Office Engineer

Proposal Letting List
July 28, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

3. RPF-IMF-I065(467), LIMESTONE 6. ACBR60388-ATRP(011), CLEBURNE
10. ACBRZ60538-ATRP(009), GENEVA 11. ACBRZ62145-ATRP(005), LAUDERDALE
14. ACNU61189-ATRP(006), MOBILE 17. ACOA61040-ATRP(011), DALLAS
20. CMAQ-5915(251), SHELBY *23. ER-9010(935), PIKE
26. HSIP-0069(551), CULLMAN 27. HSIP-I059(400), JEFFERSON
30. NH-0013(603), MOBILE 31. NH-0035(530), DEKALB
32. NH-0053(581), MADISON 33. NH-0059(513), BALDWIN
34. NH-0001(596), BARBOUR 36. RP-IM-I059(366), ST. CLAIR
37. RP-IM-I059(395), ST. CLAIR 39. STPAA-0097(506), LOWNDES
40. STPAA-0017(570), SUMTER 41. STPAA-0017(572), CHOCTAW
42. STPAA-0219(506), PERRY 43. STPAA-HSIP-0245(501), BUTLER
44. STPAA-5115(252), MONTGOMERY 47. STPAA-HSIP-0018(508), FAYETTE
51. RECA-STPAA-HSIP-0171(513), FAYETTE 54. STPNU-0714(251), BUTLER
55. STPOA-2017(250), COVINGTON 58. STPOA-3917(250), LAUDERDALE
*59. STPOA-7457(601), CALHOUN 62. ST-037-999-017, JEFFERSON
63. ST-049-888-014, MOBILE
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


3.RPF-IMF-I065(467) ,LIMESTONE COUNTY

Contract Time: 240 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on I-65 and on the I-565 Ramps and Northbound Collector Distributor Lane at locations as indicated in the plans. Length 12.499 mi.

The Bracket Estimate on this project is from $15,590,200 to $19,054,689 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACBR60388-ATRP(011) ,CLEBURNE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on CR-49 over Roberts Creek northeast of Fruithurst. Length 0.036 mi.

The Bracket Estimate on this project is from $589,550 to $720,562 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ60538-ATRP(009) ,GENEVA COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Precast) on CR-74 (Emmett Road) over an Unnamed Tributary to Flat Creek northwest of Samson. Length 0.090 mi.

The Bracket Estimate on this project is from $229,607 to $280,630 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ62145-ATRP(005) ,LAUDERDALE COUNTY

Contract Time: 170 Working Days

DBE Goal Percent:10.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on CR-61 over Butler Creek northeast of Zip City. Length 0.129 mi.

The Bracket Estimate on this project is from $1,109,908 to $1,356,554 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $19.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACNU61189-ATRP(006) ,MOBILE COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:10.00

for constructing the Grade, Drain, Base, and Pave on Lott Road from the junction of Beverly Jefferies Highway to the junction of Brown-Blankenchip Road west of Citronelle. Length 2.272 mi.

The Bracket Estimate on this project is from $2,438,361 to $2,980,219 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACOA61040-ATRP(011) ,DALLAS COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Lapsley Street from the intersection of Minter Avenue to the intersection of 1st Avenue and on Summerfield Road from the intersection of 1st Avenue to the intersection of Woodrow Avenue in Selma. Length 1.690 mi.

The Bracket Estimate on this project is from $917,014 to $1,120,795 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.CMAQ-5915(251) ,SHELBY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:12.00

for constructing the Bike Lanes (Grade, Drain, Base, Pave, Resurfacing, and Traffic Stripe) along John Findlay Drive from North Trailhead to the Guard Station near the SR-119 entrance into Oak Mountain State Park in Pelham. Length 1.960 mi.

