPOA-2815(250) ,ETOWAH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Vandell Boulevard from the junction of Hickory Street to the junction of Forrest Avenue in Gadsden. Length 0.779 mi.

The Bracket Estimate on this project is from $351,116 to $429,142 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPOA-4115(250) & STPOA-4115(251) ,LEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-706 (East University Drive) from the junction of Old Mill Road to the junction of McKinley Avenue and from the junction of Cricket Lane to the junction of Windsor Drive in Auburn. Length 0.350 mi.

The Bracket Estimate on this project is from $410,667 to $501,927 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.99-507-700-690-501 ,GENEVA, DALE, COVINGTON, BARBOUR, HENRY, AND HOUSTON COUNTIES

Contract Time: 45 Working Days

for the Maintenance Bridge Painting on SR-153, SR-605, SR-239, SR-123, SR-95, SR-12 (US-84), SR-51, and SR-87 at various sites as indicated in the plans.

The Bracket Estimate on this project is from $717,899 to $877,433 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


81.99-509-022-182-600 ,BALDWIN COUNTY

Contract Time: 365 Calendar Days

for the Maintenance Dredging of Little Lagoon Pass in Gulf Shores as indicated in the plans.

The Bracket Estimate on this project is from $1,061,002 to $1,296,780 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPHV-4500(200) ,MADISON COUNTY

Contract Time: 30 Working Days

for constructing the Relocation (Structure Removal, Clearing and Grubbing) of Church Street from the intersection of Monroe Street to near the junction of Darryl Avenue. Length 0.463 mi.

The Bracket Estimate on this project is from $483,619 to $591,090 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items