Office Engineer

Proposal Letting List
May 26, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. IMF-I065(419), ETC., CHILTON 3. STPPC-ACAA59578-ATRP(013), RUSSELL
6. ACBRZ59327-ATRP(007), CHOCTAW 7. ACBRZ59636-ATRP(007), MACON
11. ACNU58354-ATRP(003), MACON 12. ACNU58583-ATRP(009), ETC., GENEVA
13. ACNU59622-ATRP(004), ETC., DALLAS 14. ACNU60585-ATRP(003), ETC., LOWNDES
17. ACNU61047-ATRP(008), MACON 18. ACNU66551-ATRP(006), TALLADEGA
20. BR-0018(503), FAYETTE 21. BR-0055(502), COVINGTON
27. ERPR-9010(137), RUSSELL 28. ERPR-9010(139), COFFEE
29. ERPR-9010(933), BARBOUR 30. ERPR-9010(964), MACON
34. FBD-STPAA-FB12(900), BALDWIN 37. FLAP-FLAP(013), CLARKE
40. HSIP-0008(585), MARENGO 43. NH-0001(597), ETOWAH
44. NH-0001(598), ETOWAH 45. NH-0002(575), LAUDERDALE
46. NH-0007(545), JEFFERSON 47. NH-0008(588), DALLAS
48. NH-0012(561), HOUSTON 49. NH-0193(505), MOBILE
50. NH-0038(536), TALLAPOOSA 52. NH-HSIP-0074(539), WINSTON
*55. NH-0003(609), ETC., SHELBY 56. STPAA-0007(543), GREENE
58. STPAA-0025(548), SHELBY 59. STPAA-0053(580), SHELBY
60. STPAA-0116(250), AUTAUGA 61. STPAA-0119(511), JEFFERSON
65. STPAA-HSIP-0018(507), LAMAR 66. STPAA-HSIP-0028(511), SUMTER
67. STPAA-HSIP-0050(504), TALLAPOOSA 68. STPAA-HSIP-0051(514), BULLOCK
74. STPNU-1017(251), ETC., CHEROKEE 75. STPNU-1917(250), COOSA
76. STPNU-2116(252), ETC., CRENSHAW 77. STPNU-3616(250), JACKSON
78. STPNU-3916(251), LAUDERDALE 81. STPOA-3517(250), HOUSTON
84. ST-002-I65-002, BALDWIN 88. 99-707-030-082-701, BARBOUR
200. BRZ-5216(250), MORGAN

*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IMF-I065(419), IMF-I065(420) & FRT-I065(468) ,CHILTON COUNTY

Contract Time: 11/1/2019 Completion Date

DBE Goal Percent:7.50

for constructing the Planing, Resurfacing, Bridgerail Retrofit, Guardrail Installation, and Traffic Stripe on I-65 from the Autauga County Line to the SR-3 (US-31/Exit 205) Interchange in Clanton and from the SR-145 Interchange (Exit 212) in Clanton to the Shelby County Line to include the Northbound and Southbound Rest Areas. Length 21.662 mi.

The Bracket Estimate on this project is from $22,642,806 to $27,674,540 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $56.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.STPPC-ACAA59578-ATRP(013) ,RUSSELL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on Crosswinds Road from the junction of SR-1 (US-431) to the junction of CR-28 (Sandfort Road) (Site 1) and on CR-96 (Knowles Road) from the junction of Crosswinds Road to the City Limits of Phenix City (Site 2). Length 1.820 mi.

The Bracket Estimate on this project is from $372,278 to $455,006 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACBRZ59327-ATRP(007) ,CHOCTAW COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-45 over Tuckabum Creek. Length 0.022 mi.

The Bracket Estimate on this project is from $450,800 to $550,978 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACBRZ59636-ATRP(007) ,MACON COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on CR-9 over Calebee Creek Relief No. 1 east of Shorter. Length 0.215 mi.

The Bracket Estimate on this project is from $1,107,821 to $1,354,004 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACNU58354-ATRP(003) ,MACON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-56 from the Tallapoosa County Line to the intersection of SR-199 east of Franklin. Length 6.240 mi.

