January 12, 2007 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form .THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . EBF-I085(320) , MONTGOMERY 002 . NHF-0008(541) , RUSSELL
003 . EBF-0012(519) , COVINGTON 004 . EBF-0012(520) , CHOCTAW
005 . EB-0042(507) , MOBILE 006 . NHF-0021(514) , CALHOUN
012 . BRF-0102(528) , MARION 014 . BR-0204(501) , MARENGO
017 . DESTP-AL48(001) , ESCAMBIA 021 . EB-STPSA-0050(501) , ELMORE
023 . STPSA-0003(531) , ESCAMBIA 024 . STPSA-0015(514) , MACON
025 . STPSA-0079(505) , MARSHALL 029 . EB-0035(506) , DEKALB
030 . EB-0074(513) , CULLMAN 034 . ACGBBRZ-BRZ-2800(207) , ETOWAH
037 . EB-0016(505) , BALDWIN 039 . STPTE-TE06(900) , MONTGOMERY
040 . STPNU-5711(200) , RUSSELL 041 . STPNU-0927(200) , CHAMBERS
043 . STPNU-1411(201) , CLAY 044 . STPNU-2014(200) , COVINGTON
046 . STPNU-3128(200) , GENEVA 047 . STPNU-4218(200) , LIMESTONE
048 . STPNU-4816(201) , MARSHALL 049 . STPNU-5803(201) , ST. CLAIR
050 . STPOA-7401(600) , CALHOUN 051 . STPOA-7457(600) , TALLADEGA
052 . STPNU-4924(200) , MOBILE 053 . STPSA-0001(529) , ETOWAH
056 . ST-552-19 , CULLMAN 057 . ST-066-021-001 , WILCOX
059 . 99-302-302-187-703 , FRANKLIN 060 . 99-302-391-101-701 , LAUDERDALE
061 . 99-302-402-101-702 , LAWRENCE 062 . 99-302-473-013-704 , MARION
063 . 99-302-673-195-705 , WINSTON 064 . 99-303-371-025-719 , JEFFERSON
065 . 99-303-371-079-706 , JEFFERSON 066 . 99-303-582-004-708 , ST. CLAIR
067 . 99-303-595-003-709 , SHELBY 068 . 99-303-595-025-704 , SHELBY
069 . 99-303-644-069-705 , WALKER 070 . 99-304-154-009-701 , CLEBURNE
071 . 99-304-413-001-701 , LEE 072 . 99-307-203-100-701 , COVINGTON
073 . 99-307-346-010-701 , HENRY 074 . 99-605-632-006-601 , TUSCALOOSA

001 . EBF-I085(320) MONTGOMERY COUNTY
WORKING DAYS: 100
MBE/DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $35.00

for constructing the Extension of the Southbound Outside Acceleration Lane on I-85 from Perry Hill Road to west of East Boulevard in Montgomery. Length 1.432 mi.

BRACKET ESTIMATE: $2,800,000 TO $3,500,000

VIEW ITEMS


002 . NHF-0008(541) RUSSELL COUNTY
WORKING DAYS: 300
MBE/DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $95.00

for constructing the Additional Lanes and Ramps including Bridge Widening on SR-8 (US-80) at the Riverchase Drive Extension in Phenix City. Length 1.155 mi.

BRACKET ESTIMATE: $8,375,000 TO $10,235,000

VIEW ITEMS


003 . EBF-0012(519) COVINGTON COUNTY

LENGTH: 5.38 MILES.

WORKING DAYS: 375
MBE/DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $92.00

for constructing the Additional Lanes (Pavement, Signing, Partial Grade and Drain) on SR-12 (US-84) from east of CR-67 at Sanford to CR-77 at Babbie. Length 5.376 mi.

BRACKET ESTIMATE: $10,800,000 TO $13,200,000

VIEW ITEMS


004 . EBF-0012(520) & 99-608-124-012-724 CHOCTAW COUNTY

LENGTH: 9.58 MILES.

WORKING DAYS: 55
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-12 (US-84) from west of SR-17 in Bolinger to east of CR-6. length 7.584 mi.

BRACKET ESTIMATE: $1,910,000 TO $2,330,000

VIEW ITEMS


005 . EB-0042(507) MOBILE COUNTY

LENGTH: 4.74 MILES.

WORKING DAYS: 60
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-42 (US-98) from Stimpson Lane to Broad Street in Mobile. Length 4.738 mi.

BRACKET ESTIMATE: $1,170,000 TO $1,400,000

VIEW ITEMS


006 . NHF-0021(514) CALHOUN COUNTY

LENGTH: 6.89 MILES.

