April 28, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

6. ACBR60408-ATRP(011), COOSA 9. ACBRZ60359-ATRP(017), PERRY
10. ACBRZ60418-ATRP(013), RANDOLPH 11. ACBRZ60422-ATRP(013), RANDOLPH
14. ACNU61130-ATRP(015), ETC., LEE *15. ACNU66551-ATRP(006), TALLADEGA
18. ACOA61157-ATRP(004), BALDWIN 19. ACOA63309-ATRP(015), LIMESTONE
20. STPOA-ACOA8479-ATRP(007), ETOWAH 25. ERPR-9010(992), BARBOUR, ETC.
28. FRT-I065(471), ETC., BUTLER 31. HSIP-I059(393), DEKALB
34. IM-I065(474), MONTGOMERY 37. NH-0002(574), COLBERT
*38. NH-0038(536), TALLAPOOSA 39. NH-0042(532), MOBILE
40. NH-0077(520), ETOWAH 43. NH-HSIP-0006(565), AUTAUGA
44. NH-HSIP-0074(540), CULLMAN 47. NH-STPAA-0133(508), LAUDERDALE
*50. STPAA-0105(503), DALE, ETC. 51. STPAA-0115(251), ETC., AUTAUGA
*52. STPAA-0130(500), PIKE, ETC. *53. STPAA-0223(502), PIKE
56. STPAA-HSIP-0007(544), DEKALB 57. STPAA-HSIP-0014(538), DALLAS, ETC.
58. STPAA-HSIP-0015(527), LEE 59. STPAA-HSIP-0027(514), HENRY
60. STPAA-HSIP-0047(505), MONROE, ETC. 61. STPAA-HSIP-0049(508), TALLAPOOSA
62. STPAA-HSIP-0052(513), GENEVA 63. STPAA-0015(528), ETC., COVINGTON
64. STPAA-HSIP-0069(552), MARENGO 67. STPBH-UR13(603), JEFFERSON
70. STPNU-1816(250), CONECUH 71. STPNU-3116(250), ETC., GENEVA
72. STPNU-6016(253), ETC., SUMTER 73. STPNU-6717(250), WINSTON
76. STPOA-0216(250), BALDWIN 80. ST-059-070-002, SHELBY
83. 99-507-700-690-601, DALE, ETC. 201. STPAA-0035(532), JACKSON, ETC.
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


6.ACBR60408-ATRP(011) ,COOSA COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement (Precast) and Approaches on CR-125 over Paint Creek. Length 0.112 mi.

The Bracket Estimate on this project is from $538,364 to $658,000 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACBRZ60359-ATRP(017) ,PERRY COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement on CR-555 (Atkins Norfleet Road) over Dry Creek. Length 0.195 mi.

The Bracket Estimate on this project is from $526,376 to $643,349 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ60418-ATRP(013) ,RANDOLPH COUNTY

Contract Time: 90 Working Days

for constructing the Bridge Replacement and Approaches on CR-887 over High Pine Creek west of Roanoke. Length 0.094 mi.

The Bracket Estimate on this project is from $468,174 to $572,212 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ60422-ATRP(013) ,RANDOLPH COUNTY

Contract Time: 90 Working Days

for constructing the Bridge Replacement and Approaches on CR-845 over Cedar Creek northwest of Wadley. Length 0.094 mi.

The Bracket Estimate on this project is from $398,831 to $487,460 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACNU61130-ATRP(015) & ACNU61132-ATRP(015) ,LEE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-175 from the Russell County Line to the intersection of SR-169 (Site 1) and on CR-279 from the intersection of CR-270 west of Beulah to the Chambers County Line (Site 2). Length 6.003 mi.

The Bracket Estimate on this project is from $1,304,264 to $1,594,101 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACNU66551-ATRP(006) ,TALLADEGA COUNTY

Contract Time: 60 Working Days

for constructing the Interchange Lighting Rehabilitation on I-20 at SR-77 (Exit 168) in Lincoln. Length 0.776 mi.

The Bracket Estimate on this project is from $318,369 to $389,118 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


18.ACOA61157-ATRP(004) ,BALDWIN COUNTY

Contract Time: 90 Calendar Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements (Roundabout Installation) on CR-30 at the intersection of CR-13 in Fairhope. Length 0.394 mi.

The Bracket Estimate on this project is from $835,082 to $1,020,656 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACOA63309-ATRP(015) ,LIMESTONE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing, Culvert Extension, and Traffic Stripe on Nick Davis Road from the junction of Lindsay Lane in Athens to the intersection of Mooresville Road. Length 2.969 mi.

The Bracket Estimate on this project is from $493,585 to $603,271 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.STPOA-ACOA8479-ATRP(007) ,ETOWAH COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:10.00

for constructing the Roadway Improvements (Grade, Drain, Base, Pave, and Signals) on CR-162 (Steele Station Road) from the intersection of SR-77 to the intersection of CR-203 (Sutton Bridge Road) in Rainbow City. Length 1.047 mi.

