Office Engineer

Proposal Letting List
January 27, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. RPF-NHF-0012(507), COFFEE 13. ACBRZ60534-ATRP(006), ETC., GENEVA
17. ACBRZ61892-ATRP(017), SUMTER 19. ACBRZ61894-ATRP(017), SUMTER
21. ACNU61726-ATRP (009), FAYETTE 29. BR-0173(500), HENRY
**31. BRZ-1314(252), CLARKE **33. BRZ-6314(251), TUSCALOOSA
36. ERPR-9010(944), LOWNDES 40. FBD-STPAA-FB12(900), BALDWIN
43. FLAP-FLAP(009), DEKALB 55. IMF-HSIPF-I759(301), ETC., ETOWAH
58. NH-0002(571), COLBERT 59. NH-0006(567), TUSCALOOSA
60. NH-0008(587), HALE 61. NH-0024(510), LAWRENCE
62. NH-0053(579), PIKE, ETC. *65. NH-HSIP-0021(553), TALLADEGA
68. RP-NH-0003(600), MORGAN 71. STPAA-0003(605), LOWNDES, ETC.
72. STPAA-0010(541), WILCOX 73. STPAA-0017(568), ETC., WASHINGTON
**74. STPAA-0028(510), MARENGO *75. STPAA-0076(506), TALLADEGA
76. STPAA-2615(253), ELMORE 77. STPOA-4115(253), LEE
79. STPAA-HSIP-0017(565), PICKENS 80. STPAA-HSIP-0022(525), COOSA
81. STPAA-HSIP-0022(526), DALLAS 82. STPAA-HSIP-0025(546), MARENGO
83. STPAA-HSIP-0041(517), ETC., WILCOX *84. STPAA-HSIP-0069(552), MARENGO
85. STPAA-0069(553), MARSHALL 86. STPAA-HSIP-0116(500), SUMTER
90. STPNU-2614(253), ELMORE 91. STPNU-5416(250), PICKENS
92. STPOA-6216(250), TALLAPOOSA 95. STPOA-1715(251), COLBERT
*100. ST-057-001-003, RUSSELL 104. 99-407-203-009-501, COVINGTON
105. 99-407-351-001-501, HOUSTON 107. 99-506-261-063-701, ELMORE
108. 99-507-690-000-601, DALE
* - WITHDRAWN FROM THE LETTING
** - ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.RPF-NHF-0012(507) ,COFFEE COUNTY

Contract Time: 380 Working Days

DBE Goal Percent: 7.50

for constructing the Additional Lanes (Grade, Drain, Base, Pave, and Traffic Stripe) on SR-12 (US-84) from just east of the junction of SR-87 in Elba to just east of the junction of CR-507. Length 4.508 mi.

The Bracket Estimate on this project is from $10,202,714 to $12,469,984 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $129.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


13.ACBRZ60534-ATRP(006) & ACBRZ60535-ATRP(006) ,GENEVA COUNTY

Contract Time: 80 Working Days

DBE Goal Percent: 4.00

for constructing the Bridge Replacements (Precast) on CR-155 (Wilson Jones Road) over Long Branch and on CR-152 (Bobby Jones Road) over Long Branch south of Coffee Springs. Length 0.253 mi.

The Bracket Estimate on this project is from $525,538 to $642,324 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ61892-ATRP(017) ,SUMTER COUNTY

Contract Time: 110 Working Days

for constructing the Bridge Replacement on Benn Kidd Road 0.100 mile east of the Norfolk Southern Railroad over Alamuchee Creek northeast of Cuba. Length 0.144 mi.

The Bracket Estimate on this project is from $1,160,196 to $1,418,017 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACBRZ61894-ATRP(017) ,SUMTER COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 3.00

for constructing the Bridge Replacement (Precast) on Lynn Bennett Road over Little Fourth Creek southeast of York. Length 0.136 mi.

The Bracket Estimate on this project is from $412,070 to $503,641 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU61726-ATRP (009) ,FAYETTE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on CR-63 from the Tuscaloosa County Line to the junction of SR-18 in Berry. Length 3.643 mi.