The Bracket Estimate on this project is from $1,282,687 to $1,567,728 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $48.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ER-9010(935) ,PIKE COUNTY

Contract Time: 90 Calendar Days

DBE Goal Percent:10.00

for constructing the Culvert Extension and Slope Repair on SR-10 (US-231) at MP 169.000 (Southbound Lane) north of Troy. Length 0.122 mi.

The Bracket Estimate on this project is from $335,211 to $409,703 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

**** WITHDRAWN FROM THE LETTING ****

Return To: Proposal Letting List (Top of web page)


26.HSIP-0069(551) ,CULLMAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Left Turn Lane (Grade, Drain, Base, and Pave) on SR-69 at the junction of CR-1545 (Gold Ridge Road) east of Cullman. Length 0.397 mi.

The Bracket Estimate on this project is from $439,965 to $537,735 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.HSIP-I059(400) ,JEFFERSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:12.00

for constructing the Interstate Median Crossover Protection, Bridge Rail Retrofit, and Guardrail Installation on I-59 from the SR-7 (US-11/1st Avenue North) Interchange in Birmingham to the CR-10 (Chalkville Mountain Road) Interchange in Trussville. Length 8.390 mi.

The Bracket Estimate on this project is from $1,203,754 to $1,471,255 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.NH-0013(603) ,MOBILE COUNTY

Contract Time: 105 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the junction of Dogwood Drive in Satsuma to the Cold Creek Bridge (MP 17.621). Length 8.221 mi.

The Bracket Estimate on this project is from $2,702,471 to $3,303,020 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.NH-0035(530) ,DEKALB COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:9.00

for constructing the Planing, Resurfacing, Safety Improvements, and Traffic Stripe on SR-35 from south of the junction of Deerman Avenue to south of the Northern City Limits of Rainsville (Site 1) and on SR-75 from MP 84.820 to MP 85.040 (Site 2). Length 1.920 mi.

The Bracket Estimate on this project is from $840,910 to $1,027,779 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.NH-0053(581) ,MADISON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-53 from north of the junction of Taurus Drive in Harvest to the Limestone County Line. Length 7.830 mi.

The Bracket Estimate on this project is from $2,095,139 to $2,560,725 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.NH-0059(513) ,BALDWIN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-59 from north of the junction of SR-182 to the south end of the Intercoastal Waterway Bridge in Gulf Shores. Length 1.858 mi.

The Bracket Estimate on this project is from $694,692 to $849,068 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.NH-0001(596) ,BARBOUR COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from 0.250 mile south of the junction of Lindsey Drive to the Russell County Line. Length 7.646 mi.

The Bracket Estimate on this project is from $2,891,826 to $3,534,453 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.RP-IM-I059(366) ,ST. CLAIR COUNTY

Contract Time: 220 Working Days

DBE Goal Percent:10.00

for constructing the Pavement Rehabilitation, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail, Rest Area Parking Rehabilitation, and Traffic Stripe on I-59 from north of the SR-53 (US-231) Interchange in Ashville to the Etowah County Line. Length 8.591 mi.

The Bracket Estimate on this project is from $11,141,636 to $13,617,555 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.RP-IM-I059(395) ,ST. CLAIR COUNTY

Contract Time: 240 Working Days

DBE Goal Percent:7.00

for constructing the Pavement Rehabilitation, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail, and Traffic Stripe on I-59 from north of the SR-23 Interchange to north of the SR-53 (US-231) Interchange in Ashville. Length 10.258 mi.

The Bracket Estimate on this project is from $11,326,632 to $13,843,662 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.STPAA-0097(506) ,LOWNDES COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-97 from the intersection of SR-21 in Hayneville to the junction of SR-8 (US-80) in Lowndesboro. Length 5.998 mi.

The Bracket Estimate on this project is from $866,871 to $1,059,509 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPAA-0017(570) ,SUMTER COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from north of Joe Bend Road (MP 131.840) to south of the SR-8 (US-80) Interchange (MP 136.438) south of York. Length 4.598 mi.