The Bracket Estimate on this project is from $3,976,567 to $4,860,248 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $38.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ERPR-9010(992) ,BARBOUR, COFFEE, DALE, AND PIKE COUNTIES

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Riprap Placement at various bridges on SR-10, SR-12, SR-53, and the Veterans Memorial Bridge Historical Landmark in the Southeast Region.

The Bracket Estimate on this project is from $1,085,476 to $1,326,693 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.FRT-I065(471) & HSIP-I065(478) ,BUTLER COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-65 from 0.400 mile south of the CR-141 Overpass to 0.800 mile south of Beaver Creek to include the Cable Guiderail Installation from the Conecuh County Line to 0.500 mile north of the CR-28 Overpass east of Bolling. Length 24.028 mi.

The Bracket Estimate on this project is from $2,561,013 to $3,130,127 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.HSIP-I059(393) ,DEKALB COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Cable Guiderail Installation on I-59 from the SR-117 Interchange (MP 231.400) in Hammondville to the Georgia State Line. Length 9.799 mi.

The Bracket Estimate on this project is from $773,194 to $945,015 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.IM-I065(474) ,MONTGOMERY COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, Guardrail Upgrade, and Traffic Stripe on I-65 from Pintlala Creek Relief No. 1 (MP 159.886) to north of Pintlala Creek (MP 161.500) southwest of Hope Hull. Length 1.613 mi.

The Bracket Estimate on this project is from $1,841,855 to $2,251,156 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.NH-0002(574) ,COLBERT COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from east of the Norfolk Southern Railroad (MP 29.510) to the O'Neal Bridge (MP 30.900) in Sheffield. Length 1.424 mi.

The Bracket Estimate on this project is from $931,691 to $1,138,733 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.NH-0038(536) ,TALLAPOOSA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on SR-38 (US-280) from just east of the junction of SR-49 (MP 80.203) to the junction of East South Street in Dadeville. Length 4.078 mi.

The Bracket Estimate on this project is from $2,539,933 to $3,104,362 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


39.NH-0042(532) ,MOBILE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-42 (US-98) from the Mississippi State Line to the junction of Snow Road west of Semmes. Length 10.479 mi.

The Bracket Estimate on this project is from $1,717,581 to $2,099,266 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.NH-0077(520) ,ETOWAH COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-77 from south of the junction of Sunset Drive (MP 99.610) to the junction of Pinedale Drive (MP 101.480) in Southside. Length 1.870 mi.

The Bracket Estimate on this project is from $769,495 to $940,494 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-HSIP-0006(565) ,AUTAUGA COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-6 (US-82) from just east of the intersection of SR-14 to just west of the intersection of SR-3 (US-31) in Prattville. Length 2.569 mi.

The Bracket Estimate on this project is from $1,268,911 to $1,550,891 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.NH-HSIP-0074(540) ,CULLMAN COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from east of the junction of SR-69 in East Point to 0.250 mile east of the intersection of CR-747 in Berlin. Length 3.100 mi.

The Bracket Estimate on this project is from $2,324,245 to $2,840,743 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.NH-STPAA-0133(508) ,LAUDERDALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Veterans Drive from a point east of the Tennessee Southern Railroad to the Helton Drive Overpass and on SR-133 from the Helton Drive Overpass to the junction of Cox Creek Parkway (MP 8.962) in Florence. Length 1.614 mi.

The Bracket Estimate on this project is from $625,442 to $764,429 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-0105(503) ,DALE AND BARBOUR COUNTIES

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on SR-105 from north of the intersection of CR-33 in Skipperville to the junction of SR-10 southwest of Clopton. Length 9.809 mi.

The Bracket Estimate on this project is from $772,789 to $944,519 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


51.STPAA-0115(251) & STPMN-0115(250) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-80 from the Prattville City Limits to the junction of CR-85 (Site 1) and on CR-23 from the Prattville City Limits to the junction of SR-3 (US-31) (Site 2). Length 4.346 mi.

The Bracket Estimate on this project is from $478,381 to $584,688 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-0130(500) ,PIKE AND BARBOUR COUNTIES

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on SR-130 from the junction of SR-15 (US-29) east of Banks to the junction of SR-51 in Louisville. Length 15.444 mi.

The Bracket Estimate on this project is from $1,384,517 to $1,692,188 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


53.STPAA-0223(502) ,PIKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on SR-223 from the junction of SR-15 (US-29) in Banks to the Bullock County Line. Length 11.648 mi.

The Bracket Estimate on this project is from $1,162,488 to $1,420,819 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


56.STPAA-HSIP-0007(544) ,DEKALB COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the I-59 Interchange to the Fort Payne North City Limits. Length 2.439 mi.

The Bracket Estimate on this project is from $1,032,004 to $1,261,338 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-HSIP-0014(538) ,DALLAS AND AUTAUGA COUNTIES

Contract Time: 105 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-14 from east of the junction of SR-41 (MP 117.545) in Selma to the junction of CR-21 in Autaugaville. Length 22.243 mi.