The Bracket Estimate on this project is from $539,052 to $658,841 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.BR-0173(500) ,HENRY COUNTY

Contract Time: 175 Working Days

DBE Goal Percent: 6.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-173 over Blackwood Creek in Headland. Length 0.330 mi.

The Bracket Estimate on this project is from $3,376,627 to $4,126,988 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $25.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


**31.BRZ-1314(252) ,CLARKE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent: 3.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on Clolinger Road over an Unnamed Stream and the Partial Roadway Removal to include the Relocation of an intersection in Jackson. Length 0.144 mi.

The Bracket Estimate on this project is from $673,422 to $823,071 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


**33.BRZ-6314(251) ,TUSCALOOSA COUNTY

Contract Time: 120 Working Days

DBE Goal Percent: 10.00

for constructing the Bridge Replacement on CR-55 (Old Jasper Road) over Tyro Creek north of Samantha. Length 0.029 mi.

The Bracket Estimate on this project is from $669,505 to $818,284 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


36.ERPR-9010(944) ,LOWNDES COUNTY

Contract Time: 30 Working Days

for constructing the Slope Repair on SR-263 (Northbound Lane) at MP 7.900 southeast of Braggs.

The Bracket Estimate on this project is from $115,865 to $141,613 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.FBD-STPAA-FB12(900) ,BALDWIN COUNTY

Contract Time: 35 Working Days

for constructing the Parking Lot Lighting Installation at the Mobile Bay Ferry Dock in Fort Morgan. Length 0.074 mi.

The Bracket Estimate on this project is from $118,843 to $145,252 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.FLAP-FLAP(009) ,DEKALB COUNTY

Contract Time: 35 Working Days

DBE Goal Percent: 4.00

for constructing the Resurfacing and Traffic Stripe on CR-255 from the junction of SR-176 to the junction of CR-78 west of Adamsburg. Length 2.025 mi.

The Bracket Estimate on this project is from $484,159 to $591,750 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.IMF-HSIPF-I759(301) & NH-0759(500) ,ETOWAH COUNTY

Contract Time: 180 Working Days

DBE Goal Percent: 6.00

for constructing the Planing, Resurfacing, Traffic Stripe, Lane Extensions, Guardrail Replacement, and Guiderail Installation on I-759 from the I-59 Interchange to the east end of the Coosa River Bridge and the Planing, Resurfacing, and Traffic Stripe on SR-759 from the end of I-759 (MP 4.935) to the junction of SR-291 (George Wallace Drive) in Gadsden. Length 5.581 mi.

The Bracket Estimate on this project is from $7,262,293 to $8,876,136 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $42.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.NH-0002(571) ,COLBERT COUNTY

Contract Time: 35 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from the junction of Old Lee Road to near the junction of Hawk Pride Mountain Road west of Tuscumbia. Length 1.212 mi.

The Bracket Estimate on this project is from $704,546 to $861,112 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.NH-0006(567) ,TUSCALOOSA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from east of the junction of 5th Street (MP 43.370) to west of 44th Avenue (MP 44.770) to include service roads from MP 43.282 to MP 43.470 and from MP 44.374 to MP 44.577 in Northport. Length 1.400 mi.

The Bracket Estimate on this project is from $974,673 to $1,191,267 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.NH-0008(587) ,HALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from the Marengo County Line to the Marengo County Line. Length 5.470 mi.

The Bracket Estimate on this project is from $1,473,349 to $1,800,760 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.NH-0024(510) ,LAWRENCE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent: 5.00

for constructing the Resurfacing and Traffic Stripe on SR-24 from just east of the junction of CR-122 (MP 47.540) to just west of the junction of CR-213 (MP 54.200) in Moulton. Length 6.628 mi.