WORKING DAYS: 75
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on SR-21 from north of SR-1 (US-431)(MP 258.300) to south of Jacksonville (MP 265.200). Length 6.890 mi.

BRACKET ESTIMATE: $2,220,000 TO $2,700,000

VIEW ITEMS


012 . BRF-0102(528) MARION COUNTY

LENGTH: 0.44 MILES.

WORKING DAYS: 140
MBE/DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $40.00

for constructing the Bridge Replacement and Approaches on SR-74 (US-278) at Ragsdale Creek in Hamilton. Length 0.443 mi.

BRACKET ESTIMATE: $2,800,000 TO $3,450,000

VIEW ITEMS


014 . BR-0204(501) MARENGO COUNTY

LENGTH: 0.28 MILES.

WORKING DAYS: 175
MBE/DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $16.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on SR-69 at Rocky Branch northeast of Providence. Length 0.281 mi.

BRACKET ESTIMATE: $1,460,000 TO $1,780,000

VIEW ITEMS


017 . IAR-027-000-004 & DESTP-AL48(001) ESCAMBIA COUNTY

LENGTH: 3.71 MILES.

WORKING DAYS: 170
MBE/DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $27.00

for constructing the Grade, Drainage and Pavement on the Industrial Park Access road in Atmore. Length 1.796 mi.

BRACKET ESTIMATE: $2,000,000 TO $2,500,000

VIEW ITEMS


021 . EB-STPSA-0050(501) & EB-STPSA-0229(502) ELMORE COUNTY
WORKING DAYS: 60
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-50 from near SR-229 to the Tallapoosa county line and on SR-229 from SR-14 to north of CR-173 south of Red Hill. Length 7.305 mi.

BRACKET ESTIMATE: $1,840,000 TO $2,130,000

VIEW ITEMS


023 . STPSA-0003(531) & 99-309-273-003-702 ESCAMBIA COUNTY

LENGTH: 18.58 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-3 (US-31) from Tiger (Stadium) Drive in Brewton to the beginning of the passing lane south of the Conecuh county line (MP 81.194). Length 9.294 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,830,000

VIEW ITEMS


024 . STPSA-0015(514) & 99-306-442-015-701 MACON COUNTY

LENGTH: 29.08 MILES.

WORKING DAYS: 100
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-15 (US-29) from north of the Macon county line to SR-8 (US-80) in Tuskegee. Length 14.536 mi.

BRACKET ESTIMATE: $2,490,000 TO $3,000,000

VIEW ITEMS


025 . STPSA-0079(505) & 99-301-484-079-708 MARSHALL COUNTY

LENGTH: 22.00 MILES.

WORKING DAYS: 55
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-79 from SR-1 (US-431) through Columbus City to the Jackson county line. Length 10.440 mi.

BRACKET ESTIMATE: $2,100,000 TO $2,600,000

VIEW ITEMS


029 . EB-0035(506) DEKALB COUNTY

LENGTH: 3.00 MILES.

WORKING DAYS: 35
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-35 from SR-7 (US-11) to MP 25.40 in Fort Payne. Length 2.360 mi.

BRACKET ESTIMATE: $880,000 TO $1,060,000

VIEW ITEMS


030 . EB-0074(513) CULLMAN COUNTY

LENGTH: 1.99 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-74 (US-278) from just east of CR-420 to I-65 in Cullman. Length 2.026 mi.

BRACKET ESTIMATE: $420,000 TO $510,000

VIEW ITEMS


034 . ACGBBRZ-BRZ-2800(207) ETOWAH COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 75
COST OF PLANS: $ 3.00

for constructing the Bridge Replacement (Bridge Culvert) on Pleasant Hill Road at Black Creek north of Gadsden. Length 0.017 mi.

BRACKET ESTIMATE: $540,000 TO $660,000

VIEW ITEMS


037 . EB-0016(505) BALDWIN COUNTY

LENGTH: 17.54 MILES.

WORKING DAYS: 85
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-16 (US-90) from Robertsdale to the Florida state line. Length 17.535 mi.

BRACKET ESTIMATE: $2,050,000 TO $2,500,000

VIEW ITEMS


039 . STPTE-TE06(900) MONTGOMERY COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Landscaping, Irrigation, Sidewalks and Lighting at the Alabama Governor's Mansion at 1142 South Perry Street in Montgomery.

BRACKET ESTIMATE: $79,000 TO $96,000

VIEW ITEMS


040 . STPNU-5711(200) RUSSELL COUNTY

LENGTH: 4.86 MILES.