The Bracket Estimate on this project is from $2,989,113 to $3,653,361 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-HSIP-0015(527) ,LEE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-15 (US-29) from west of the I-85 Interchange (MP 192.670) in Opelika to the Chambers County Line. Length 8.629 mi.

The Bracket Estimate on this project is from $2,259,068 to $2,761,083 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-HSIP-0027(514) ,HENRY COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-27 from the Dale County Line to the intersection of SR-1 (US-431) in Abbeville. Length 9.651 mi.

The Bracket Estimate on this project is from $1,930,754 to $2,359,810 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-HSIP-0047(505) ,MONROE AND WILCOX COUNTIES

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-47 from 0.364 mile north of the junction of SR-83 to the junction of SR-10 in Awin. Length 10.459 mi.

The Bracket Estimate on this project is from $1,770,700 to $2,164,189 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPAA-HSIP-0049(508) ,TALLAPOOSA COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-49 from north of Sougahatchee Creek (MP 14.676) to north of the intersection of SR-50 (MP 20.700). Length 6.024 mi.

The Bracket Estimate on this project is from $1,612,889 to $1,971,309 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPAA-HSIP-0052(513) ,GENEVA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-52 from east of the intersection of CR-69 to west of the junction of North Rex Street in Slocomb. Length 3.738 mi.

The Bracket Estimate on this project is from $799,260 to $976,873 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPAA-0015(528) & STPAA-HSIP-0055(513) ,COVINGTON COUNTY

Contract Time: 115 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on SR-15 (US-29) from the Escambia County Line to the junction of SR-55 (Truck Bypass) and Safety Widening, Resurfacing, and Traffic Stripe on SR-55 from the junction of SR-15 (Stanley Avenue) to 0.370 mile north of the junction of SR-55 (US-29). Length 18.522 mi.

The Bracket Estimate on this project is from $5,198,909 to $6,354,222 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $25.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-HSIP-0069(552) ,MARENGO COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:7.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-69 from the intersection of SR-10 west of Nanafalia to the junction of SR-114 in Myrtlewood. Length 10.451 mi.

The Bracket Estimate on this project is from $2,338,107 to $2,857,686 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPBH-UR13(603) ,JEFFERSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:10.00

for constructing the Sidewalks and Ramp Improvements on various routes throughout the City of Birmingham

The Bracket Estimate on this project is from $1,654,005 to $2,021,562 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPNU-1816(250) ,CONECUH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-85 from the junction of CR-6 to the junction of CR-29 south of Evergreen. Length 5.961 mi.

The Bracket Estimate on this project is from $441,103 to $539,126 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPNU-3116(250) & STPNU-3116(251) ,GENEVA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:9.00

for constructing the Resurfacing and Traffic Stripe on CR-4 from the junction of Spring Creek Road in Eunola to the junction of CR-53 (Site 1) and on CR-45 from the south end of the Choctawhatchee River Bridge to the intersection of CR-41 southwest of High Bluff (Site 2). Length 5.343 mi.

The Bracket Estimate on this project is from $806,333 to $985,518 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPNU-6016(253) & STPNU-6016(252) ,SUMTER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing, Culvert Extension, and Traffic Stripe on CR-20 from the junction of Henry Ware Road to the junction of SR-7 (US-11) in Epes (Site 1) and the Resurfacing and Traffic Stripe on CR-21 from the intersection of CR-20 in Epes to the junction of Miller Hill Road (Site 2). Length 8.522 mi.

The Bracket Estimate on this project is from $1,433,102 to $1,751,569 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPNU-6717(250) ,WINSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:12.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on CR-41 from the Walker County Line to the junction of CR-63 in Arley. Length 7.736 mi.

The Bracket Estimate on this project is from $470,593 to $575,169 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPOA-0216(250) ,BALDWIN COUNTY

Contract Time: 75 Working Days

for constructing the Intersection Improvements (Turn Lane Installation) on CR-13 at the intersection of Sehoy Boulevard and Longue Vue Boulevard in Daphne. Length 0.227 mi.

The Bracket Estimate on this project is from $558,416 to $682,509 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.ST-059-070-002 ,SHELBY COUNTY

Contract Time: 75 Working Days

for constructing the Intersection Improvements (Turn Lane Installation) on SR-70 at the intersection of CR-26 in Columbiana. Length 0.343 mi.

The Bracket Estimate on this project is from $1,211,277 to $1,480,450 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $27.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


83.99-507-700-690-601 ,DALE AND HOUSTON COUNTIES

Contract Time: 45 Working Days

for the Maintenance Bridge Painting (Coating Exposed Metal) on SR-92 and SR-52 at various bridges in the Southeast Region.

The Bracket Estimate on this project is from $441,509 to $539,623 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


201.STPAA-0035(532) ,JACKSON, CHEROKEE, AND ETOWAH COUNTIES

Contract Time: 60 Working Days

for constructing the Demolition and Structure Removal on SR-35, SR-77, and SR-9 at various locations as indicated in the plans.

The Bracket Estimate on this project is from $245,611 to $300,191 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)