The Bracket Estimate on this project is from $3,543,420 to $4,330,847 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.NH-0053(579) ,PIKE AND COFFEE COUNTIES

Contract Time: 75 Working Days

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-53 (US-231) from north of the junction of CR-82 west of Ariton to south of the junction of SR-93 in Brundidge. Length 7.369 mi.

The Bracket Estimate on this project is from $4,373,833 to $5,345,796 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.NH-HSIP-0021(553) ,TALLADEGA COUNTY

Contract Time: 70 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-21 from the junction of SR-275 South to the junction of SR-275 North in Talladega. Length 6.651 mi.

The Bracket Estimate on this project is from $1,803,722 to $2,204,549 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


68.RP-NH-0003(600) ,MORGAN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent: 10.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Bridge Rail Retrofit on SR-3 (US-31) near the junction of Lacon Road in Lacon to the intersection of SR-36 in Hartselle. Length 7.833 mi.

The Bracket Estimate on this project is from $3,150,834 to $3,851,020 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPAA-0003(605) ,LOWNDES AND BUTLER COUNTIES

Contract Time: 30 Working Days

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on SR-3 from the Piney Woods Creek Bridge (MP 147.899) to just south of the junction of Julian Town Road (MP 155.500) in Sandy Ridge. Length 7.600 mi.

The Bracket Estimate on this project is from $781,647 to $955,346 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPAA-0010(541) ,WILCOX COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-10 from 0.433 mile west of the Relief Bridge at MP 66.173 in Yellow Bluff to 0.170 mile west of the intersection of SR-221 (MP 74.873) in Camden. Length 8.699 mi.

The Bracket Estimate on this project is from $1,649,175 to $2,015,658 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPAA-0017(568) & STPAA-0017(569) ,WASHINGTON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent: 3.00

for constructing the Resurfacing and Traffic Stripe on SR-17 from the Dunbar Creek Bridge (MP 74.905) to the Choctaw County Line north of Millry and from the junction of SR-56 (MP 59.907) in Chatom to north of the junction of CR-5 (MP 70.766). Length 13.829 mi.

The Bracket Estimate on this project is from $2,393,370 to $2,925,231 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPAA-0028(510) ,MARENGO COUNTY

Contract Time: 35 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-28 from the junction of Lawrence Street in Linden to west of the junction of Airport Road. Length 4.601 mi.

The Bracket Estimate on this project is from $986,253 to $1,205,420 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


75.STPAA-0076(506) ,TALLADEGA COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-76 from 0.100 mile east of the junction of Mallory Lane (MP 11.630) east of Childersburg to the junction of SR-21 in Winterboro. Length 4.967 mi.

The Bracket Estimate on this project is from $1,572,824 to $1,922,340 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


76.STPAA-2615(253) ,ELMORE COUNTY

Contract Time: 5/1/2017 Completion Date

DBE Goal Percent: 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-7 (Deatsville Highway) from the intersection of SR-14 to the Northern City Limits of Millbrook. Length 1.953 mi.

The Bracket Estimate on this project is from $328,404 to $401,383 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.STPOA-4115(253) ,LEE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent: 6.00

for constructing the Full Depth Reclamation, Widening, Resurfacing, and Traffic Stripe on CR-379 from the junction of CR-372 to the Chambers County Line. Length 2.795 mi.

The Bracket Estimate on this project is from $1,001,296 to $1,223,806 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPAA-HSIP-0017(565) ,PICKENS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent: 4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-17 from north of the junction of Mccaa Bottom Road to south of the junction of Murphy Avenue in Aliceville. Length 4.939 mi.

The Bracket Estimate on this project is from $1,648,282 to $2,014,567 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.STPAA-HSIP-0022(525) ,COOSA COUNTY

Contract Time: 55 Working Days

DBE Goal Percent: 3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-22 from the junction of SR-9 to west of the Tallapoosa County Line (MP 109.732). Length 5.640 mi.

The Bracket Estimate on this project is from $2,164,262 to $2,645,209 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


81.STPAA-HSIP-0022(526) ,DALLAS COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 5.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-22 from the junction of CR-63 in Valley Grande to the Chilton County Line. Length 10.412 mi.

