Alabama Department of Transportation
Proposal Letting List
September 28, 2007 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form .THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-ACNHF-I020(332) , TALLADEGA 002 . IM-I085(325) , CHAMBERS, etc.
010 . EBF-0004(512) , MARION 016 . HSIP-0012(527) , HOUSTON
017 . HSIP-0091(503) , CULLMAN 022 . EB-0149(500) , JEFFERSON
027 . STPOA-4308(200) , LOWNDES 028 . STPOA-4828(201) , MARSHALL
029 . STPOA-9412(600) , HOUSTON 035 . ST-049-039-001 , MOBILE
036 . ST-062-000-002 , TALLAPOOSA, etc. 038 . 99-307-162-012-701 , COFFEE

001 . IM-ACNHF-I020(332) TALLADEGA COUNTY
SHALL BE COMPLETED BY: November 20, 2009
MBE/DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $75.00

for constructing the Additional Lanes (Grade, Drainage, Pavement and Bridges) on I-20 from west of the Coldwater interchange (MP 178.34) to MP 182.09 near Oxford. Length 3.655 mi.

BRACKET ESTIMATE: $28,000,000 TO $34,000,000

VIEW ITEMS


002 . IM-I085(325) CHAMBERS & LEE COUNTIES
SHALL BE COMPLETED BY: August 22, 2008
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on I-85 at various locations as indicated on the plans. Length 14.330 mi.

BRACKET ESTIMATE: $11,000,000 TO $13,500,000

VIEW ITEMS


010 . EBF-0004(512) MARION COUNTY

LENGTH: 4.00 MILES.

WORKING DAYS: 75
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-4 (US-78) from MP 10.0 to the Buttahatchee River at the Marion city limit. Length 3.996 mi.

BRACKET ESTIMATE: $3,600,000 TO $4,400,000

VIEW ITEMS


016 . HSIP-0012(527) HOUSTON COUNTY

LENGTH: 0.19 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing (Superelevation and Cross Slope Correction) on SR-12 (US-84) at CR-65 west of Ashford. Length 0.187 mi.

BRACKET ESTIMATE: $244,000 TO $299,000

VIEW ITEMS


017 . HSIP-0091(503) CULLMAN COUNTY

LENGTH: 2.20 MILES.

WORKING DAYS: 40
COST OF PLANS: $14.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-91 from CR-377 to near CR-384 south of Hanceville. Length 2.481 mi.

BRACKET ESTIMATE: $690,000 TO $840,000

VIEW ITEMS


022 . EB-0149(500) JEFFERSON COUNTY

LENGTH: 1.80 MILES.

WORKING DAYS: 45
MBE/DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-149 (University Boulevard) in Birmingham from south of 8th Street to 27th Street South. Length 1.800 mi.

BRACKET ESTIMATE: $694,000 TO $848,000

VIEW ITEMS


027 . STPOA-4308(200) LOWNDES COUNTY

LENGTH: 8.32 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-17 from CR-12 to SR-8 (US-80) at White Hall. Length 8.323 mi.

BRACKET ESTIMATE: $850,000 TO $1,000,000

VIEW ITEMS


028 . STPOA-4828(201) MARSHALL COUNTY

LENGTH: 1.55 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-162 (Pleasant Grove Road) from Nixon Chapel Road to Section Line Road west of Albertville. Length 1.553 mi.

BRACKET ESTIMATE: $315,000 TO $386,000

VIEW ITEMS


029 . STPOA-9412(600) HOUSTON COUNTY

LENGTH: 3.77 KILOMETERS.

WORKING DAYS: 340
MBE/DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $72.00

for constructing the Additional Lanes (Grade, Drainage, Pavement, Signing and Signals) on Westgate Parkway from SR-53 (US-231) to Harrison Road (CR-10) in Dothan. Length 3.770 km

BRACKET ESTIMATE: $6,930,000 TO $8,450,000

VIEW ITEMS


035 . ST-049-039-001 MOBILE COUNTY

LENGTH: 1.72 MILES.

WORKING DAYS: 300
COST OF PLANS: $49.00

for constructing the Relocation (Grade, Drainage, Pavement, Signal and Bridges) of CR-39 from Half Mile Road to SR-16 (US-90) at Irvington. Length 1.715 mi.

BRACKET ESTIMATE: $11,150,000 TO $13,600,000

VIEW ITEMS


036 . ST-062-000-002 TALLAPOOSA & CHAMBERS COUNTIES
CALENDAR DAYS: 45
COST OF PLANS: $ 6.00

for the Pond Remediation at various ponds on Cobb Property adjacent to SR-38 (US-280) northwest of Waverly.

BRACKET ESTIMATE: $244,000 TO $271,000

VIEW ITEMS


038 . 99-307-162-012-701 COFFEE COUNTY

LENGTH: 4.12 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 8.00

for constructing the Resurfacing and Traffic Stripe on SR-12 (US-84) from SR-141 to SR-166 in Elba. Length 4.101 mi.

BRACKET ESTIMATE: $617,000 TO $754,000

VIEW ITEMS