September 29, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. IMF-STPBHF-I459(316), JEFFERSON 4. RPF-IMF-NHF-I059(387), TUSCALOOSA
7. ACAA55554-ATRP(013), SHELBY 8. ACAA59508-ATRP(013), SHELBY
10. ACAA61024-ATRP(009), AUTAUGA, ETC. 14. ACBR58549-ATRP(006), ETC., CRENSHAW
15. ACBR60384-ATRP(010), PICKENS 16. ACBR61141-ATRP(012), ETC., LEE
20. ACBRZ59493-ATRP(012), JEFFERSON 21. ACBRZ59506-ATRP(013), SHELBY
25. ACNU61908-ATRP(016), GREENE 26. ACNU66421-ATRP(017), JACKSON
29. ACOA59677-ATRP(013), MORGAN 30. ACOA59695-ATRP(013), LAUDERDALE
32. ACOA65584-ATRP(008), WALKER 35. ERPR-9010(121), COFFEE
36. ERPR-9010(141), WINSTON 37. ERPR-9010(981), RUSSELL
40. IM-HSIP-I459(314), ETC., JEFFERSON 46. BP-STPAA-0003(521), BALDWIN
47. STPAA-0605(500), HOUSTON 48. STPAA-HSIP-0189(503), CRENSHAW
50. STPBH-UR14(605), JEFFERSON 53. STPNU-1416(250), CLAY
54. STPNU-6116(251), TALLADEGA * 60. 99-510-690-000-700, GREENE
200. STPAA-NR13(939), BALDWIN
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IMF-STPBHF-I459(316) ,JEFFERSON COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:5.00

for constructing the Interchange Improvements on I-459 at SR-38 (US-280) to include the Braided Exit Ramp from the I-459 Northbound Lane in Birmingham. Length 0.730 mi.

The Bracket Estimate on this project is from $2,744,938 to $3,354,924 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $49.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.RPF-IMF-NHF-I059(387) ,TUSCALOOSA COUNTY

Contract Time: 7/31/2020 Completion Date

DBE Goal Percent:7.00

for constructing the Additional Lanes and Bridge Replacement (Grading, Drainage, Base, Pavement, Bridges, Concrete Barrier Rail, Lighting, and Signals) on I-59 from 0.250 mile south of the SR-6 (US-82/McFarland Boulevard) Interchange to 0.750 mile south of the Buttermilk Road Interchange in Tuscaloosa. Length 4.165 mi.

The Bracket Estimate on this project is from $61,211,181 to $74,813,666 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $248.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Wednesday, September 20, 2017, at the West Central Region Training Facility, 2015 McFarland Boulevard East, Tuscaloosa, AL 35401 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACAA55554-ATRP(013) ,SHELBY COUNTY

Contract Time: 275 Working Days

DBE Goal Percent:8.00

for constructing the Interchange Improvements (Grading, Drainage, Base, Pavement, Bridge Replacement, Retaining Wall, Traffic Signals, and Traffic Stripe) on SR-3 (US-31) at I-65 (Exit 231) in Calera. Length 0.931 mi.

The Bracket Estimate on this project is from $17,055,122 to $20,845,149 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $122.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ACAA59508-ATRP(013) ,SHELBY COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:6.00

for constructing the Intersection Improvements (Grading, Drainage, Base, Pavement, and Traffic Stripe) on CR-52 at CR-13 in Helena. Length 0.184 mi.

The Bracket Estimate on this project is from $447,728 to $547,223 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACAA61024-ATRP(009) ,AUTAUGA AND ELMORE COUNTIES

Contract Time: 45 Working Days

for constructing the Traffic Signal System Upgrades on Cobbs Ford Road from the intersection of Silver Hills Drive to the I-65 Interchange (Northbound Lane Ramps) east of Prattville.

The Bracket Estimate on this project is from $421,093 to $514,670 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBR58549-ATRP(006) & ACBR58546-ATRP(006) ,CRENSHAW COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on CR-59 (Lapine Highway) over Dry Creek and Dry Creek Tributary northwest of Petry. Length 0.193 mi.

The Bracket Estimate on this project is from $1,218,583 to $1,340,937 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBR60384-ATRP(010) ,PICKENS COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement on CR-26 over Coal Fire Creek northeast of Pickensville. Length 0.213 mi.

The Bracket Estimate on this project is from $2,527,883 to $3,089,883 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBR61141-ATRP(012) & ACBRZ61137-ATRP(015) ,LEE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacements on CR-137 over a Tributary to Hodnett Creek south of Loachapoka (Site 1) and on CR-393 (Lee Road) over Hodnett Creek east of Notasulga (Site 2). Length 0.013 mi.

The Bracket Estimate on this project is from $431,677 to $527,606 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACBRZ59493-ATRP(012) ,JEFFERSON COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement on 23rd Street North in Bessemer. Length 0.021 mi.

The Bracket Estimate on this project is from $201,507 to $246,286 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACBRZ59506-ATRP(013) ,SHELBY COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches on CR-441 over Fourmile Creek northeast of Wilsonville. Length 0.205 mi.

The Bracket Estimate on this project is from $1,292,709 to $1,579,978 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU61908-ATRP(016) ,GREENE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment), Guardrail, and Traffic Stripe on CR-191 from the junction of SR-14 east of West Greene to the junction of CR-156. Length 17.659 mi.