The Bracket Estimate on this project is from $957,008 to $1,169,677 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12. ACNU58583-ATRP(009) & ACNU60539-ATRP(009) ,GENEVA COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on CR-25 from the Coffee County Line to the junction of SR-87 (Site 1) and on CR-17 from the junction of SR-153 to the junction of SR-52 in Samson (Site 2). Length 6.542 mi.

The Bracket Estimate on this project is from $1,060,527 to $1,296,200 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


13.ACNU59622-ATRP(004) & ACNU61042-ATRP(011) ,DALLAS COUNTY

Contract Time: 165 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, Reconstruction, and Traffic Stripe on CR-7 from a point 2.000 miles north of the junction of CR-12 in a southerly direction for approximately 0.790 mile (Site 1) and on CR-7 from the intersection of CR-62 to the north end of Mush Creek and from 0.750 mile south of Mush Creek to the junction of CR-12 in Pleasant Hill (Site 2). Length 5.137 mi.

The Bracket Estimate on this project is from $2,002,236 to $2,447,177 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACNU60585-ATRP(003) & ACNU60587-ATRP(003) ,LOWNDES COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 (Blue Hill Road) from the junction of SR-21 to the junction of CR-12 northwest of Gordonville (Site 1) and on CR-33 from the junction of CR-37 to the junction of SR-21 (Site 2). Length 14.578 mi.

The Bracket Estimate on this project is from $1,628,502 to $1,990,391 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACNU61047-ATRP(008) ,MACON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:9.00

for constructing the Resurfacing and Traffic Stripe on CR-40 from the junction of SR-8 (US-80) to the Town Limits of Shorter. Length 1.416 mi.

The Bracket Estimate on this project is from $288,392 to $352,479 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACNU66551-ATRP(006) ,TALLADEGA COUNTY

Contract Time: 60 Working Days

for constructing the Interchange Lighting Rehabilitation on I-20 at SR-77 (Exit 168) in Lincoln. Length 0.776 mi.

The Bracket Estimate on this project is from $318,369 to $389,118 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.BR-0018(503) ,FAYETTE COUNTY

Contract Time: 160 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-18 (US-43) over Deadwater Creek west of Berry. Length 0.343 mi.

The Bracket Estimate on this project is from $3,234,383 to $3,953,135 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.BR-0055(502) ,COVINGTON COUNTY

Contract Time: 330 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on SR-55 over the Yellow River. Length 0.834 mi.

The Bracket Estimate on this project is from $10,802,501 to $13,203,057 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $39.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ERPR-9010(137) ,RUSSELL COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:2.00

for constructing the Slope Repair (Back Slope Failure) on SR-1 (US-431) at MP 88.100 (Northbound Lane) southwest of Pittsview.

The Bracket Estimate on this project is from $560,878 to $685,517 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ERPR-9010(139) ,COFFEE COUNTY

Contract Time: 45 Working Days

for constructing the Scour Countermeasures on CR-107, CR-215, CR-305, and CR-474 at various bridges as indicated in the plans.

The Bracket Estimate on this project is from $168,264 to $205,657 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ERPR-9010(933) ,BARBOUR COUNTY

Contract Time: 30 Working Days

for constructing the Emergency Repair (Drainage Structure Improvements) on SR-51 (MP 33.756) north of Clio. Length 0.069 mi.

The Bracket Estimate on this project is from $145,679 to $178,052 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ERPR-9010(964) ,MACON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Slope Repair (Front Slope Failure) on I-85 (Northbound and Southbound Roadways) from MP 38.500 to MP 40.200.

The Bracket Estimate on this project is from $580,779 to $709,841 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.FBD-STPAA-FB12(900) ,BALDWIN COUNTY

Contract Time: 35 Working Days

for constructing the Parking Lot Lighting Installation at the Mobile Bay Ferry Dock in Fort Morgan. Length 0.074 mi.

