June 24, 2016, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. ACAA58356-ATRP(007), MONTGOMERY 4. ACBR59397-ATRP(007), JACKSON
7. ACBRZ60393-ATRP(005), ETC., CLEBURNE 8. ACBRZ61134-ATRP(015), LEE
9. ACBRZ61186-ATRP(010), MOBILE 12. ACNH-0005(512), ETC., JEFFERSON
14. ACNU59687-ATRP(002), WINSTON 15. ACNU61004-ATRP(013), ETC., BUTLER
16. ACNU61393-ATRP(008), ST. CLAIR 17. ACNU62454-ATRP(009), FRANKLIN
20. ACOA61870-ATRP(017), TUSCALOOSA 23. BR-0053(529), SHELBY
24. BR-3713(250), JEFFERSON 25. FLAP-FLAP(002), LAWRENCE
27. HSIP-I059(386), GREENE 30. IM-I085(350), MONTGOMERY
*33. NH-0005(546), PERRY 34. NH-0008(583), PERRY
37. STPAA-0005(552), JEFFERSON 38. STPAA-0007(541), SUMTER
*40. STPAA-0076(505), TALLADEGA 41. STPAA-0091(505), CULLMAN
42. STPAA-2215(250), CULLMAN 45. STPAA-HSIP-0007(542), GREENE
49. STPAA-NR13(935), MARSHALL 55. STPNU-1915(256), COOSA
56. STPNU-3516(250), HOUSTON 57. STPNU-5015(250), MONROE
60. STPAA-HSIP-0216(504), TUSCALOOSA 61. STPOA-0814(251), CALHOUN
62. STPOA-0815(257), CALHOUN 68. ST-049-042-010, MOBILE
70. 99-408-503-021-317, MONROE 71. 99-503-690-000-102, JEFFERSON
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACAA58356-ATRP(007) ,MONTGOMERY COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing, Curb and Gutter, Sidewalk, Signals, and Traffic Stripe on CR-232 (Carter Hill Road) from the junction of Decatur Street to the junction of College Street in Montgomery. Length 0.923 mi.

The Bracket Estimate on this project is from $1,348,321 to $1,647,948 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $54.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ACBR59397-ATRP(007) ,JACKSON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-288 (Ridgedale Road) from the junction of CR-21 to the junction of SR-279 to include Bridge Culvert Replacement over Dry Creek in Scottsboro. Length 1.995 mi.

The Bracket Estimate on this project is from $974,600 to $1,191,178 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACBRZ60393-ATRP(005), ACBRZ60397-ATRP(011), ACBRZ61698-ATRP(014) & ACBRZ61700-ATRP(006) ,CLEBURNE COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches (Grade, Drain, Base, and Pave) on CR-96 over Silas Creek (Site 1); on CR-118 over Dynne Creek (Site 2); on CR-2 over Carr Creek (Site 3); and on CR-5 over Lockchelooge Creek (Site 4). Length 0.707 mi.

The Bracket Estimate on this project is from $1,353,826 to $1,654,676 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACBRZ61134-ATRP(015) ,LEE COUNTY

Contract Time: 50 Working Days

for constructing the Bridge Replacement (Precast) on CR-027 over Chewacla Creek west of Beauregard. Length 0.029 mi.

The Bracket Estimate on this project is from $359,355 to $439,211 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACBRZ61186-ATRP(010) ,MOBILE COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-63 (Wilmer-Georgetown Road) over Big Creek north of Wilmer. Length 0.672 mi.

The Bracket Estimate on this project is from $3,063,774 to $3,744,613 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $45.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.ACNH-0005(512) & ACBR-0005(513) ,JEFFERSON COUNTY

Contract Time: 400 Working Days

DBE Goal Percent:5.00

for constructing the Additional Lanes and Bridge Replacement (Grade, Drain, Base, Pave, Signals, ITS Relocation, Lighting, and UST Removal) on SR-5 (US-78) from the I-20/59 Overpass to the junction of Finley Boulevard in Birmingham. Length 0.681 mi.