The Bracket Estimate on this project is from $2,504,331 to $2,755,260 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACNU66421-ATRP(017) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on East 2nd Street from the junction of SR-117 (Kentucky Avenue) to Patsy Lee Drive in Stevenson. Length 1.016 mi.

The Bracket Estimate on this project is from $265,036 to $323,933 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ACOA59677-ATRP(013) ,MORGAN COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:10.00

for constructing the Additional Lanes on West Moulton Street from the intersection of Cockrell Avenue to a point near the existing 4-Lane Section in Decatur. Length 0.823 mi.

The Bracket Estimate on this project is from $2,114,156 to $2,326,068 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ACOA59695-ATRP(013) ,LAUDERDALE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, Reconstruction, and Traffic Stripe on College Street from the junction of West Mobile Street to the junction of Dr. Hicks Boulevard in Florence. Length 0.800 mi.

The Bracket Estimate on this project is from $596,964 to $729,623 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.ACOA65584-ATRP(008) ,WALKER COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing (Scrub Seal), Traffic Signals, and Traffic Stripe on Viking Drive from the intersection of 20th Avenue East to the junction of SR-5 (US-78) in Jasper. Length 0.753 mi.

The Bracket Estimate on this project is from $388,663 to $475,033 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.ERPR-9010(121) ,COFFEE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement and Approaches on CR-215 at Shoal Creek east of the junction of CR-217 south of Jack. Length 0.086 mi.

The Bracket Estimate on this project is from $282,746 to $345,578 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.ERPR-9010(141) ,WINSTON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Roadway Culvert Replacement (Grading, Drainage, Base, Pavement, and Traffic Stripe) on CR-12 over a Tributary to Lewis Smith Lake east of the junction of CR-207 southeast of Ardell. Length 0.085 mi.

The Bracket Estimate on this project is from $291,485 to $321,129 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.ERPR-9010(981) ,RUSSELL COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:2.00

for constructing the Slope Repair (Front Slope Failure) on SR-165 at MP 15.000 (Southbound Roadway) southwest of Holy Trinity.

The Bracket Estimate on this project is from $732,368 to $806,101 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.IM-HSIP-I459(314), HSIP-I020(353) & HSIP-I459(313) ,JEFFERSON COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:2.00

for constructing the Median Crossover Protection, Bridge Rail Retrofit, Guardrail, and Guardrail End Anchors on I-459 from the Alton Drive Underpass to the I-59 Interchange (Site 1); on I-459 from the Chapel Lane Overpass to the SR-38 (US-280) Interchange (Site 2); and on I-20 from 0.448 mile west of the Oporto-Madrid Boulevard Interchange to west of the SR-4 (US-78) Interchange (Site 3). Length 14.800 mi.

The Bracket Estimate on this project is from $1,457,312 to $1,781,159 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $26.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.BP-STPAA-0003(521) ,BALDWIN COUNTY

Contract Time: 360 Working Days

DBE Goal Percent:10.00

for constructing the Additional Lanes (Grading, Drainage, Base, Pavement, and Traffic Signals) on SR-3 (US-31) from a point west of the intersection of Westminster Drive and School Road in Spanish Fort to the junction of SR-181. Length 3.643 mi.

The Bracket Estimate on this project is from $17,122,432 to $20,927,417 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $144.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-0605(500) ,HOUSTON COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:8.00

for constructing the Intersection Improvements on SR-605 (Brannon Stand Road) at CR-40 (Fortner Street) in Dothan. Length 0.321 mi.

The Bracket Estimate on this project is from $1,510,575 to $1,662,128 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $33.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-HSIP-0189(503) ,CRENSHAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-189 from the Coffee County Line to the junction of SR-9 (US-331) southeast of Brantley. Length 4.341 mi.

The Bracket Estimate on this project is from $1,179,720 to $1,441,880 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPBH-UR14(605) ,JEFFERSON COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:10.00

for constructing the Roadway Improvements (Sidewalk Installation, Lighting, Landscaping, Drainage, and Retaining Walls) on CR-1498 (Ensley Avenue) from the intersection of SR-269 (20th Street) to the intersection of Warrior Road in Birmingham. Length 1.028 mi.

The Bracket Estimate on this project is from $1,837,981 to $2,246,422 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $39.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPNU-1416(250) ,CLAY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Blue Ridge Road from the junction of Clairmont Springs Road to the junction of Adams Gap Road. Length 1.150 mi.

The Bracket Estimate on this project is from $207,438 to $228,678 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPNU-6116(251) ,TALLADEGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-207 from the intersection of SR-34 to the junction of Hawthorne Hills Lane. Length 2.253 mi.

The Bracket Estimate on this project is from $286,219 to $349,824 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.99-510-690-000-700 ,GREENE COUNTY

Contract Time: 65 Working Days

for the Maintenance Bridge Painting on CR-55 over I-20/59 northeast of Knoxville and CR-56 over I-20/59 Southeast of Ralph

The Bracket Estimate on this project is from $411,218 to $452,836 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(939) ,BALDWIN COUNTY

Contract Time: 200 Working Days

for constructing the Curb Ramp Installations and Improvements at various locations on SR-3, SR-287, SR-16, SR-42, SR-59, SR-182, SR-161, and SR-104 as indicated in the plans.

The Bracket Estimate on this project is from $303,311 to $334,138 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)