Office Engineer

Proposal Letting List
July 29, 2016, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. ACNH39475F-I065(388), MOBILE 4. NHF-0013(535), LAUDERDALE
7. NHF-HSIPF-0013(549), CLARKE 10. ACAA60989-ATRP(009), JEFFERSON
11. ACAA60997-ATRP(009), JEFFERSON 14. ACBRZ59329-ATRP(010), CULLMAN
15. ACBRZ59365-ATRP(005), CHILTON 16. ACBRZ60361-ATRP(017), PERRY
17. ACBRZ60419-ATRP(003), RANDOLPH 18. ACBRZ60536-ATRP(006), GENEVA
21. ACNU60426-ATRP(013), RANDOLPH 22. ACNU61054-ATRP(008), TALLAPOOSA
25. ACOA59433-ATRP(010), COVINGTON 28. CMAQ-NR13(908), JEFFERSON
31. ERPR-8960(929), CLARKE *34. HSIP-0042(531), MOBILE
37. ITS-AL01(901), COLBERT, ETC. 39. NH-0002(570), LIMESTONE
40. NH-0001(592), MADISON 41. NH-0013(600), MOBILE
42. NH-0020(526), LAUDERDALE 44. STPAA-0014(509), ELMORE
45. STPAA-0016(519), MOBILE 46. STPAA-0025(545), CHEROKEE
47. STPAA-0076(505), TALLADEGA 48. STPAA-HSIP-0069(548), CLARKE
51. STPBH-3715(251), JEFFERSON 54. STPNU-0513(250), BLOUNT
55. STPNU-2416(250), DALLAS **56. STPNU-3015(251), ETC., FRANKLIN
57. STPNU-3614(251), JACKSON 58. STPNU-5115(250), MONTGOMERY
59. STPNU-6614(252), WILCOX 62. STPOA-3516(251), HOUSTON
**68. 99-406-062-015-601, BULLOCK
*-WITHDRAWN FROM THE LETTING
**-ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACNH39475F-I065(388) ,MOBILE COUNTY

Contract Time: 300 Working Days

DBE Goal Percent: 5.00

for constructing the Additional Lanes and Interchange Modifications (Grade, Drain, Base, Pave, Bridge Replacement, and Signals) on I-65 at CR-41 (Celeste Road) in Saraland. Length 0.207 mi.

The Bracket Estimate on this project is from $4,925,026 to $6,019,476 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $60.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.NHF-0013(535) ,LAUDERDALE COUNTY

Contract Time: 200 Working Days

DBE Goal Percent: 10.00

for constructing the Additional Lanes (Grade, Drain, Base, Pave, Signing, and Traffic Stripe) on SR-13 (US-43) from the junction of SR-64 to the intersection of CR-140 south of Green Hill. Length 1.902 mi.

The Bracket Estimate on this project is from $8,672,901 to $10,600,213 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $56.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.NHF-HSIPF-0013(549) ,CLARKE COUNTY

Contract Time: 120 Working Days

DBE Goal Percent: 8.00

for constructing the Safety Widening, Planing, Resurfacing, Traffic Stripe, and Roadway Improvements on SR-13 (US-43) from near the junction of CR-10 (Walker Springs Road) to 0.200 mile north of the junction of CR-3. Length 2.363 mi.

The Bracket Estimate on this project is from $3,835,309 to $4,687,600 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $82.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACAA60989-ATRP(009) ,JEFFERSON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on Five Mile Road, Lakeshore Parkway, Lomb Avenue, Georgia Road, and 1st Avenue North in Birmingham as indicated in the plans. Length 4.777 mi.

The Bracket Estimate on this project is from $2,608,003 to $3,187,559 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACAA60997-ATRP(009) ,JEFFERSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Clairmont Avenue from the junction of Essex Road to the junction of Rockford Road in Birmingham. Length 0.804 mi.

The Bracket Estimate on this project is from $431,423 to $527,294 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBRZ59329-ATRP(010) ,CULLMAN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent: 5.00

for constructing the Bridge Replacement on CR-216 (Beech Grove Road) over Bavar Creek in Good Hope. Length 0.233 mi.

The Bracket Estimate on this project is from $706,240 to $863,182 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBRZ59365-ATRP(005) ,CHILTON COUNTY

Contract Time: 40 Working Days

for constructing the Bridge Replacement on CR-535 over Mountain Creek north of Marbury. Length 0.006 mi.