The Bracket Estimate on this project is from $17,156,642 to $20,969,229 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $93.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACNU59687-ATRP(002) ,WINSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:12.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-77 (Helicon Road) from the junction of CR-41 (Jennifer L. Millican Parkway) in Arley to the junction of SR-74 (US-278). Length 10.058 mi.

The Bracket Estimate on this project is from $632,418 to $772,955 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACNU61004-ATRP(013) & ACNU61015-ATRP(013) ,BUTLER COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-8 from the junction of Garland East to the intersection of SR-3 (US-31) in McKenzie (Site 1) and on CR-59 from Pigeon Creek to the intersection of SR-106 (Site 2). Length 12.393 mi.

The Bracket Estimate on this project is from $1,119,811 to $1,368,658 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACNU61393-ATRP(008) ,ST. CLAIR COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 (Old Coal City Road) from the intersection of SR-53 (US-231) to the junction of SR-53 (US-231) north of Pell City. Length 7.012 mi.

The Bracket Estimate on this project is from $1,540,552 to $1,882,897 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACNU62454-ATRP(009) ,FRANKLIN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-11 and 4th Street from the junction of Happy Hollow Road to Bridge BIN 19621 north of Red Bay. Length 5.593 mi.

The Bracket Estimate on this project is from $601,579 to $735,263 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACOA61870-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Patching, Resurfacing, and Traffic Stripe on CR-85 (Daffron Road) from the junction of SR-6 (US-82) to the junction of Hargrove Road southeast of Tuscaloosa. Length 2.527 mi.

The Bracket Estimate on this project is from $441,818 to $539,999 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.BR-0053(529) ,SHELBY COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave, and Bridge) on SR-53 (US-231) over Kelly Creek north of Vincent. Length 0.549 mi.

The Bracket Estimate on this project is from $4,444,891 to $5,432,644 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $45.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.BR-3713(250) ,JEFFERSON COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement and Approaches to include Traffic Signal Replacement on the Southbound Roadway of CR-65 (Minor Parkway) over the BNSF Railroad. Length 0.319 mi.

The Bracket Estimate on this project is from $2,548,798 to $3,115,198 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $41.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.FLAP-FLAP(002) ,LAWRENCE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:12.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-70 from the Winston County Line to the junction of SR-33 (Site 1) and on CR-71 from the Winston County Line to the junction of CR-70 (Site 2). Length 6.679 mi.

The Bracket Estimate on this project is from $423,536 to $517,655 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.HSIP-I059(386) ,GREENE COUNTY

Contract Time: 115 Working Days

for constructing the Cable Guiderail Installation on I-59 from just north of the Sumter County Line (MP 27.292) to the Tuscaloosa County Line. Length 28.059 mi.

The Bracket Estimate on this project is from $1,221,891 to $1,493,422 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.IM-I085(350) ,MONTGOMERY COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:5.00

for constructing the Traffic and Pedestrian Improvements (Grade, Drain, Base, Pave, Signing, and Signals) on I-85 at the Ann Street Interchange in Montgomery. Length 0.183 mi.

The Bracket Estimate on this project is from $818,538 to $1,000,436 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.NH-0005(546) ,PERRY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Micro-Surfacing, and Traffic Stripe on SR-5 from MP 63.062 in Marion to the Bibb County Line (MP 76.735). Length 13.672 mi.

The Bracket Estimate on this project is from $1,596,512 to $1,951,293 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


34.NH-0008(583) ,PERRY COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, Traffic Stripe, and Signals on SR-8 (US-80) from west of the junction of Washington Street to east of the junction of Village Avenue in Uniontown (Site 1) and on SR-61 from the junction of SR-8 (US-80) in Uniontown to the Hale County Line (Site 2). Length 3.975 mi.

The Bracket Estimate on this project is from $1,368,653 to $1,672,798 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPAA-0005(552) ,JEFFERSON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Loop Detectors, Guardrail End Anchors, Inlet Replacement, Curb Ramps, and Traffic Stripe on SR-5 (US-78/Arkadelphia Road) from the junction of SR-7 (US-11) to the I-59 Interchange in Birmingham. Length 1.190 mi.

