August 25, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. ACOA61878F-ATRP(017), TUSCALOOSA 3. RPF-BRF-I065(416), CONECUH
6. ACAA59775-ATRP(009), MADISON 7. ACAA61025-ATRP(012), SHELBY
8. ACAA65001-ATRP(016), JEFFERSON 11. ACBR61701-ATRP(012), CLEBURNE
14. ACBRZ59427-ATRP(010), CALHOUN 15. ACBRZ59535-ATRP(004), ETC., PICKENS
18. ACNU60584-ATRP(003), ETC., LOWNDES 22. ACOA61872-ATRP(017), TUSCALOOSA
23. ACOA63306-ATRP(017), LIMESTONE 26. BR-5516(251), PIKE
29. CMAQ-NR13(933), JEFFERSON, ETC. 32. ERPR-8980(910), BALDWIN
35. HSIP-I059(404), ETC., DEKALB, ETC. 38. FRT-RP-IM-I020(350), TALLADEGA
41. STPOA-0041(518), ESCAMBIA 42. STPNU-0075(532), DEKALB
43. STPAA-0161(501), BALDWIN 44. STPAA-0205(508), MARSHALL
45. STPAA-0205(509), ETOWAH 51. STPNU-3417(250), HENRY, ETC.
52. STPOA-7457(601), CALHOUN 54. ST-002-182-016, BALDWIN
200. STPAA-NR13(960), CRENSHAW, ETC.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACOA61878F-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 225 Working Days

DBE Goal Percent:7.00

for constructing the Roadway Extension (Grade, Drainage, Pavement, and Bridge) on M-Class Boulevard from the junction of SR-7 (US-11) to the junction of Tingle Tangle Road to include an Overpass across SR-7 (US-11) and the Norfolk Southern Railroad in Vance. Length 0.693 mi.

The Bracket Estimate on this project is from $7,413,017 to $9,060,354 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $70.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.RPF-BRF-I065(416) ,CONECUH COUNTY

Contract Time: 400 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacements (Grade, Drain, Base, Pave, and Bridge) on I-65 over Murder Creek and Relief Bridges to include the Re-Alignment of the Interstate and Ramps near Evergreen. Length 1.603 mi.

The Bracket Estimate on this project is from $15,474,664 to $18,913,479 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $106.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACAA59775-ATRP(009) ,MADISON COUNTY

Contract Time: 260 Working Days

DBE Goal Percent:7.00

for constructing the Interchange (Grade, Drain, Base, Pave, Bridges, and Roadway Lighting) at Blake Bottom Road and SR-255 (Research Park Boulevard) in Huntsville. Length 0.605 mi.

The Bracket Estimate on this project is from $8,952,279 to $10,941,674 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $84.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACAA61025-ATRP(012) ,SHELBY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:10.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-28 from the junction of Arlington Street in Columbiana to the intersection of SR-145. Length 4.500 mi.

The Bracket Estimate on this project is from $1,436,727 to $1,755,999 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACAA65001-ATRP(016) ,JEFFERSON COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing (Partial Reconstruction), and Traffic Stripe on McAshan Drive from the junction of Rock Mountain Lake Road to the Bessemer City Limits. Length 0.689 mi.

The Bracket Estimate on this project is from $1,718,627 to $2,100,545 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Wednesday, August 16, 2017, at the East Central Region Conference Room, 100 Corporate Parkway, Suite 450, Hoover, AL 35242 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBR61701-ATRP(012) ,CLEBURNE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement and Approaches (Grade, Base, Pave, and Bridge) on CR-49 over Camp Creek. Length 0.075 mi.

The Bracket Estimate on this project is from $482,397 to $589,597 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBRZ59427-ATRP(010) ,CALHOUN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-631 (Brown Bridge Road) over Choccolocco Creek south of Rabbittown. Length 0.174 mi.

The Bracket Estimate on this project is from $1,086,843 to $1,328,363 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBRZ59535-ATRP(004), ACBRZ59536-ATRP(004), ACBRZ59537-ATRP(004) & ACBRZ60290-ATRP(008) ,PICKENS COUNTY

Contract Time: 225 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacements on Coleman Road (Sanders Street) over Hodge Branch in Carrollton (Site 1); on Washington Road over Snake Creek northeast of Pickensville (Site 2); on CR-34 (Bains Road) over Little Magby Creek northwest of Ethelsville (Site 3); and on Bonner Mill Road over Blubber Creek southwest of Carrollton (Site 4). Length 0.110 mi.

The Bracket Estimate on this project is from $917,756 to $1,121,701 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $26.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACNU60584-ATRP(003) & ACNU60586-ATRP(006) ,LOWNDES COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 from the junction of SR-185 in Fort Deposit to the junction of SR-21 (Site 1) and on CR-26 from the junction of CR-6 to the Montgomery County Line (Site 2). Length 12.384 mi.

