November 02, 2007 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . ACBRF-0013(516) , WASHINGTON 002 . ACBRF-0013(518) , WASHINGTON
010 . NHF-0005(516) , JEFFERSON 011 . NH-0004(510) , MARION
012 . NHF-0286(022) , MADISON 020 . RECA-0006(528) , BULLOCK
021 . HSIP-0021(518) , MONROE 022 . HSIP-0047(501) , MONROE
023 . HRRR-CN08(202) , DEKALB 024 . HRRR-1600(221) , COFFEE
025 . STPAA-CN07(202) , ESCAMBIA 027 . STPAA-0010(513) , CHOCTAW
032 . STPOA-2W04(600) , ELMORE 035 . STPOA-0713(200) , BUTLER
036 . STPOA-1618(200) , COFFEE 037 . STPOA-2350(200) , DALE
038 . STPOA-3109(200) , GENEVA 039 . STPOA-4611(201) , MARENGO
041 . STPOA-6511(202) , WASHINGTON 043 . IAR-042-000-002 , LIMESTONE
045 . ST-003-001-002 , BARBOUR

001 . ACBRF-0013(516) WASHINGTON COUNTY

LENGTH: 0.91 MILES.

SHALL BE COMPLETED BY: June 1, 2009
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $40.00

for constructing the Bridge Replacement and Approaches on SR-13 (US-43) NBR at Bates Creek north of Malcolm. Length 0.908 mi.

BRACKET ESTIMATE: $4,200,000 TO $5,100,000

VIEW ITEMS


002 . ACBRF-0013(518) WASHINGTON COUNTY

LENGTH: 0.53 MILES.

SHALL BE COMPLETED BY: September 1, 2008
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $30.00

for constructing the Bridge Replacement and Approaches on SR-13 (US-43) (SBR) at Roberts Branch north of Sunflower. Length 0.530 mi.

BRACKET ESTIMATE: $1,580,000 TO $1,930,000

VIEW ITEMS


010 . NHF-0005(516) JEFFERSON COUNTY
WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, Guardrail and Traffic Stripe on SR-5 (US-78) from CR-105 (Cherry Avenue) to CR-88 (Heflin Avenue) in Birmingham. Length 2.488 mi.

BRACKET ESTIMATE: $1,700,000 TO $2,100,000

VIEW ITEMS


011 . NH-0004(510) MARION COUNTY
WORKING DAYS: 90
COST OF PLANS: $10.00

for constructing the Interchange Lighting on Corridor "X" at SR-129 north of Winfield.

BRACKET ESTIMATE: $670,000 TO $815,000

VIEW ITEMS


012 . NHF-0286(022) MADISON COUNTY
WORKING DAYS: 340
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $65.00

for constructing the Additional Lanes (Grade, Drainage, Pavement, Bridges, Lighting and Signing) on Memorial Parkway (US-231) from south of Weatherly Road to north of Whitesburg Drive in Huntsville. Length 1.841 km

BRACKET ESTIMATE: $13,500,000 TO $16,500,000

VIEW ITEMS


020 . RECA-0006(528) BULLOCK COUNTY

LENGTH: 6.17 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-6 (US-82) from near Bowlin Creek (MP 193.578) to CR-80 in Union Springs. Length 5.829 mi.

BRACKET ESTIMATE: $1,620,000 TO $1,980,000

VIEW ITEMS


021 . HSIP-0021(518) & 99-308-503-021-802 MONROE COUNTY

LENGTH: 11.90 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-21/SR-47 from south of Georgia Pacific (MP 46.400) to Tunnel Springs (MP 52.350). Length 5.950 mi.

BRACKET ESTIMATE: $1,620,000 TO $1,980,000

VIEW ITEMS


022 . HSIP-0047(501) & 99-308-503-047-804 MONROE COUNTY

LENGTH: 10.46 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-47 from north of SR-12 (US-84) to south of Mount Pleasant Avenue in Monroeville. Length 5.230 mi.

