Office Engineer

Proposal Letting List
August 26, 2016, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

7. IMF-I059(356), TUSCALOOSA 15. ACAA61009-ATRP(009), JEFFERSON
18. ACBRZ59616-ATRP(010), TUSCALOOSA 19. ACBRZ60297-ATRP(005), CHILTON
20. ACBRZ60360-ATRP(017), PERRY **21. ACBRZ61160-ATRP(005), BALDWIN
22. ACBRZ61360-ATRP(016), LAUDERDALE 23. ACBRZ61946-ATRP(011), LIMESTONE
26. ACNU61386-ATRP(011), ST. CLAIR 29. BR-0415(255), BIBB
37. IM-I065(461), MONTGOMERY 38. IM-I065(470), MOBILE
41. NH-0001(593), HOUSTON 42. NH-0008(571), DALLAS
43. ST-016-203-001, COFFEE 47. STPAA-0169(503), LEE
48. STPAA-HSIP-0227(504), DEKALB 49. STPAA-NR13(935), MARSHALL
51. STPNU-1316(250), CLARKE 52. STPNU-2116(250), CRENSHAW
*54. STPNU-5416(250), PICKENS *55. STPNU-6616(250), WILCOX
58. STPOA-0042(529), BALDWIN 61. ST-002-182-012, BALDWIN
66. 99-510-690-000-605, WALKER
*--WITHDRAWN FROM THE LETTING
**--ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


7.IMF-I059(356) ,TUSCALOOSA COUNTY

Contract Time: 180 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on I-59 from the Greene County Line to north of the SR-300 (Holley Springs Lane) Interchange in Fosters. Length 7.018 mi.

The Bracket Estimate on this project is from $9,584,783 to $11,714,735 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $42.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACAA61009-ATRP(009) ,JEFFERSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on West Valley Avenue from the junction of Barber Court to the intersection of Green Springs Highway (Site 1) and on Valley Avenue from the Birmingham City Limits to the junction of Richard Arrington Jr. Boulevard South (Site 2) in Homewood. Length 2.730 mi.

The Bracket Estimate on this project is from $1,352,688 to $1,653,285 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBRZ59616-ATRP(010) ,TUSCALOOSA COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 2.00

for constructing the Bridge Replacement on CR-826 (Malone Creek Road) over Malone Creek. Length 0.022 mi.

The Bracket Estimate on this project is from $360,945 to $441,155 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACBRZ60297-ATRP(005) ,CHILTON COUNTY

Contract Time: 40 Working Days

for constructing the Bridge Replacement on CR-255 over River Branch. Length 0.006 mi.

The Bracket Estimate on this project is from $245,698 to $300,297 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACBRZ60360-ATRP(017) ,PERRY COUNTY

Contract Time: 105 Working Days

for constructing the Bridge Replacement and Approaches on CR-92 over Williams Creek. Length 0.144 mi.

The Bracket Estimate on this project is from $558,353 to $682,431 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACBRZ61160-ATRP(005) ,BALDWIN COUNTY

Contract Time: 110 Working Days

DBE Goal Percent: 4.00

for constructing the Bridge Replacement and Approaches on CR-10 (Keller Road) over Boggy Branch south of Foley. Length 0.769 mi.

The Bracket Estimate on this project is from $648,376 to $792,459 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


22.ACBRZ61360-ATRP(016) ,LAUDERDALE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 4.00

for constructing the Bridge Replacement on Mars Hill Road over Cox Creek in Florence. Length 0.107 mi.

The Bracket Estimate on this project is from $396,567 to $484,693 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACBRZ61946-ATRP(011) ,LIMESTONE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 1.00

for constructing the Bridge Replacement on Quinn Road over Round Island Creek west of Athens. Length 0.113 mi.

The Bracket Estimate on this project is from $450,248 to $550,303 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACNU61386-ATRP(011) ,ST. CLAIR COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on Double Bridge Road from the junction of 5th Avenue in Ashville to the junction SR-7 (US-11). Length 4.445 mi.

The Bracket Estimate on this project is from $599,584 to $732,825 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.BR-0415(255) ,BIBB COUNTY

Contract Time: 90 Working Days

for the Bridge Painting (Coating) of structures on CR-12, CR-24, CR-26, CR-65, CR-10, Hopewell Church Road, and Harrisburg Road as indicated in the plans.