The Bracket Estimate on this project is from $1,629,233 to $1,991,285 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.STPAA-0017(572) ,CHOCTAW COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from the Washington County Line to the Souwilpa Creek Bridge (MP 83.998) in Silas. Length 6.039 mi.

The Bracket Estimate on this project is from $1,359,640 to $1,661,782 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-0219(506) ,PERRY COUNTY

Contract Time: 35 Working Days

for constructing the Resurfacing (Micro-Surfacing Seal Coat and Scrub Seal) and Traffic Stripe on SR-219 from the junction of SR-183 to the Bibb County Line. Length 5.920 mi.

The Bracket Estimate on this project is from $624,368 to $763,117 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.STPAA-HSIP-0245(501) ,BUTLER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:7.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-245 from the junction of SR-10 to the junction of SR-185 in Greenville (Site 1) and on SR-10 from just west of the junction of College Street to the junction of Bolling Street in Greenville (Site 2). Length 2.899 mi.

The Bracket Estimate on this project is from $1,454,248 to $1,777,414 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPAA-5115(252) ,MONTGOMERY COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Widening, Resurfacing, and Traffic Stripe on CR-85 (Pike Road) from the junction of CR-83 (Wallahatchie Road) to the junction of SR-126 (US-80). Length 5.851 mi.

The Bracket Estimate on this project is from $1,617,492 to $1,976,935 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-HSIP-0018(508) ,FAYETTE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, Guardrail, and Traffic Stripe on SR-18 (US-43) from the intersection of SR-13 (The Berry "Y") to west of the junction of CR-125 northeast of Berry. Length 7.014 mi.

The Bracket Estimate on this project is from $3,102,074 to $3,791,423 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.RECA-STPAA-HSIP-0171(513) ,FAYETTE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, Curb Ramp Installation, and Traffic Stripe on SR-171 from north of the junction of SR-159 in Fayette to north of the junction of SR-102. Length 7.088 mi.

The Bracket Estimate on this project is from $4,412,839 to $5,393,470 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPNU-0714(251) ,BUTLER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-7 from the junction of CR-15 in Garland to the north end of the Long Creek Bridge. Length 3.495 mi.

The Bracket Estimate on this project is from $344,335 to $420,854 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPOA-2017(250) ,COVINGTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Widening, Resurfacing, Guardrail, and Traffic Stripe on CR-57 from a point near the junction of SR-12 (US-84) east of Andalusia to the junction of CR-70. Length 1.882 mi.

The Bracket Estimate on this project is from $379,971 to $464,409 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPOA-3917(250) ,LAUDERDALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on CR-25 (Bridge Road) from the intersection of CR-66 (J. C. Mauldin Highway) in Killen to the junction of SR-64. Length 5.531 mi.

The Bracket Estimate on this project is from $442,179 to $540,441 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPOA-7457(601) ,CALHOUN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:10.00

for constructing the Grade, Drain, Base, and Pave on CR-192 (McIntosh Road) from the junction of CR-589 (CC Road) to the junction of Leon Smith Parkway southeast of Oxford. Length 0.530 mi.

The Bracket Estimate on this project is from $906,510 to $1,107,956 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


62.ST-037-999-017 ,JEFFERSON COUNTY

Contract Time: 55 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on Jefferson Avenue Southwest (Site 1); on 31st Street Southwest (Site 2); on Linbergh Street and Ishkooda Road (Site 3); on Barber Court/Montevallo Road Southwest (Site 4); and on Tuscaloosa Avenue (Site 5) at various locations as indicated in the plans. Length 3.474 mi.

The Bracket Estimate on this project is from $1,637,843 to $2,001,808 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.ST-049-888-014 ,MOBILE COUNTY

Contract Time: 30 Working Days

for constructing the Demolition and Structure Removal on CR-41 (Celeste Road) near the I-65 Interchange in Saraland.

The Bracket Estimate on this project is from $55,965 to $68,401 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)