037. STPNU-2531(200) , DEKALB

COUNTY: DEKALB
WORKING DAYS: 45

for constructing the Resurfacing and Traffic Stripe on CR-140 from CR-739 to I-59 in Sulphur Springs. Length 2.553 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $450,000 TO $550,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
405A000 3927 GAL Tack Coat
429A201 3283 TON Imp Bit Wrg Surf 3/4" ESAL A
429B201 4308 TON Imp Bit Bndr 1" ESAL A
429B209 150 TON Imp Bit Bndr Level 1" ESAL A
429C204 300 TON Imp Bit Base Lay Patch 1" ESAL A
430B040 1123 TON Agg Surf (Crushed Agg Base, Type B)
600A000 1 LS Mobilization
701A030 6 MILE Solid White Cl 2T Ty A Traf Stripe
701A235 6 MILE Solid Yellow Cl 2 Ty A Traf Str
701C001 6 MILE Solid Temporary Traffic Stripe
703A002 240 SQFT Traffic Control Marking, Class 2, Type A
705A037 340 EACH Pavement Markers, Class A-H, Type 2-D
740B000 305 SQFT Construction Signs
740E000 50 EACH Cones (36" High)
998A000 1 LS Construction Fuel (Max. Bid Limited to $ 24,500.00)