April 07, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. BRF-0017(516), MARION 4. ACAA61880-ATRP(016), SUMTER
7. ACBRZ59462-ATRP(008), JEFFERSON *8. ACBRZ59636-ATRP(007), MACON
9. ACBRZ61136-ATRP(015), LEE 10. ACBRZ61816-ATRP(013), MORGAN
11. ACBRZ60401-ATRP(012), COOSA *12. BR-0018(503), FAYETTE
*15. ER-9010(935), PIKE 18. ERPR-9010(945), BULLOCK
21. NH-0006(566), BIBB 22. NH-0053(573), ETC., MADISON
23. NH-0133(509), COLBERT 29. SRTS-SR10(918), JEFFERSON
31. STPAA-0028(510), MARENGO 32. STPAA-0003(608), BUTLER
33. STPAA-0017(567), SUMTER 34. STPAA-0036(508), LAWRENCE
35. STPAA-0104(510), BALDWIN 36. STPAA-0172(504), MARION
37. STPAA-0213(503), MOBILE 40. STPAA-HSIP-0003(611), CHILTON
41. STPAA-HSIP-0003(604), CULLMAN 42. STPAA-HSIP-0014(537), AUTAUGA
43. STPAA-HSIP-0169(502), RUSSELL 48. STPBH-0003(593), JEFFERSON
52. STPMN-2616(251), ELMORE 54. STPNU-0316(250), BARBOUR
55. STPNU-0415(256), BIBB 56. STPOA-3016(251), ETC., FRANKLIN
59. STPOA-9059(601), LEE 201. STPAA-NR13(903), BUTLER, ETC.
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BRF-0017(516) ,MARION COUNTY

Contract Time: 330 Working Days

DBE Goal Percent:7.00

for constructing the Roadway Relocation, Safety Improvements, and Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-17 (US-43) from north of the junction of CR-41 to south of the junction of CR-53 southwest of Hackleburg. Length 1.685 mi.

The Bracket Estimate on this project is from $13,943,050 to $17,041,506 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $92.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ACAA61880-ATRP(016) ,SUMTER COUNTY

Contract Time: 45 Working Days

for constructing the Roadway Lighting Improvements on I-20/59 at the SR-28 Interchange (Exit 17) in Livingston. Length 0.833 mi.

The Bracket Estimate on this project is from $206,466 to $252,347 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACBRZ59462-ATRP(008) ,JEFFERSON COUNTY

Contract Time: 270 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement on CR-77 (Mt Olive Road) over Locust Fork a tributary of the Black Warrior River northwest of Mt Olive. Length 0.643 mi.

The Bracket Estimate on this project is from $6,239,030 to $7,625,481 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $35.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACBRZ59636-ATRP(007) ,MACON COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on CR-9 over Calebee Creek Relief No. 1 east of Shorter. Length 0.215 mi.

The Bracket Estimate on this project is from $1,227,216 to $1,499,931 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

WITHDRAWN FROM THE LETTING

 

Return To: Proposal Letting List (Top of web page)


9.ACBRZ61136-ATRP(015) ,LEE COUNTY

Contract Time: 35 Working Days

for constructing the Bridge Replacement on CR-144 over Little Uchee Creek northwest of Griffin Mill. Length 0.017 mi.

The Bracket Estimate on this project is from $595,059 to $727,294 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ61816-ATRP(013) ,MORGAN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches on Cedar Creek Church Road over Cedar Creek in Hartselle. Length 0.198 mi.

The Bracket Estimate on this project is from $572,186 to $699,339 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ60401-ATRP(012) ,COOSA COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement and Approaches on CR-107 over Jack Creek northwest of Rockford. Length 0.056 mi.

The Bracket Estimate on this project is from $326,279 to $398,786 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.BR-0018(503) ,FAYETTE COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-18 (US-43) over Deadwater Creek west of Berry. Length 0.343 mi.

The Bracket Estimate on this project is from $3,664,005 to $4,478,228 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

WITHDRAWN FROM THE LETTING

Return To: Proposal Letting List (Top of web page)


15. ER-9010(935) , PIKE COUNTY

Contract Time: 45 Working Days

for constructing the Culvert Extension and Slope Repair on SR-10 (US-231) at MP 169.000 (Southbound Lane) north of Troy. Length 0.122 mi.

The Bracket Estimate on this project is from $334,340 to $408,638 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

WITHDRAWN FROM THE LETTING

Return To: Proposal Letting List (Top of web page)


18.ERPR-9010(945) ,BULLOCK COUNTY

Contract Time: 30 Working Days

for constructing the Box Culvert Repair (Jack and Bore Installation) on SR-6 (US-82) at MP 185.200 in Hector.

The Bracket Estimate on this project is from $171,286 to $209,349 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.NH-0006(566) ,BIBB COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from the SR-5 Interchange (MP 81.517) to the Walter Owens Bridge (MP 83.236) in Centreville. Length 1.718 mi.

The Bracket Estimate on this project is from $1,270,485 to $1,552,815 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.NH-0053(573) & HSIP-0053(575) ,MADISON COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:8.00

for constructing the Roadway Safety Improvements, Planing, Resurfacing, and Traffic Stripe on SR-53 from south of the I-565 Interchange (MP 318.421) to north of the junction of Matsin Lake Road (MP 322.800) in Huntsville. Length 4.358 mi.