BRACKET ESTIMATE: $1,200,000 TO $1,400,000

VIEW ITEMS


023 . HRRR-CN08(202) DEKALB COUNTY

LENGTH: 71.21 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 3.00

for the Traffic Stripe on various county roads as indicated on the plans. Length 71.211 mi.

BRACKET ESTIMATE: $100,000 TO $120,000

VIEW ITEMS


024 . HRRR-1600(221) COFFEE COUNTY

LENGTH: 0.04 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Guardrail Replacement on CR-537 at Double Bridges Creek west of Enterprise. Length 0.053 mi.

BRACKET ESTIMATE: $27,800 TO $34,000

VIEW ITEMS


025 . STPAA-CN07(202) ESCAMBIA COUNTY

LENGTH: 2.12 MILES.

WORKING DAYS: 240
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $40.00

for constructing the Grade, Drainage, Pavement and Bridge on CR-31 from the Alabama Railroad Company in Flomaton to south of CR-35. Length 2.120 mi.

BRACKET ESTIMATE: $8,300,000 TO $10,100,000

VIEW ITEMS


027 . STPAA-0010(513) CHOCTAW COUNTY

LENGTH: 7.67 MILES.

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 from the Mississippi state line to west of CR-45 west of Lisman. Length 7.669 mi.

BRACKET ESTIMATE: $2,685,000 TO $3,250,000

VIEW ITEMS


032 . STPOA-2W04(600) ELMORE COUNTY

LENGTH: 0.90 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on Company Street from Green Street in Wetumpka to SR-9 (US-231). Length 0.900 mi.

BRACKET ESTIMATE: $180,000 TO $220,000

VIEW ITEMS


035 . STPOA-0713(200) BUTLER COUNTY

LENGTH: 8.79 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-54 and CR-46 from SR-10 to CR-7 at Forest Home. Length 8.787 mi.

BRACKET ESTIMATE: $1,050,000 TO $1,290,000

VIEW ITEMS


036 . STPOA-1618(200) COFFEE COUNTY

LENGTH: 2.74 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-239 from CR-249 northeast of Elba to CR-248. Length 2.742 mi.

BRACKET ESTIMATE: $385,000 TO $470,000

VIEW ITEMS


037 . STPOA-2350(200) DALE COUNTY

LENGTH: 4.60 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-24 from SR-92 to SR-85 in Daleville. Length 4.594 mi.

BRACKET ESTIMATE: $650,000 TO $793,000

VIEW ITEMS


038 . STPOA-3109(200) GENEVA COUNTY

LENGTH: 4.11 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-10 from the Florida state line to SR-153 southwest of Samson. Length 4.107 mi.

BRACKET ESTIMATE: $575,000 TO $700,000

VIEW ITEMS


039 . STPOA-4611(201) MARENGO COUNTY
WORKING DAYS: 35
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-19 from SR-28 to CR-21 northwest of Providence. Length 8.299 mi.

BRACKET ESTIMATE: $920,000 TO $1,100,000

VIEW ITEMS


041 . STPOA-6511(202) WASHINGTON COUNTY
WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-4 from CR-35 at Sims Chapel to SR-13 (US-43) at Calvert. Length 10.469 mi.

BRACKET ESTIMATE: $1,195,000 TO $1,460,000

VIEW ITEMS


043 . IAR-042-000-002 LIMESTONE COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 180
COST OF PLANS: $34.00

for constructing the Widening (Grade, Drainage, Pavement, Bridge and Signals) on SR-99 (Elm Street) from west of CR-278 (Elkton Road) to SR-3 (US-31) in Athens. Length 0.699 mi.

BRACKET ESTIMATE: $2,190,000 TO $2,680,000

VIEW ITEMS


045 . ST-003-001-002 BARBOUR COUNTY
WORKING DAYS: 40
COST OF PLANS: $ 7.00

for constructing the Drainage Extension on US-431 north of Hunter's Inlet Road in Eufaula.

BRACKET ESTIMATE: $106,000 TO $130,000

VIEW ITEMS