WORKING DAYS: 90
COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on CR-28 (Sandfort Road) from SR-169 to Little Uchee Creek southwest of Phenix City. Length 4.856 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,300,000

VIEW ITEMS


041 . STPNU-0927(200) CHAMBERS COUNTY

LENGTH: 5.25 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-1266 from CR-1222 near Adams to CR-1278. Length 5.247 mi.

BRACKET ESTIMATE: $750,000 TO $900,000

VIEW ITEMS


043 . STPNU-1411(201) CLAY COUNTY

LENGTH: 5.11 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-30 from 4th Street East in Ashland to SR-49. Length 5.106 mi.

BRACKET ESTIMATE: $636,000 TO $777,000

VIEW ITEMS


044 . STPNU-2014(200) COVINGTON COUNTY

LENGTH: 7.18 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 4.00

for constructing the Resurfacing, Traffic Stripe, Guardrail and Culvert Extensions on CR-82 from SR-55 in Red Level to SR-15 (US-29) in Gant. Length 7.317 mi.

BRACKET ESTIMATE: $844,000 TO $1,030,000

VIEW ITEMS


046 . STPNU-3128(200) & STPNU-3140(200) GENEVA COUNTY

LENGTH: 2762.00 MILES.

WORKING DAYS: 40
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-19, CR-5 and CR-20 at various locations as indicated on the plans. Length 7.764 mi.

BRACKET ESTIMATE: $908,000 TO $1,110,000

VIEW ITEMS


047 . STPNU-4218(200) LIMESTONE COUNTY

LENGTH: 4.02 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on Elkton Road from Sandlin Road to SR-53 Southwest of Ardmore. Length 4.026 mi.

BRACKET ESTIMATE: $400,000 TO $500,000

VIEW ITEMS


048 . STPNU-4816(201) MARSHALL COUNTY

LENGTH: 2.80 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Cathedral Caverns Highway (CR-5) from Simpson Point Road through Grant to Dar School. Length 2.764 mi.

BRACKET ESTIMATE: $445,000 TO $550,000

VIEW ITEMS


049 . STPNU-5803(201) ST. CLAIR COUNTY

LENGTH: 4.91 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-27 from Cook Springs Cutoff Road to SR-4 (US-78) in Pell City. Length 4.930 mi.

BRACKET ESTIMATE: $698,000 TO $850,000

VIEW ITEMS


050 . STPOA-7401(600) & STPOA-7402(600) CALHOUN COUNTY

LENGTH: 1.86 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-105 (Barry Street) from the south city limit of Oxford to Spring Street in Oxford and on CR-103 (Caffey Drive) from SR-4 (US-78) to CR-48 (Airport Road) in Oxford. Length 1.853 mi.

BRACKET ESTIMATE: $315,000 TO $380,000

VIEW ITEMS


051 . STPOA-7457(600) TALLADEGA COUNTY

LENGTH: 5.21 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-135 from SR-21 to the Calhoun county line south of Oxford. Length 5.208 mi.

BRACKET ESTIMATE: $615,000 TO $750,000

VIEW ITEMS


052 . STPNU-4924(200) MOBILE COUNTY

LENGTH: 6.19 MILES.

WORKING DAYS: 175
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $28.00

for constructing the Grade, Drainage and Pavement on CR-13 and CR-11 (Grand Bay-Wilmer Road north and south) from CR-56 (Airport Blvd) at Tanner Williams to CR-70 (Tanner Williams Road). Length 6.156 mi.

BRACKET ESTIMATE: $2,106,000 TO $2,570,000

VIEW ITEMS


053 . STPSA-0001(529) & 99-301-285-001-705 ETOWAH COUNTY

LENGTH: 12.74 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from west of I-59 (MP 265.300) in Attalla to 0.2 miles south of CR-137 (Rockledge Drive). Length 6.370 mi.

BRACKET ESTIMATE: $1,600,000 TO $2,000,000

VIEW ITEMS


056 . ST-552-19 CULLMAN COUNTY

LENGTH: 3.99 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 5.00

for the Demolition and Removal of Structures along SR-74 (US-278) from west of the Duck River to the west city limit of Holly Pond.

BRACKET ESTIMATE: $115,000 TO $140,000

VIEW ITEMS


057 . ST-066-021-001 WILCOX COUNTY

LENGTH: 2.07 MILES.

WORKING DAYS: 160
COST OF PLANS: $38.00

for constructing the Culvert Extensions and Slope Improvements (Grade, Drainage, and Pavement) on SR-21 from Cedar Creek to the Lowndes county line east of Furman. Length 2.068 mi.

