Office Engineer

Proposal Letting List
May 27, 2016, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. NHF-0013(551), LAUDERDALE 4. ACAA59776-ATRP(012), MADISON
*9. ACNH-0005(512), ETC., JEFFERSON 10. ACBR59675-ATRP(009), MORGAN
14. ACBRZ59369-ATRP(014), ETC., CRENSHAW 16. ACBRZ59663-ATRP(005), LIMESTONE
18. ACBRZ61382-ATRP(014), ETOWAH 21. ACBR59643-ATRP(004), FRANKLIN
23. ACNU61388-ATRP(004), ST. CLAIR 26. ACOA61020-ATRP(010), BUTLER
29. BR-0021(548), TALLADEGA 30. CMAQ-5916(250), SHELBY
37. NH-0002(570), LIMESTONE 38. NH-0003(597), SHELBY
39. NH-0150(503), JEFFERSON 41. NH-HSIP-0052(510), HOUSTON
44. STPAA-HSIP-0014(535), ETC., TALLAPOOSA 46. STPAA-HSIP-0051(513), LEE
*47. STPAA-HSIP-0094(501), MONTGOMERY 50. STPNU-1016(251), ETC., CHEROKEE
53. STPOA-7434(600), CALHOUN 56. ST-049-000-010, MOBILE
*200. STPAA-0014(534), ELMORE
** - WITHDRAWN FROM LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.NHF-0013(551) ,LAUDERDALE COUNTY

Contract Time: 225 Working Days

DBE Goal Percent: 10.00

for constructing the Additional Lanes (Grade, Drain, Base, and Pave) on SR-13 (US-43) from the intersection of CR-140 to the Tennessee State Line. Length 3.335 mi.

The Bracket Estimate on this project is from $12,350,534 to $15,095,097.

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $71.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ACAA59776-ATRP(012) ,MADISON COUNTY

Contract Time: 150 Working Days

DBE Goal Percent: 12.00

for constructing the Additional Lanes (Grade, Drain, Base, Pave, and Signals) on CR-93 (Winchester Road) from the Flint River to 0.100 mile past the junction of Bell Factory Road. Length 0.568 mi.

The Bracket Estimate on this project is from $2,865,824 to $3,502,674 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $29.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACNH-0005(512) & ACBR-0005(513) ,JEFFERSON COUNTY

Contract Time: 6/29/2018 Completion Date

DBE Goal Percent: 5.00

for constructing the Additional Lanes and Bridge Replacement (Grade, Drain, Base, Pave, Signals, ITS Relocation, Lighting, and UST Removal) on SR-5 (US-78) from the I-20/59 Overpass to the junction of Finley Boulevard in Birmingham. Length 0.681 mi.

The Bracket Estimate on this project is from $17,080,310 to $20,875,935 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $93.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


10.ACBR59675-ATRP(009) ,MORGAN COUNTY

Contract Time: 200 Working Days

DBE Goal Percent: 5.00

for constructing the Bridge Replacement and Approaches on CR-28 (Vaughn Bridge Road) over Flint Creek west of Hartselle. Length 0.283 mi.

The Bracket Estimate on this project is from $2,567,951 to $3,138,606 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBRZ59369-ATRP(014) & ACBRZ59370-ATRP(014) ,CRENSHAW COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 5.00

for constructing the Bridge Replacement (Precast) on CR-35 (Swanner Bridge Road) over Little Patsaliga Creek south of Rutledge (Site 1) and on CR-35 (Swanner Bridge Road) over Horse Creek south of Rutledge (Site 2). Length 0.052 mi.

The Bracket Estimate on this project is from $787,592 to $962,613 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ59663-ATRP(005) ,LIMESTONE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 2.00

for constructing the Bridge Replacement and Approaches on CR-45 (Lucas Ferry Road) over Mud Creek southwest of Athens. Length 0.132 mi.

The Bracket Estimate on this project is from $410,970 to $502,296 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBRZ61382-ATRP(014) ,ETOWAH COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 2.00

for constructing the Bridge Replacement on CR-224 (Cox Gap Road) over Short Creek northeast of Mountainboro. Length 0.179 mi.

The Bracket Estimate on this project is from $438,749 to $536,249 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACBR59643-ATRP(004) ,FRANKLIN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on 4th Street (Golden Road) from the intersection of SR-19 to the Mississippi State Line to include Bridge Replacement over an unnamed tributary to Bear Creek in Red Bay. Length 1.654 mi.

The Bracket Estimate on this project is from $853,019 to $1,042,579 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU61388-ATRP(004) ,ST. CLAIR COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on CR-26 from the junction of SR-25 (US-231) in Ashville to west of the junction CR-335 (Days Drive) west of Ragland. Length 5.972 mi.

