Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. IMF-I065(411), CHILTON 4. RPF-0133(506), COLBERT
7. ACBRZ59366-ATRP(005), CHILTON 8. ACBRZ59436-ATRP(005), ETC., TALLADEGA
10. ACBRZ61139-ATRP(016), LEE 11. ACBRZ61306-ATRP(008), MARSHALL
15. ACNU62227-ATRP(014), PERRY 18. BR-0009(516), CLEBURNE
*19. BR-0173(500), HENRY 23. BRZ-5913(251), SHELBY
**26. CMAQ-NR13(933), JEFFERSON, ETC. 29. ERPR-9010(946), BULLOCK
30. ERPR-9010(961), MACON 31. ERPR-9010(963), MONTGOMERY
34. IM-I065(463), CULLMAN 36. NH-0002(568), COLBERT, ETC.
37. NH-0003(598), MORGAN 38. NH-0008(586), MONTGOMERY
39. NH-0053(578), PIKE 40. NH-0074(528), WINSTON
41. NH-0269(506), JEFFERSON 44. NH-HSIP-0009(561), COVINGTON
45. NH-0149(501), JEFFERSON 48. STPAA-0003(599), BALDWIN
52. STPAA-HSIP-0131(502), BARBOUR 53. STPAA-HSIP-0159(503), PICKENS
59. STPMB-7550(603), MOBILE 62. STPNU-1216(250), CHOCTAW
63. STPNU-2314(254), DALE 65. STPNU-2916(250), FAYETTE
66. STPNU-3815(250), LAMAR *67. STPNU-4014(251), LAWRENCE
68. STPNU-4316(250), LOWNDES, ETC. 69. STPNU-5616(250), RANDOLPH
70. STPNU-5716(254), RUSSELL 73. STPOA-0202(522), CALHOUN
74. STPOA-2216(250), CULLMAN 77. ST-035-053-003, HOUSTON
*-WITHDRAWN FROM THE LETTING
** - ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IMF-I065(411) ,CHILTON COUNTY

Contract Time: 190 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, Deceleration Lane Extension, Bridge Rail Retrofit, Guardrail, and Traffic Stripe on I-65 from the SR-3 (US-31) interchange to the SR-145 interchange in Clanton. Length 6.236 mi.

The Bracket Estimate on this project is from $11,127,435 to $13,600,198 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $38.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.RPF-0133(506) ,COLBERT COUNTY

Contract Time: 225 Working Days

DBE Goal Percent: 10.00

for constructing the Additional Lanes (Grade, Drain, Base, Pave, Traffic Stripe, and Signal Modifications) on SR-133 from the junction of SR-20 (Alternate US-72) to south of the Norfolk Southern Railroad in Muscle Shoals. Length 1.046 mi.

The Bracket Estimate on this project is from $5,729,960 to $7,003,284 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $44.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACBRZ59366-ATRP(005) ,CHILTON COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 2.00

for constructing the Bridge Replacement (Precast) on CR-32 over Walnut Creek northeast of Clanton. Length 0.022 mi.

The Bracket Estimate on this project is from $479,416 to $585,952 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACBRZ59436-ATRP(005) & ACBRZ59439-ATRP(005) ,TALLADEGA COUNTY

Contract Time: 180 Working Days

DBE Goal Percent: 5.00

for constructing the Bridge Replacements on Isbell Circle over Town Creek; on West Street over Isbell Branch; and on Coosa Street over Isbell Branch in Talladega. Length 0.201 mi.

The Bracket Estimate on this project is from $1,144,959 to $1,399,394 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $34.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ61139-ATRP(016) ,LEE COUNTY

Contract Time: 35 Working Days

for constructing the Bridge Replacement (Precast) on CR-376 over a tributary to Osanippa Creek. Length 0.007 mi.

The Bracket Estimate on this project is from $236,323 to $288,839 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ61306-ATRP(008) ,MARSHALL COUNTY

Contract Time: 90 Working Days

for constructing the Bridge Replacement on CR-213 (Glendale Road) at Eddy Branch northeast of Arab. Length 0.009 mi.

The Bracket Estimate on this project is from $268,650 to $328,350 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACNU62227-ATRP(014) ,PERRY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 2.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-21 from the junction of CR-1 to the Dallas County Line. Length 2.746 mi.

The Bracket Estimate on this project is from $775,794 to $948,192 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.BR-0009(516) ,CLEBURNE COUNTY

Contract Time: 225 Working Days

DBE Goal Percent: 6.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, Detour Bridge, and Bridge) on SR-9 over Cahulga Creek south of I-20 near Belltown. Length 0.473 mi.