BRACKET ESTIMATE: $2,512,000 TO $3,070,000

VIEW ITEMS


059 . 99-302-302-187-703 FRANKLIN COUNTY
WORKING DAYS: 50
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-187 from the north end of the Little Bear Creek bridge to SR-24 in Belgreen. Length 5.650 mi.

BRACKET ESTIMATE: $1,410,000 TO $1,730,000

VIEW ITEMS


060 . 99-302-391-101-701 LAUDERDALE COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-101 from the north end of Wheeler Dam to SR-2 (US-72) in Elgin. Length 2.537 mi.

BRACKET ESTIMATE: $533,000 TO $651,000

VIEW ITEMS


061 . 99-302-402-101-702 LAWRENCE COUNTY

LENGTH: 5.97 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-101 from CR-218 to CR-131 south of Hatton. Length 5.970 mi.

BRACKET ESTIMATE: $1,140,000 TO $1,390,000

VIEW ITEMS


062 . 99-302-473-013-704 MARION COUNTY
WORKING DAYS: 40
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 from the Winston county line in Haleyville to the south end of the Bear Creek bridge. Length 4.671 mi.

BRACKET ESTIMATE: $1,097,000 TO $1,340,000

VIEW ITEMS


063 . 99-302-673-195-705 WINSTON COUNTY
WORKING DAYS: 40
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-195 from MP 18.000 at Mill Creek to SR-74 (US-278) in Double Springs. Length 6.398 mi.

BRACKET ESTIMATE: $1,300,000 TO $1,600,000

VIEW ITEMS


064 . 99-303-371-025-719 JEFFERSON COUNTY

LENGTH: 2.08 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-25 from the Shelby county line to SR-4 (US-78) in Leeds. Length 2.081 mi.

BRACKET ESTIMATE: $309,000 TO $377,000

VIEW ITEMS


065 . 99-303-371-079-706 JEFFERSON COUNTY

LENGTH: 5.37 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-79 from the end of the four lane in Pinson to the Blount county line. Length 5.455 mi.

BRACKET ESTIMATE: $824,000 TO $1,008,000

VIEW ITEMS


066 . 99-303-582-004-708 ST. CLAIR COUNTY

LENGTH: 5.20 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-4 (US-78) from 18th Street in Pell City to the Talladega county line. Length 5.372 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,300,000

VIEW ITEMS


067 . 99-303-595-003-709 SHELBY COUNTY

LENGTH: 2.30 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from Seventh Avenue in Calera to I-65. Length 2.255 mi.

BRACKET ESTIMATE: $625,000 TO $765,000

VIEW ITEMS


068 . 99-303-595-025-704 SHELBY COUNTY

LENGTH: 10.15 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for constructing the Resurfacing, Traffic Stripe and Guardrail on SR-25 from CR-55 at Sterrett to the Jefferson county line. Length 10.146 mi.

BRACKET ESTIMATE: $1,525,000 TO $1,860,000

VIEW ITEMS


069 . 99-303-644-069-705 WALKER COUNTY

LENGTH: 11.11 MILES.

WORKING DAYS: 75
COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-69 from Market Street in Oakman to Elliott Boulevard and 20th Street in Jasper. Length 11.106 mi.

BRACKET ESTIMATE: $2,000,000 TO $2,500,000

VIEW ITEMS


070 . 99-304-154-009-701 CLEBURNE COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 from I-20 to SR-4 (US-78) southwest of Heflin. Length 1.423 mi.

BRACKET ESTIMATE: $560,000 TO $700,000

VIEW ITEMS


071 . 99-304-413-001-701 LEE COUNTY

LENGTH: 2.02 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from south of the Opelika city limit (MP 135.148) to I-85. Length 2.021 mi.

BRACKET ESTIMATE: $774,000 TO $946,000

VIEW ITEMS


072 . 99-307-203-100-701 COVINGTON COUNTY

LENGTH: 1.56 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-100 from SR-15 to SR-12 (US-84) in Andalusia. Length 1.559 mi.

BRACKET ESTIMATE: $286,000 TO $350,000

VIEW ITEMS


073 . 99-307-346-010-701 HENRY COUNTY

LENGTH: 2.14 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 from SR-1 (US-431) to SR-95 in Abbeville. Length 2.144 mi.

BRACKET ESTIMATE: $468,000 TO $572,000

VIEW ITEMS


074 . 99-605-632-006-601 TUSCALOOSA COUNTY

LENGTH: 3.90 MILES.

WORKING DAYS: 200
COST OF PLANS: $17.00

for constructing the Traffic Signal Improvements on SR-6 (US-82) at various intersections between Mitt Lary Road and east of SR-69 in Northport.

BRACKET ESTIMATE: $830,000 TO $1,000,000

VIEW ITEMS