The Bracket Estimate on this project is from $1,535,330 to $1,876,514 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


82.STPAA-HSIP-0025(546) ,MARENGO COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-25 from north of the intersection of CR-32 to south of the railroad tracks in Thomaston. Length 10.904 mi.

The Bracket Estimate on this project is from $2,361,517 to $2,886,299 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


83.STPAA-HSIP-0041(517) & 99-508-000-405-702 ,WILCOX COUNTY

Contract Time: 60 Working Days

DBE Goal Percent: 5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-41 from the north end of the Gravel Creek Bridge to the intersection of SR-10 in Camden to include the Bridge Culvert Extension over Little Wolf Creek. Length 7.768 mi.

The Bracket Estimate on this project is from $1,903,412 to $2,326,393 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


84.STPAA-HSIP-0069(552) ,MARENGO COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:7.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-69 from the intersection of SR-10 west of Nanafalia to the junction of SR-114 in Myrtlewood. Length 10.451 mi.

The Bracket Estimate on this project is from $2,249,378 to $2,749,240 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


85.STPAA-0069(553) ,MARSHALL COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-69 from the junction of Main Street in Arab to the beginning of the Curb and Gutter section near MP 272.697 in Scant City. Length 4.549 mi.

The Bracket Estimate on this project is from $2,828,891 to $3,457,533 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


86.STPAA-HSIP-0116(500) ,SUMTER COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-116 from the junction of SR-17 north of Emelle to the junction of SR-39 in Gainesville. Length 9.482 mi.

The Bracket Estimate on this project is from $2,773,000 to $3,389,222 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


90.STPNU-2614(253) ,ELMORE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-356 (Double Bridge Ferry Road) from the junction of Main Street North to the junction of East Cotton Road in Eclectic. Length 3.489 mi.

The Bracket Estimate on this project is from $756,664 to $924,812 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


91.STPNU-5416(250) ,PICKENS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-9 from the junction of SR-86 to the junction of SR-6 (US-82) in Gordo. Length 2.142 mi.

The Bracket Estimate on this project is from $325,794 to $398,193 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


92.STPOA-6216(250) ,TALLAPOOSA COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-11 from the junction of SR-63 in Our Town to the City Limits of Alexander City. Length 5.993 mi.

The Bracket Estimate on this project is from $353,769 to $432,384 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


95.STPOA-1715(251) ,COLBERT COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on CR-20, CR-47, CR-148, CR-22, and CR-61 as indicated in the plans. Length 10.177 mi.

The Bracket Estimate on this project is from $1,062,381 to $1,298,465 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


100.ST-057-001-003 ,RUSSELL COUNTY

Contract Time: 100 Working Days

for constructing the Capacity Improvements (Planing, Resurfacing, Traffic Stripe, and Signals) on SR-1 (US-280) from north of the junction of Price Road to the interchange of SR-38 (US-280) / SR-1 (US-431) in Phenix City. Length 4.288 mi.

The Bracket Estimate on this project is from $2,293,512 to $2,803,182 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


104.99-407-203-009-501 ,COVINGTON COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-9 at the Florala Rest Area (Drive and Parking Area).

The Bracket Estimate on this project is from $142,669 to $174,373 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


105.99-407-351-001-501 ,HOUSTON COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-231) at the Welcome Center (Drive and Parking Area) south of Madrid.

The Bracket Estimate on this project is from $160,219 to $195,823 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


107.99-506-261-063-701 ,ELMORE COUNTY

Contract Time: 175 Working Days

for the Maintenance Bridge Painting on SR-63 at the Kowaliga Bridge over Lake Martin.

The Bracket Estimate on this project is from $2,306,079 to $2,818,540 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


108.99-507-690-000-601 ,DALE COUNTY

Contract Time: 40 Working Days

for constructing the Riprap Placement on various routes at various bridges in the Southeast Region.

The Bracket Estimate on this project is from $482,662 to $589,921 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)