The Bracket Estimate on this project is from $1,439,363 to $1,759,222 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACOA61020-ATRP(010) ,BUTLER COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on North Conecuh Street, Airport Road, Glendale Avenue, and Hickory Street at various locations in Greenville as indicated in the plans. Length 3.328 mi.

The Bracket Estimate on this project is from $1,098,400 to $1,342,489 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.BR-0021(548) ,TALLADEGA COUNTY

Contract Time: 300 Working Days

DBE Goal Percent: 5.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-21 over Southern Railroad in Munford. Length 1.078 mi.

The Bracket Estimate on this project is from $6,738,774 to $8,236,279 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $69.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.CMAQ-5916(250) ,SHELBY COUNTY

Contract Time: 210 Working Days

DBE Goal Percent: 6.00

for constructing the Sidewalk Installation (Grade, Drain, Curb and Gutter) on CR-105 (Bearden Road) from the intersection of SR-3 (US-31) along Industrial Park Drive to Pelham High School. Length 1.458 mi.

The Bracket Estimate on this project is from $1,821,454 to $2,226,221 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.NH-0002(570) ,LIMESTONE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from just near the intersection of Jefferson Street (MP 74.600) in Athens to near the junction of McCulley Mill Road (MP 81.400). Length 6.552 mi.

The Bracket Estimate on this project is from $4,234,215 to $5,175,151 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.NH-0003(597) ,SHELBY COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 9.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, Guardrail End Anchors, and Traffic Stripe on SR-3 (US-31) from the Bishop Creek Bridge to the Jefferson County Line. Length 2.659 mi.

The Bracket Estimate on this project is from $1,973,234 to $2,411,730 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.NH-0150(503) ,JEFFERSON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, Guardrail End Anchors, and Traffic Stripe on SR-150 from the I-459 Overpass to the intersection of SR-3 (US-31) in Hoover. Length 2.806 mi.

The Bracket Estimate on this project is from $1,614,340 to $1,973,082 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-HSIP-0052(510) ,HOUSTON COUNTY

Contract Time: 110 Working Days

DBE Goal Percent: 12.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-52 from the junction of CR-55 east of Webb to the Georgia State Line. Length 8.338 mi.

The Bracket Estimate on this project is from $2,140,563 to $2,616,244 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPAA-HSIP-0014(535) & STPAA-HSIP-0049(507), TALLAPOOSA COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-14 from the beginning of the 2-Lane Section at MP 196.177 in Tallassee to MP 198.849 (Site 1) and on SR-49 from the intersection of SR-14 to MP 14.354 near Sougahatchee Creek (Site 2). Length 8.036 mi.

The Bracket Estimate on this project is from $3,228,389 to $3,945,808 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.STPAA-HSIP-0051(513) ,LEE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-51 from the Russell County Line (MP 98.120) to the Opelika City Limits (MP 111.980). Length 13.859 mi.

The Bracket Estimate on this project is from $3,696,940 to $4,518,482 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-HSIP-0094(501) ,MONTGOMERY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent: 5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-94 from the Ramer Town Limits (MP 6.000) to the junction of SR-53 (US-231) (MP 19.143). Length 13.142 mi.

The Bracket Estimate on this project is from $4,299,270 to $5,254,664 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


50.STPNU-1016(251) & STPNU-1016(250) ,CHEROKEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-46 from the junction of CR-91 to the junction of CR-41 in Broomtown and on CR-47 from the junction of CR-52 to the DeKalb County Line. Length 4.100 mi.

The Bracket Estimate on this project is from $434,746 to $531,356 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPOA-7434(600) ,CALHOUN COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on Coffee Street from the intersection of SR-21 to the junction of Alexandria Road in Jacksonville. Length 0.620 mi.

The Bracket Estimate on this project is from $242,288 to $296,129 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.ST-049-000-010 ,MOBILE COUNTY

Contract Time: 30 Working Days

for constructing the Demolition of Building Structures and Site Improvements on Old Water Street, Eslava Street, Royal Street, and Water Street in Mobile.

The Bracket Estimate on this project is from $163,960 to $200,396 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPAA-0014(534) ,ELMORE COUNTY

Contract Time: 45 Working Days

for constructing the Clearing, Grubbing, Structure and Underground Storage Tank Removal on SR-14 from just west of the junction of Coosada Parkway to a point east of the junction of SR-143 in Elmore. Length 1.353 mi.

The Bracket Estimate on this project is from $460,694 to $563,070 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)