The Bracket Estimate on this project is from $208,119 to $254,368 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ60361-ATRP(017) ,PERRY COUNTY

Contract Time: 60 Working Days

for constructing the Bridge Replacement on CR-211 (Ocmulgee Church Road) over an unnamed tributary to Oakmulgee Creek southeast of Suttle. Length 0.165 mi.

The Bracket Estimate on this project is from $316,942 to $387,373 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ60419-ATRP(003) ,RANDOLPH COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement and Approaches on CR-821 over Fixico Creek northwest of Ocre. Length 0.112 mi.

The Bracket Estimate on this project is from $83,091 to $101,555 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBRZ60536-ATRP(006) ,GENEVA COUNTY

Contract Time: 60 Working Days

for constructing the Bridge Replacement (Precast) on CR-203 (Spring Creek Road) over Spring Creek northeast of Black. Length 0.135 mi.

The Bracket Estimate on this project is from $406,804 to $497,205 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU60426-ATRP(013) ,RANDOLPH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-20 from the junction of SR-22 east of Roanoke to the Georgia State Line. Length 2.945 mi.

The Bracket Estimate on this project is from $518,628 to $633,879 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.ACNU61054-ATRP(008) ,TALLAPOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on Lafayette Street from the junction of Madwind Road to the junction of North Loop Road in Dadeville. Length 3.679 mi.

The Bracket Estimate on this project is from $731,757 to $894,370 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACOA59433-ATRP(010) ,COVINGTON COUNTY

Contract Time: 210 Working Days

DBE Goal Percent: 8.00

for constructing the Roadway Improvements (Grade, Drain, Base, and Pave) on SR-15 (South Three Notch Street) from the junction of SR-55 (US-29) to 100 feet north of the junction of Baker Street in Andalusia. Length 1.251 mi.

The Bracket Estimate on this project is from $4,169,416 to $5,095,953 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $46.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.CMAQ-NR13(908) ,JEFFERSON COUNTY

Contract Time: 180 Working Days

DBE Goal Percent: 9.00

for constructing Sidewalks along Brookwood Road, Crosshill Road, Oakdale Drive, Spring Valley Road, and Woodvale Road in Mountain Brook. Length 1.813 mi.

The Bracket Estimate on this project is from $1,373,717 to $1,678,987 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.ERPR-8960(929) ,CLARKE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 3.00

for constructing the Slide Repair and Permanent Restoration on SR-5 from 0.400 mile north of the junction of SR-13 (US-43) to 1.000 mile north of SR-13 (US-43) north of Thomasville. Length 0.165 mi.

The Bracket Estimate on this project is from $1,334,913 to $1,631,560 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.HSIP-0042(531) ,MOBILE COUNTY

Contract Time: 30 Working Days

for constructing the Installation of Centerline Rumble Strip along SR-42 (US-98) from a point near the Mississippi State Line (MP 0.290) to MP 7.089. Length 4.040 mi.

The Bracket Estimate on this project is from $66,183 to $80,890 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


37.ITS-AL01(901) ,COLBERT AND LAUDERDALE COUNTIES

Contract Time: 100 Working Days

for constructing the ITS Integration System on SR-2 (US-72) from the intersection of SR-2 (US-72) in Muscle Shoals to the junction of Indian Springs Road in Florence.

The Bracket Estimate on this project is from $943,440 to $1,153,093 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 AM on Thursday, July 21, 2016, at the Alabama Department of Transportation, North Region-Tuscumbia Area Office, Area Office Auditorium, 295 Highway 20 East, Tuscumbia, AL 35674. Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


39.NH-0002(570) ,LIMESTONE COUNTY

Contract Time: 95 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from just near the intersection of Jefferson Street (MP 74.600) in Athens to near the junction of McCulley Mill Road (MP 81.400). Length 6.552 mi.

The Bracket Estimate on this project is from $3,599,476 to $4,399,360 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.NH-0001(592) ,MADISON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent: 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the Marshall County Line to just south of the intersection of Old Highway 431 in New Hope. Length 3.729 mi.

The Bracket Estimate on this project is from $1,748,887 to $2,137,529 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-0013(600) ,MOBILE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from just south of the junction of SR-16 (US-90) in Prichard to just north of the intersection of SR-158 in Saraland. Length 4.691 mi.