The Bracket Estimate on this project is from $651,631 to $796,438 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.STPAA-0007(541) ,SUMTER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the Sucarnoochee River Bridge (MP 16.582) to the intersection of SR-28 (MP 19.577) in Livingston. Length 2.994 mi.

The Bracket Estimate on this project is from $1,152,369 to $1,408,451 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPAA-0076(505) ,TALLADEGA COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-76 from the junction of SR-38 (US-231) in Childersburg to the junction of SR-21. Length 9.944 mi.

The Bracket Estimate on this project is from $2,618,449 to $3,200,327 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


41.STPAA-0091(505) ,CULLMAN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-91 from south of the junction of CR-38 (MP 14.330) northeast of Colony to the intersection of SR-3 (US-31/MP 25.170) in Hanceville. Length 10.839 mi.

The Bracket Estimate on this project is from $2,138,462 to $2,613,676 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-2215(250) ,CULLMAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-222 from the junction of CR-410 to the Good Hope City Limits. Length 4.913 mi.

The Bracket Estimate on this project is from $798,975 to $976,525 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.STPAA-HSIP-0007(542) ,GREENE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from MP 44.654 in Eutaw to south of the junction of CR-208. Length 4.356 mi.

The Bracket Estimate on this project is from $2,034,493 to $2,486,603 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-NR13(935) ,MARSHALL COUNTY

Contract Time: 80 Working Days

for constructing the Curb Ramp Installations and Modifications on various routes at various locations as indicated by the plans.

The Bracket Estimate on this project is from $595,517 to $727,854 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $28.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPNU-1915(256) ,COOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-66 from the Goodwater City Limits to the intersection of CR-49. Length 4.599 mi.

The Bracket Estimate on this project is from $478,751 to $585,140 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPNU-3516(250) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-55 from south of the junction of Noble Road to north of the Ashford City Limits. Length 6.102 mi.

The Bracket Estimate on this project is from $846,668 to $1,034,817 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPNU-5015(250) ,MONROE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from the Clarke County Line to the end of the paved roadway approximately 5.6 miles south. Length 5.614 mi.

The Bracket Estimate on this project is from $1,018,511 to $1,244,847 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-HSIP-0216(504) ,TUSCALOOSA COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, Guardrail, and Traffic Stripe on SR-216 from east of the junction of Lock 17 Road in Brookwood to the junction of CR-9. Length 4.010 mi.

The Bracket Estimate on this project is from $1,834,589 to $2,242,275 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPOA-0814(251) ,CALHOUN COUNTY

Contract Time: 35 Working Days

for constructing the Resurfacing and Sidewalk Connection on the Chief Ladiga Trail in Weaver. Length 2.497 mi.

The Bracket Estimate on this project is from $176,674 to $215,934 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPOA-0815(257) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Lenlock Lane from the junction of SR-1 (US-431) to the Anniston City Limits. Length 1.908 mi.

The Bracket Estimate on this project is from $448,081 to $547,654 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.ST-049-042-010 ,MOBILE COUNTY

Contract Time: 90 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-42 (US-98) from the junction of Stimpson Lane to the intersection of SR-16 (US-90/Broad Street) in Mobile. Length 4.749 mi.

The Bracket Estimate on this project is from $1,724,649 to $2,107,905 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.99-408-503-021-317 ,MONROE COUNTY

Contract Time: 35 Working Days

for constructing the Intersection Improvements (Turn Lane Installation) on SR-21 at the intersection of CR-27 southwest of Monroeville. Length 0.335 mi.

The Bracket Estimate on this project is from $418,102 to $511,014 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.99-503-690-000-102 ,JEFFERSON COUNTY

Contract Time: 100 Working Days

for the Maintenance Bridge Painting on SR-3 (US-31) at sites within the East Central Region as indicated in the plans.

The Bracket Estimate on this project is from $662,078 to $809,206 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)