The Bracket Estimate on this project is from $3,089,770 to $3,776,386 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $41.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.BR-0173(500) ,HENRY COUNTY

Contract Time: 175 Working Days

DBE Goal Percent: 6.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-173 over Blackwood Creek in Headland. Length 0.330 mi.

The Bracket Estimate on this project is from $3,342,052 to $4,084,731 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $25.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


23.BRZ-5913(251) ,SHELBY COUNTY

Contract Time: 180 Working Days

DBE Goal Percent: 6.00

for constructing the Bridge Replacement and Approaches on CR-311 over Mill Creek. Length 0.191 mi.

The Bracket Estimate on this project is from $789,264 to $964,656 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.CMAQ-NR13(933) ,JEFFERSON AND SHELBY COUNTIES

Contract Time: 55 Working Days

for constructing the Traffic Signal System Upgrades on SR-3 (US-31), Lorna Road, SR-150, Grove Boulevard, Galleria Boulevard, Chapel Lane, Jim Wilson Jr. Parkway, and CR-17 in Hoover.

The Bracket Estimate on this project is from $891,370 to $1,089,453 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


29.ERPR-9010(946) ,BULLOCK COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Slope Repair on SR-6 (US-82) at Milepost 182.200 just west of the junction of CR-37.

The Bracket Estimate on this project is from $153,204 to $187,250 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ERPR-9010(961) ,MACON COUNTY

Contract Time: 40 Working Days

for the Bridge Scour Repair on I-85 at MP 44.991 northeast of Tuskegee.

The Bracket Estimate on this project is from $257,345 to $314,533 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.ERPR-9010(963) ,MONTGOMERY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 6.00

for constructing the Slope Repair on SR-9 /US-331 (Southbound Lane) at Milepost 75.600 just north of the junction of Merrit Hay Road. Length 0.047 mi.

The Bracket Estimate on this project is from $198,108 to $242,132 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.IM-I065(463) ,CULLMAN COUNTY

Contract Time: 150 Working Days

DBE Goal Percent: 8.00

for constructing the Roadway Rehabilitation (Planing, Resurfacing, and Traffic Stripe) on I-65 from the Blount County Line to south of the CR-222 interchange in Good Hope. Length 13.545 mi.

The Bracket Estimate on this project is from $7,388,244 to $9,030,076 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.NH-0002(568) ,COLBERT AND LAUDERDALE COUNTIES

Contract Time: 30 Working Days

for constructing the Bridge Rail Retrofit on SR-2 /US-72 (Eastbound Lanes) over Dry Creek south of Muscle Shoals and over Royal Avenue in Florence. Length 0.204 mi.

The Bracket Estimate on this project is from $167,529 to $204,758 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.NH-0003(598) ,MORGAN COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the Flint Creek Bridge to near the junction of Atkeson Drive in Decatur. Length 2.536 mi.

The Bracket Estimate on this project is from $1,625,090 to $1,986,222 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.NH-0008(586) ,MONTGOMERY COUNTY

Contract Time: 105 Working Days

DBE Goal Percent: 8.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-8 from south of the junction of SR-6 to north of the I-85 Interchange in Montgomery. Length 3.107 mi.

The Bracket Estimate on this project is from $3,681,833 to $4,500,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.NH-0053(578) ,PIKE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 8.00

for constructing the Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-53 (US-231) from just south of the junction of Airport Road (MP 81.958) to the Montgomery County Line (MP 88.673). Length 6.715 mi.

The Bracket Estimate on this project is from $2,740,253 to $3,349,198 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.NH-0074(528) ,WINSTON COUNTY

Contract Time: 30 Working Days

for constructing the Bridge Rail Retrofit on SR-74 over The Sipsey River.

The Bracket Estimate on this project is from $140,883 to $172,191 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.NH-0269(506) ,JEFFERSON COUNTY

Contract Time: 45 Working Days

for constructing the Bridge Rail Retrofit on SR-269 over The Bayview Lake and Birmingham Terminal Railway Bridges in Birmingham. Length 0.386 mi.

The Bracket Estimate on this project is from $215,955 to $263,945 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.NH-HSIP-0009(561) ,COVINGTON COUNTY

Contract Time: 30 Working Days

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-9 from 0.300 mile north of the junction of Rodney J. Evans Drive to the North City Limits of Florala. Length 2.042 mi.