The Bracket Estimate on this project is from $2,786,435 to $3,405,642 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.NH-0133(509) ,COLBERT COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-133 from 1.100 miles north of the intersection of SR-184 to the south end of the Singing River Bridges (MP 6.522) in Muscle Shoals. Length 1.196 mi.

The Bracket Estimate on this project is from $879,634 to $1,075,108 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.SRTS-SR10(918) ,JEFFERSON COUNTY

Contract Time: 45 Working Days

for constructing the Sidewalks and Improvements along various routes at Leeds Middle School in Leeds. Length 0.372 mi.

The Bracket Estimate on this project is from $169,117 to $206,699 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.STPAA-0028(510) ,MARENGO COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-28 from the junction of Lawrence Street in Linden to west of the junction of Airport Road (MP 48.000). Length 4.601 mi.

The Bracket Estimate on this project is from $986,253 to $1,205,420 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.STPAA-0003(608) ,BUTLER COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from a point southwest of the Hawkins Creek Bridge (MP 133.300) southwest of Greenville to the Piney Woods Creek Bridge (MP 147.899). Length 14.598 mi.

The Bracket Estimate on this project is from $1,630,491 to $1,992,823 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.STPAA-0017(567) ,SUMTER COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Bridge Guardrail Retrofit on SR-17 from the Choctaw County Line to just north of Joe Bend Road (MP 131.840). Length 6.803 mi.

The Bracket Estimate on this project is from $2,190,466 to $2,677,236 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.STPAA-0036(508) ,LAWRENCE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-36 from the intersection of SR-157 south of Oakville to the Morgan County Line. Length 3.002 mi.

The Bracket Estimate on this project is from $717,197 to $876,574 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.STPAA-0104(510) ,BALDWIN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-104 from the junction of SR-42 (US-98) in Fairhope to the junction of SR-59 in Robertsdale. Length 10.490 mi.

The Bracket Estimate on this project is from $1,523,790 to $1,862,410 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.STPAA-0172(504) ,MARION COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-172 from the junction of SR-237 to the junction of SR-13 in Bear Creek. Length 3.829 mi.

The Bracket Estimate on this project is from $1,887,839 to $2,307,358 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPAA-0213(503) ,MOBILE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-213 from the intersection of SR-17 (US-45) in Prichard to the junction SR-158 in Saraland. Length 2.966 mi.

The Bracket Estimate on this project is from $508,565 to $621,580 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPAA-HSIP-0003(611) ,CHILTON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:7.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-3 (US-31) from the North City Limits of Jemison to the Shelby County Line. Length 6.334 mi.

The Bracket Estimate on this project is from $2,050,697 to $2,506,407 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.STPAA-HSIP-0003(604) ,CULLMAN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:8.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the intersection of 7th Street Southwest to the North City Limits of Cullman. Length 3.620 mi.

The Bracket Estimate on this project is from $2,424,026 to $2,962,699 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-HSIP-0014(537) ,AUTAUGA COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-14 from the junction of CR-21 in Autaugaville to the junction of SR-6 (US-82) in Prattville. Length 9.495 mi.

The Bracket Estimate on this project is from $3,716,698 to $4,524,631 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.STPAA-HSIP-0169(502) ,RUSSELL COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-169 from the junction of SR-1 (US-431) north of Seale to the junction of SR-8 (US-80) in Crawford. Length 9.704 mi.

The Bracket Estimate on this project is from $1,761,920 to $2,153,458 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPBH-0003(593) ,JEFFERSON COUNTY

Contract Time: 170 Working Days

DBE Goal Percent:2.00

for constructing the Roadway Lighting Improvements on SR-3 (US-31) from the Cahaba River to the junction of Patton Chapel Road in Hoover. Length 1.490 mi.

The Bracket Estimate on this project is from $1,067,396 to $1,304,595 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPMN-2616(251) ,ELMORE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Airport Road from the junction of Coosada Road in Coosada to the junction SR-14. Length 3.199 mi.

The Bracket Estimate on this project is from $541,120 to $661,369 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPNU-0316(250) ,BARBOUR COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-89 from the junction of SR-6 (US-82) in Lugo to the intersection of CR-49 in Spring Hill. Length 12.491 mi.

The Bracket Estimate on this project is from $908,409 to $1,110,277 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPNU-0415(256) ,BIBB COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-36 from the intersection of SR-139 to the Chilton County Line east of Randolph. Length 2.195 mi.

The Bracket Estimate on this project is from $594,535 to $726,654 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPOA-3016(251) & STPNU-3016(250) ,FRANKLIN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on CR-624 from the junction of SR-24 to the junction of West Lawrence Street in Russellville (Site 1) and on CR-44 from the junction of CR-244 to the junction of SR-24 in Russellville (Site 2). Length 4.079 mi.

The Bracket Estimate on this project is from $504,736 to $616,899 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPOA-9059(601) ,LEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-82 (Donahue Drive) from the junction of Cary Drive to the intersection of SR-147 (Shug Jordan Parkway) in Auburn. Length 1.050 mi.

The Bracket Estimate on this project is from $563,641 to $688,894 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


201.STPAA-NR13(903) ,BUTLER AND LOWNDES COUNTIES

Contract Time: 60 Working Days

for constructing the Curb Ramp Installations and Repairs on various routes at various locations as indicated in the plans.

The Bracket Estimate on this project is from $148,879 to $181,963 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.