The Bracket Estimate on this project is from $118,843 to $145,252 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.FLAP-FLAP(013) ,CLARKE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on Campbell Landing Access Road from the junction of CR-20 (Campbell Landing Road) to the boat ramp on the Tombigbee River. Length 0.391 mi.

The Bracket Estimate on this project is from $96,172 to $117,543 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.HSIP-0008(585) ,MARENGO COUNTY

Contract Time: 30 Working Days

for constructing the Roadway Lighting on SR-8 (US-80) at the intersection of SR-25 north of Faunsdale. Length 0.435 mi.

The Bracket Estimate on this project is from $251,948 to $307,936 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-0001(597) ,ETOWAH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the north end of the Line Creek Bridge south of Ridgeville to 0.300 mile north of the junction of Rockledge Road. Length 3.490 mi.

The Bracket Estimate on this project is from $864,886 to $1,057,083 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.NH-0001(598) ,ETOWAH COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from 0.300 mile north of the junction of Rockledge Road to the Marshall County Line. Length 6.852 mi.

The Bracket Estimate on this project is from $2,532,241 to $3,094,961 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.NH-0002(575) ,LAUDERDALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-2 (US-72) from just east of CR-31 (MP 45.000) to west of CR-421 (MP 48.000) in Center Star. Length 3.283 mi.

The Bracket Estimate on this project is from $1,133,179 to $1,384,997 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.NH-0007(545) ,JEFFERSON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the junction of 83rd Street North to the intersection of SR-75 to include 0.320 mile of Todd Alley. Length 1.925 mi.

The Bracket Estimate on this project is from $1,233,340 to $1,507,416 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.NH-0008(588) ,DALLAS COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8/SR-14 (US-80) from the junction of SR-14 to the junction of SR-41 in Selma. Length 3.387 mi.

The Bracket Estimate on this project is from $2,289,200 to $2,797,911 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.NH-0012(561) ,HOUSTON COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-12 (US-84) from east of the intersection of SR-123 north of Wicksburg to west of the Beaver Creek Bridge. Length 7.220 mi.

The Bracket Estimate on this project is from $4,018,015 to $4,910,907 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $51.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.NH-0193(505) ,MOBILE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-193 from near the junction of Higgins Road (MP 25.180) to the junction of Oak Ridge Avenue in Mobile. Length 1.294 mi.

The Bracket Estimate on this project is from $993,806 to $1,214,652 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.NH-0038(536) ,TALLAPOOSA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-38 (US-280) from just east of the junction of SR-49 (MP 80.203) to the junction of East South Street in Dadeville. Length 4.078 mi.

The Bracket Estimate on this project is from $2,615,406 to $3,196,607 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.NH-HSIP-0074(539) ,WINSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from east of the junction of CR-20 to west of the junction of Chilcoat Road in Double Springs. Length 5.581 mi.

The Bracket Estimate on this project is from $1,256,054 to $1,535,178 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55. NH-0003(609) & STPAA-0003(606) , SHELBY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.50

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-3 (US-31) from north of the junction of CR-68 in Alabaster to the Bishop Creek Bridge in Pelham (Site 1) and the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from north of the junction of Fulton Lake Road to the I-65 Overpass in Alabaster (Site 2). Length 5.519 mi.

The Bracket Estimate on this project is from $4,033,104 to $4,929,350 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


56.STPAA-0007(543) ,GREENE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Curb Ramp Improvements, and Traffic Stripe on SR-7 (US-11) from the junction of Prairie Avenue to a point near MP 44.654 in Eutaw (Site 1) and on SR-14 from the junction of Tuscaloosa Street to the junction of SR-7 (Boligee Street) in Eutaw (Site 2). Length 0.552 mi.

The Bracket Estimate on this project is from $357,507 to $436,953 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-0025(548) ,SHELBY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-25 from north of the intersection of CR-61 (MP 139.114) to the intersection of SR-38 (US-280) in Harpersville. Length 8.017 mi.

The Bracket Estimate on this project is from $3,592,600 to $4,390,955 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-0053(580) ,SHELBY COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-25/SR-53 (US-231) from the intersection of SR-38 (US-280) in Harpersville to the St. Clair County Line. Length 7.673 mi.