The Bracket Estimate on this project is from $704,771 to $861,387 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.IM-I065(461) ,MONTGOMERY COUNTY

Contract Time: 250 Working Days

for constructing the Bridge Repairs (Girders, Caps, and Bearing Pads) on I-65 Relief Bridges 4 and 5.

The Bracket Estimate on this project is from $1,483,176 to $1,812,771 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.IM-I065(470) ,MOBILE COUNTY

Contract Time: 40 Calendar Days

DBE Goal Percent: 3.00

for constructing the Partial Bridge Deck Repair/Replacement on I-65 Northbound and Southbound Bridges over Cottage Hill Road in Mobile. Length 0.232 mi.

The Bracket Estimate on this project is from $1,180,941 to $1,443,373 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-0001(593) ,HOUSTON COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-231) from the Florida State Line to just north of the intersection of CR-93 west of Hodgesville. Length 6.095 mi.

The Bracket Estimate on this project is from $3,356,957 to $4,102,948 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.NH-0008(571) ,DALLAS COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from the junction of SR-14 and SR-22 (MP 83.374) to the Edmund Pettus Bridge (MP 85.171) in Selma. Length 1.797 mi.

The Bracket Estimate on this project is from $792,350 to $968,427 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.ST-016-203-001 ,COFFEE COUNTY

Contract Time: 425 Working Days

for constructing the Additional Lanes (Grade, Drain, Base, Pave, Bridge, Bridge Removal, Signals, and Lighting) on SR-203 from the intersection of CR-364 to the junction of SR-125 in Elba. Length 1.465 mi.

The Bracket Estimate on this project is from $14,572,595 to $17,810,949 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $114.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-0169(503) ,LEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on SR-169 from the intersection of Meadows Mill Road (MP 16.000) to the junction of SR-51 in Opelika. Length 8.999 mi.

The Bracket Estimate on this project is from $904,403 to $1,105,381 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-HSIP-0227(504) ,DEKALB COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 8.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-227 from the junction of SR-68 in Crossville to just north of the intersection of SR-75 (MP 13.800) in Geraldine. Length 5.518 mi.

The Bracket Estimate on this project is from $1,166,657 to $1,425,914 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-NR13(935) ,MARSHALL COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 5.00

for constructing the Curb Ramp Installations and Modifications on various routes at various locations as indicated by the plans.

The Bracket Estimate on this project is from $595,517 to $727,854 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $28.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPNU-1316(250) ,CLARKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on CR-19 (Allen Walker Road) from the junction of CR-10 (Walker Springs Road) to the junction of CR-29 (Allen Road) south of Grove Hill. Length 7.145 mi.

The Bracket Estimate on this project is from $861,588 to $1,053,052 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPNU-2116(250) ,CRENSHAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 6.00

for constructing the Resurfacing and Traffic Stripe on CR-59 (Petrey Highway) from the junction of CR-50 (Live Oak Road) in Patsburg to the intersection of CR-30 (Bodiford Pool/Beaver Pond Road) in Petrey. Length 4.449 mi.

The Bracket Estimate on this project is from $542,623 to $663,206 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPNU-5416(250) ,PICKENS COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-9 from the junction of SR-86 to the junction of SR-6 (US-82) in Gordo. Length 2.142 mi.

The Bracket Estimate on this project is from $325,794 to $398,193 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


55.STPNU-6616(250) ,WILCOX COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 1.00

for constructing the Resurfacing and Traffic Stripe on CR-18 from the junction of CR-27 in Pine Hill to the intersection of SR-10 west of Yellow Bluff. Length 4.595 mi.

The Bracket Estimate on this project is from $765,325 to $935,397 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


58.STPOA-0042(529) ,BALDWIN COUNTY

Contract Time: 250 Working Days

for constructing the Adaptive Signal Installations along SR-42 (US-98) at various locations as indicated in the plans.

The Bracket Estimate on this project is from $1,793,964 to $2,192,622 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.ST-002-182-012 ,BALDWIN COUNTY

Contract Time: 125 Working Days

for constructing the Median Improvements and Beautification (Widening, Resurfacing, Traffic Stripe and Signals) on SR-182 from near the junction of Loop Road (MP 12.264) to just east of the Cotton Bayou Beach Access (MP 13.343). Length 1.032 mi.

The Bracket Estimate on this project is from $2,633,329 to $3,218,513 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $47.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.99-510-690-000-605 ,WALKER COUNTY

Contract Time: 30 Working Days

for the Maintenance Bridge Painting on SR-257 over Blackwater Creek northeast of Jasper.

The Bracket Estimate on this project is from $186,958 to $228,504 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items