The Bracket Estimate on this project is from $553,971 to $677,075 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.NH-0149(501) ,JEFFERSON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 7.00

for constructing the Planing, Resurfacing, Guardrail, and Traffic Stripe on SR-149 from south of the SR-38 (US-280) Overpass to the intersection of Columbiana Road in Homewood. Length 2.951 mi.

The Bracket Estimate on this project is from $1,796,888 to $2,196,197 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-0003(599) ,BALDWIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 2.00

for constructing the Resurfacing and Traffic Stripe on SR-3 (US-31) from the junction of SR-16 (US-90) to west of the junction of Spanish Village in Spanish Fort. Length 0.735 mi.

The Bracket Estimate on this project is from $368,617 to $450,531 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-HSIP-0131(502) ,BARBOUR COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 9.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-131 from the junction of SR-10 to south of junction of CR-53 in Texasville. Length 8.043 mi.

The Bracket Estimate on this project is from $1,741,797 to $2,128,863 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-HSIP-0159(503) ,PICKENS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-159 from the junction of Raymond Robertson Road to the Fayette County Line. Length 4.478 mi.

The Bracket Estimate on this project is from $1,703,190 to $2,081,677 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPMB-7550(603) ,MOBILE COUNTY

Contract Time: 30 Working Days

for constructing the Clearing and Grubbing on CR-656 (Zeigler Boulevard) from the junction of Athey Road to the junction of Forest Hill Drive in Mobile. Length 2.764 mi.

The Bracket Estimate on this project is from $105,386 to $128,805 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPNU-1216(250) ,CHOCTAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 2.00

for constructing the Resurfacing and Traffic Stripe on CR-9 from the junction of SR-17 to the junction of Bonner Town Road in Toxey. Length 2.539 mi.

The Bracket Estimate on this project is from $449,823 to $549,784 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-2314(254) ,DALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 9.00

for constructing the Resurfacing and Traffic Stripe on CR-67 from the intersection of CR-16 to the junction of SR-27 in Echo. Length 4.728 mi.

The Bracket Estimate on this project is from $651,297 to $796,030 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPNU-2916(250) ,FAYETTE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 8.00

for constructing the Resurfacing, Traffic Stripe, and Guardrail on CR-53 from the intersection of CR-50 to the junction of CR-65 and on CR-65 from the junction of CR-53 to the Marion County Line. Length 5.501 mi.

The Bracket Estimate on this project is from $679,443 to $830,431 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPNU-3815(250) ,LAMAR COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on CR-23 from the junction of CR-26 to the junction of SR-118 (US-278) in Sulligent. Length 7.752 mi.

The Bracket Estimate on this project is from $775,363 to $947,665 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPNU-4014(251) ,LAWRENCE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-214 from the junction of SR-33 north of Langtown to the junction of CR-217. Length 4.029 mi.

The Bracket Estimate on this project is from $319,256 to $390,202 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


68.STPNU-4316(250) ,LOWNDES AND BUTLER COUNTIES

Contract Time: 30 Working Days

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-79 from the junction of SR-3 (US-31) in Butler County to the junction of SR-185 east of Fort Deposit. Length 1.682 mi.

The Bracket Estimate on this project is from $286,062 to $349,631 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPNU-5616(250) ,RANDOLPH COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 4.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-92 from the intersection of CR-25 to the junction of SR-48 southwest of Graham. Length 9.294 mi.

The Bracket Estimate on this project is from $1,375,060 to $1,680,629 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPNU-5716(254) ,RUSSELL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on CR-33 (Huguley Road) from the junction of CR-65 (Haddock Road) to the junction of CR-32 (Padgetts Road). Length 1.749 mi.

The Bracket Estimate on this project is from $335,741 to $410,350 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPOA-0202(522) ,CALHOUN COUNTY

Contract Time: 60 Working Days

for constructing the Roadway Lighting along SR-202 at the intersection of CR-109. Length 0.378 mi.

The Bracket Estimate on this project is from $221,433 to $270,641 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPOA-2216(250) ,CULLMAN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on CR-1339 & CR-1354 from the junction of SR-157 in Cullman to the junction of CR-1343. Length 3.638 mi.

The Bracket Estimate on this project is from $707,772 to $865,054 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.ST-035-053-003 ,HOUSTON COUNTY

Contract Time: 120 Working Days

for constructing the Culvert Extension and Slope Repair on SR-53/US-231 (Southbound Lane) at MP 27.100 north of Dothan. Length 0.160 mi.

The Bracket Estimate on this project is from $975,913 to $1,192,783 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)