The Bracket Estimate on this project is from $1,524,351 to $1,863,095 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.NH-0020(526) ,LAUDERDALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-20 from just east of the junction of CR-222 (MP 13.020) to east of the junction of SR-133 (MP 17.160) northwest of Florence. Length 4.269 mi.

The Bracket Estimate on this project is from $1,551,357 to $1,896,102 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPAA-0014(509) ,ELMORE COUNTY

Contract Time: 425 Working Days

DBE Goal Percent: 6.00

for constructing the Additional Lanes (Grade, Drain, Base, Pave, Bridges, Signals, and Underground Storage Tank Removal) on SR-14 from west of the junction of Coosada Parkway to east of the intersection of SR-143. Length 1.353 mi.

The Bracket Estimate on this project is from $17,427,402 to $21,300,157 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $86.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.STPAA-0016(519) ,MOBILE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-16 (US-90) from the Mississippi State Line to east of the intersection of Ramsey Road (MP 5.730) east of Grand Bay. Length 5.729 mi.

The Bracket Estimate on this project is from $1,464,508 to $1,789,954 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.STPAA-0025(545) ,CHEROKEE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-25 (US-411) from north of the Centre Bypass (MP 239.550) to MP 243.800. Length 4.250 mi.

The Bracket Estimate on this project is from $1,574,703 to $1,924,637 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-0076(505) ,TALLADEGA COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-76 from the junction of SR-38 (US-231) in Childersburg to MP 11.630. Length 4.977 mi.

The Bracket Estimate on this project is from $1,203,628 to $1,471,101 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-HSIP-0069(548) ,CLARKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-69 from Tallahatta Creek (MP 37.947) to Bashi Creek (MP 40.284). Length 2.336 mi.

The Bracket Estimate on this project is from $583,050 to $712,616 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPBH-3715(251) ,JEFFERSON COUNTY

Contract Time: 150 Working Days

DBE Goal Percent: 6.00

for constructing the Woodlawn Neighborhood Streetscape (Curb, Curb and Gutter, Sidewalks) along 1st Avenue South from the intersection of 55th Street North to north of the junction of 61st Street South in Birmingham. Length 0.562 mi.

The Bracket Estimate on this project is from $1,043,987 to $1,275,984 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $45.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPNU-0513(250) ,BLOUNT COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing, Guardrail, Signing, Intersection Improvements, and Traffic Stripe on CR-39 from the junction of SR-75 in Oneonta to the Etowah County Line. Length 8.481 mi.

The Bracket Estimate on this project is from $989,994 to $1,209,992 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPNU-2416(250) ,DALLAS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-222 from the junction of CR-37 to the junction of SR-22. Length 1.688 mi.

The Bracket Estimate on this project is from $424,227 to $518,499 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPNU-3015(251) & STPNU-3015(252) ,FRANKLIN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 10.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on CR-11 from the Mississippi State Line to the junction of Happy Holler Road and on CR-23 from the junction of CR-11 to the junction of SR-19. Length 12.829 mi.

The Bracket Estimate on this project is from $906,208 to $1,107,587 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

**ALL BIDS REJECTED**

Return To: Proposal Letting List (Top of web page)


57.STPNU-3614(251) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-33 from the intersection of Railroad Street in Hollywood to the junction of CR-229. Length 2.238 mi.

The Bracket Estimate on this project is from $386,265 to $472,101 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPNU-5115(250) ,MONTGOMERY COUNTY

Contract Time: 35 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-89 (Moore Road) from the intersection of SR-94 to the intersection of SR-53 (US-231). Length 3.893 mi.

The Bracket Estimate on this project is from $504,662 to $616,809 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPNU-6614(252) ,WILCOX COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-27 from the Clarke County Line to the junction of Church Street west of Pine Hill. Length 4.925 mi.

The Bracket Estimate on this project is from $870,471 to $1,063,909 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPOA-3516(251) ,HOUSTON COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-49 (S. Bay Springs Road) from the Geneva County Line to the intersection of Fortner Street west of Dothan. Length 0.523 mi.

The Bracket Estimate on this project is from $73,604 to $89,961 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.99-406-062-015-601 ,BULLOCK COUNTY

Contract Time: 40 Working Days

for constructing the Resurfacing and Traffic Stripe on SR-15 (US-29) from the Pike County Line to the junction of SR-197 in Union Springs. Length 18.999 mi.

The Bracket Estimate on this project is from $1,558,857 to $1,905,269 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

**ALL BIDS REJECTED**

Return To: Proposal Letting List (Top of web page)