The Bracket Estimate on this project is from $3,383,292 to $4,135,134 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.ACOA61872-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-95 (Old Greensboro Road) from the junction of H. B. Johnston Road to the junction of Maxwell Loop Road. Length 4.463 mi.

The Bracket Estimate on this project is from $752,017 to $919,132 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACOA63306-ATRP(017) ,LIMESTONE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Washington Street from the junction of SR-2 (US-72) to the junction of Hoffman Street in Athens. Length 3.415 mi.

The Bracket Estimate on this project is from $547,060 to $668,629 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.BR-5516(251) ,PIKE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-6618 over Buckhorn Creek. Length 0.084 mi.

The Bracket Estimate on this project is from $534,954 to $653,833 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.CMAQ-NR13(933) ,JEFFERSON AND SHELBY COUNTIES

Contract Time: 55 Working Days

for constructing the Traffic Signal System Upgrades on SR-3 (US-31), Lorna Road, SR-150, Grove Boulevard, Galleria Boulevard, Chapel Lane, Jim Wilson Jr. Parkway, and CR-17 (Valleydale Road) in Hoover.

The Bracket Estimate on this project is from $733,718 to $896,767 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.ERPR-8980(910) ,BALDWIN COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement and Approaches on CR-9 over Polecat Creek northeast of Clay City. Length 0.530 mi.

The Bracket Estimate on this project is from $2,679,382 to $3,274,801 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.HSIP-I059(404) & HSIP-I059(405) ,DEKALB AND ETOWAH COUNTIES

Contract Time: 120 Working Days

DBE Goal Percent:2.00

for constructing the Interstate Median Safety Guiderail and Guardrail Removal on I-59 from 1.000 mile south of the SR-211 Interchange in Reece City to the SR-117 Interchange in Hammondville. Length 44.398 mi.

The Bracket Estimate on this project is from $1,893,138 to $2,313,835 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.FRT-RP-IM-I020(350) ,TALLADEGA COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, Bridge Deck Overlay, and Traffic Stripe on I-20 from the Coosa River (MP 164.748) to a point near the beginning of the 3-Lane Section (MP 173.218). Length 8.732 mi.

The Bracket Estimate on this project is from $11,838,146 to $14,468,845 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $40.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.STPOA-0041(518) ,ESCAMBIA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-41 from the Burnt Corn Creek Bridge (MP 10.048) northwest of Brewton to a point near the junction of Log Cabin Lane (MP 13.344). Length 3.296 mi.

The Bracket Estimate on this project is from $575,936 to $703,922 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPNU-0075(532) ,DEKALB COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-75 from north of the junction of CR-76 (Barron Drive) to north of the junction of CR-50 (Campbell Street) in Fyffe. Length 0.920 mi.

The Bracket Estimate on this project is from $688,471 to $841,464 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.STPAA-0161(501) ,BALDWIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-161 from the junction of SR-182 to the junction of SR-180 in Orange Beach. Length 1.541 mi.

The Bracket Estimate on this project is from $620,060 to $757,851 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPAA-0205(508) ,MARSHALL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-205 from the intersection of Henderson Avenue West in Boaz to the junction of Guinivere Drive in Albertville. Length 2.010 mi.

The Bracket Estimate on this project is from $318,645 to $389,456 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.STPAA-0205(509) ,ETOWAH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-205 from the junction of SR-1 (US-431) to the Marshall County Line. Length 2.379 mi.

The Bracket Estimate on this project is from $450,552 to $496,103 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPNU-3417(250) ,HENRY AND HOUSTON COUNTIES

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-22 from the junction of SR-1 (US-431) in Headland to the Houston County Line. Length 4.053 mi.

The Bracket Estimate on this project is from $700,291 to $855,911 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPOA-7457(601) ,CALHOUN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:7.00

for constructing the Grade, Drain, Base, and Pave on CR-192 (McIntosh Road) from the junction of CR-589 (CC Road) to the junction of Leon Smith Parkway southeast of Oxford. Length 0.530 mi.

The Bracket Estimate on this project is from $799,276 to $976,893 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.ST-002-182-016 ,BALDWIN COUNTY

Contract Time: 105 Working Days

for constructing the Median Improvements and Beautification (Base, Pave, Widening, and Traffic Signals) on SR-182 from west of the junction of Romar Beach Access (MP 11.910) to a point near the junction of East Loop Road (MP 12.797) in Orange Beach. Length 0.887 mi.

The Bracket Estimate on this project is from $2,429,937 to $2,969,923 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $38.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(960) ,CRENSHAW AND PIKE COUNTIES

Contract Time: 50 Working Days

for constructing the Curb Ramp Installations and Modifications at various locations on SR-9, SR-10, SR-15, and SR-93 as indicated in the plans.

The Bracket Estimate on this project is from $198,080 to $242,097 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items