July 27, 2007 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form .THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I059(340) , ETOWAH 004 . IBRCPF-STPAAF-I5659306) , MADISON
007 . NHF-HSIPF-0001(532) , HENRY 008 . NHF-0013(542) , WASHINGTON
009 . NHF-0041(503) , DALLAS 015 . STPAA-HSIP-0079(507) , JACKSON
018 . STPAA-APL-DE-AL95(910) , MACON 020 . STPHV-4500(212) , MADISON, etc.
023 . STPOA-3005(200) , FRANKLIN 024 . STPOA-3319(200) , HALE
026 . STPOA-CN07(204) , DALLAS 027 . STPOA-9452(601) , HOUSTON
035 . ST-026-014-001 , ELMORE 036 . ST-069-000-017 , TALLADEGA, etc.
038 . 99-301-484-205-710 , MARSHALL 039 . 99-307-215-009-701 , CRENSHAW
040 . 99-608-660-010-736 , WILCOX

001 . IM-I059(340) ETOWAH COUNTY

LENGTH: 17.64 MILES.

SHALL BE COMPLETED BY: November 1, 2008
MBE/DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $14.00

for constructing the Concrete Pavement Rehabilitation on I-59 from Attalla (MP 180.716) to the Dekalb county line. Length 7.268 mi.

BRACKET ESTIMATE: $11,800,000 TO $14,400,000

VIEW ITEMS


004 . IBRCPF-STPAAF-I565(306) MADISON COUNTY

LENGTH: 0.50 MILES.

WORKING DAYS: 75
COST OF PLANS: $ 9.00

for constructing the Bridge Girder End Repair on I-565 at the SR-1 (US-231) interchange ramps in Huntsville. Length 0.500 mi.

BRACKET ESTIMATE: $150,000 TO $185,000

VIEW ITEMS


007 . NHF-HSIPF-0001(532) HENRY COUNTY

LENGTH: 5.68 MILES.

WORKING DAYS: 100
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from south of CR-42 to the north Abbeville city limits. Length 4.472 mi.

BRACKET ESTIMATE: $3,600,000 TO $4,400,000

VIEW ITEMS


008 . NHF-0013(542) WASHINGTON COUNTY

LENGTH: 5.63 MILES.

WORKING DAYS: 45
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from the north end of Bassetts Creek Bridge, north of Wagarville, to south of the Tombigbee River Bridge. Length 5.634 mi.

BRACKET ESTIMATE: $1,700,000 TO $2,000,000

VIEW ITEMS


009 . NHF-0041(503) DALLAS COUNTY

LENGTH: 4.45 MILES.

WORKING DAYS: 70
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-41 from SR-8 (US-80) to SR-14 in Selma. Length 4.452 mi.

BRACKET ESTIMATE: $2,265,000 TO $2,765,000

VIEW ITEMS


015 . STPAA-HSIP-0079(507) JACKSON COUNTY

LENGTH: 6.20 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-79 from the Marshall county line to south of SR-279 (MP 88.40) northwest of Langston. Length 6.200 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,800,000

VIEW ITEMS


018 . STPAA-APL-DE-AL95(910) MACON COUNTY
WORKING DAYS: 150
MBE/DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $21.00

for constructing the Bridge Replacement and Approaches on CR-54 (Main Street) at the CSXT Railroad in Notasulga. Length 0.065 mi.

BRACKET ESTIMATE: $1,980,000 TO $2,420,000

VIEW ITEMS


020 . STPHV-4500(212) MADISON & LIMESTONE COUNTIES

LENGTH: 1.17 MILES.

WORKING DAYS: 180
MBE/DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $46.00

for constructing the Grade, Drainage, Pavement and Signals on the Gillespie Road extension from County Line Road in Madison to Balch Road. Length 1.165 mi.

BRACKET ESTIMATE: $3,170,000 TO $3,875,000

VIEW ITEMS


023 . STPOA-3005(200) & STPOA-3019(203) FRANKLIN COUNTY

LENGTH: 6.85 MILES.

WORKING DAYS: 60
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-524 and CR-36 from CR-41 to SR-17 (US-43) south of Russellville. Length 6.896 mi.

BRACKET ESTIMATE: $850,000 TO $1,000,000

VIEW ITEMS


024 . STPOA-3319(200) HALE COUNTY

LENGTH: 4.88 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from SR-25 to CR-50 in the Oakmulgee Wildlife Management Area. Length 4.875 mi.

BRACKET ESTIMATE: $375,000 TO $460,000

VIEW ITEMS


026 . STPOA-CN07(204) DALLAS COUNTY

LENGTH: 4.64 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-16 from Summerdale Circle to SR-22 southeast of Summerfield and on CR-48 from the Selma city limits to SR-14. Length 4.642 mi.

BRACKET ESTIMATE: $616,000 TO $753,000

VIEW ITEMS


027 . STPOA-9452(601) HOUSTON COUNTY

LENGTH: 4.11 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Headland Avenue from the Ross Clark Circle in Dothan to SR-1 (US-431). Length 4.107 mi.

BRACKET ESTIMATE: $555,300 TO $678,000

VIEW ITEMS


035 . ST-026-014-001 ELMORE COUNTY

LENGTH: 0.63 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 7.00

for constructing the Intersection Improvements Including Signal Upgrade on SR-14 at SR-143 in Robinson Springs. Length 0.625 mi.

BRACKET ESTIMATE: $260,000 TO $320,000

VIEW ITEMS


036 . ST-069-000-017 TALLADEGA & CALHOUN COUNTIES
WORKING DAYS: 75
COST OF PLANS: $ 6.00

for constructing the Demolition and Removal of Structures on SR-21 at various locations between Sylacauga and Piedmont as indicated on the plans.

BRACKET ESTIMATE: $200,000 TO $240,000

VIEW ITEMS


038 . 99-301-484-205-710 MARSHALL COUNTY

LENGTH: 1.83 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-205 in Albertville from near Adams Drive (MP 6.800) to CR-378. Length 1.830 mi.

BRACKET ESTIMATE: $545,000 TO $670,000

VIEW ITEMS


039 . 99-307-215-009-701 CRENSHAW COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 (US-331) from Roy Beall Drive to East Sixth Street in Luverne. Length 1.596 mi.

BRACKET ESTIMATE: $450,000 TO $550,000

VIEW ITEMS


040 . 99-608-660-010-736 WILCOX COUNTY

LENGTH: 5.00 MILES.

WORKING DAYS: 120
COST OF PLANS: $ 7.00

for constructing the Guardrail Improvements on SR-10 from the Marengo county line (Sta. 566+07) through Pine Hill to Sta. 840+01.

BRACKET ESTIMATE: $355,500 TO $430,000

VIEW ITEMS



Return To: Top of this Page