The Bracket Estimate on this project is from $3,772,792 to $4,611,191 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-0116(250) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-47 from the junction SR-14 to the junction of CR-86 in Prattville. Length 4.332 mi.

The Bracket Estimate on this project is from $358,573 to $438,256 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPAA-0119(511) ,JEFFERSON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-119 from the Shelby County Line to the junction of SR-4 (US-78) in Leeds. Length 7.895 mi.

The Bracket Estimate on this project is from $1,974,202 to $2,412,913 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-HSIP-0018(507) ,LAMAR COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-18 from the intersection of CR-49 to the Fayette County Line. Length 3.224 mi.

The Bracket Estimate on this project is from $1,542,366 to $1,885,114 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPAA-HSIP-0028(511) ,SUMTER COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-28 from the junction of SR-17 to the junction of SR-7 (US-11) in Livingston. Length 7.665 mi.

The Bracket Estimate on this project is from $2,415,320 to $2,952,058 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPAA-HSIP-0050(504) ,TALLAPOOSA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-50 from the intersection of SR-49 to the intersection of SR-38 (US-280) in Camp Hill. Length 11.325 mi.

The Bracket Estimate on this project is from $2,334,733 to $2,853,563 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-HSIP-0051(514) ,BULLOCK COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-51 from the Barbour County Line to the junction of SR-6 (US-82) in Midway. Length 5.749 mi.

The Bracket Estimate on this project is from $1,491,408 to $1,822,832 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPNU-1017(251) & STPNU-1017(250) ,CHEROKEE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:9.00

for constructing the Resurfacing, Guardrail Improvements, and Traffic Stripe on CR-33 from the junction of CR-308 to north of the junction of CR-172 (Site 1) and on CR-20 from the intersection of CR-7 to the junction of CR-150 west of Centre (Site 2). Length 4.598 mi.

The Bracket Estimate on this project is from $506,009 to $618,455 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPNU-1917(250) ,COOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-56 from the intersection of CR-55 to the intersection of CR-29 in Weogufka. Length 3.199 mi.

The Bracket Estimate on this project is from $349,468 to $427,128 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPNU-2116(252) & STPNU-2116(251) ,CRENSHAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-30 (Beaver Pond Road) from the intersection of CR-59 in Petrey to west of the bridge near the Pike County Line (Site 1) and on CR-28 (North Goshen Road) from the junction of SR-10 (US-29) to the Pike County Line (Site 2). Length 5.299 mi.

The Bracket Estimate on this project is from $600,939 to $734,481 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.STPNU-3616(250) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on CR-33 from the junction of CR-28 northwest of Hollywood to the intersection of CR-32. Length 1.855 mi.

The Bracket Estimate on this project is from $456,415 to $557,840 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.STPNU-3916(251) ,LAUDERDALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-144 from the junction of CR-47 to the junction of CR-33. Length 2.055 mi.

The Bracket Estimate on this project is from $418,407 to $511,386 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


81.STPOA-3517(250) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-51 (Omussee Road) from near the intersection of SR-52 to the junction of Webb Road. Length 1.229 mi.

The Bracket Estimate on this project is from $154,802 to $189,203 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


84.ST-002-I65-002 ,BALDWIN COUNTY

Contract Time: 160 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on I-65 from the SR-225 Interchange to the Dyas Creek Bridge. Length 8.533 mi.

The Bracket Estimate on this project is from $6,933,680 to $8,474,498 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


88.99-707-030-082-701 ,BARBOUR COUNTY

Contract Time: 60 Working Days

for constructing the Bridge Scour Repair on SR-6 (US-82) over the Chattahoochee River in Eufaula.

The Bracket Estimate on this project is from $278,535 to $340,431 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.BRZ-5216(250) ,MORGAN COUNTY

Contract Time: 70 Working Days

for constructing the Bridge Replacement and Approaches on V.S. Cemetery Road over Givens Branch northeast of Valhermoso Springs. Length 0.098 mi.

The Bracket Estimate on this project is from $354,318 to $433,055 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items