| COUNTY:COFFEE | WORKING DAYS: 60 |
for the Structure Removal and Underground Storage Tank Removal on SR-12 (US-84) at various sites as indicated on the plans.
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $240,000 TO $300,000
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 204A000 | 17 | EACH | Closing Water Well | |
| 205A001 | 1 | EACH | Removal Of Structures, Structure No. 6 | |
| 205A002 | 1 | EACH | Removal Of Structures, Structure No. 8 | |
| 205A003 | 1 | EACH | Removal Of Structures, Structure No. 10 | |
| 205A004 | 1 | EACH | Removal Of Structures, Structure No. 12 | |
| 205A005 | 1 | EACH | Removal Of Structures, Structure No. 11 | |
| 205A006 | 1 | EACH | Removal Of Structures, Structure No. 21 | |
| 205A007 | 1 | EACH | Removal Of Structures, Structure No. 21A | |
| 205A008 | 1 | EACH | Removal Of Structures, Structure No. 20 | |
| 205A009 | 1 | EACH | Removal Of Structures, Structure No. 31 | |
| 205A010 | 1 | EACH | Removal Of Structures, Structure No. 32 | |
| 205A011 | 1 | EACH | Removal Of Structures, Structure No. 32A | |
| 205A012 | 1 | EACH | Removal Of Structures, Structure No. 55 | |
| 205A013 | 1 | EACH | Removal Of Structures, Structure No. 3 | |
| 205A014 | 1 | EACH | Removal Of Structures, Structure No. 5 | |
| 205A015 | 1 | EACH | Removal Of Structures, Structure No. 9 | |
| 205A016 | 1 | EACH | Removal Of Structures, Structure No. 9A | |
| 205A017 | 1 | EACH | Removal Of Structures, Structure No. 12 | |
| 205A018 | 1 | EACH | Removal Of Structures, Structure No. 14 | |
| 205A019 | 1 | EACH | Removal Of Structures, Structure No. 14A | |
| 205A020 | 1 | EACH | Removal Of Structures, Structure No. 18 | |
| 205A021 | 1 | EACH | Removal Of Structures, Structure No. 21 | |
| 205A022 | 1 | EACH | Removal Of Structures, Structure No. 21A | |
| 205A023 | 1 | EACH | Removal Of Structures, Structure No. 27 | |
| 205A024 | 1 | EACH | Removal Of Structures, Structure No. 27A | |
| 205A025 | 1 | EACH | Removal Of Structures, Structure No. 37 | |
| 205A026 | 1 | EACH | Removal Of Structures, Structure No. 42 | |
| 205A027 | 1 | EACH | Removal Of Structures, Structure No. 45 | |
| 205A028 | 1 | EACH | Removal Of Structures, Structure No. 45A | |
| 250B002 | 50 | CUYD | Dispos Hydrocarbon Cont Soil (Spec Item) | |
| 250C000 | 3 | EACH | UST Removal (Specialty Item) | |
| 250N001 | 5000 | GAL | Rem And Dis Tank Contents (Sludge) | |
| 600A000 | 1 | LS | Mobilization | |
| 665J002 | 3500 | LF | Silt Fence | |
| 665O001 | 3500 | LF | Silt Fence Removal | |
| 665Q002 | 1000 | LF | Wattle | |
| 680A000 | 1 | LS | Engineering Controls | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 12,500.00) |