Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
002 . EBF-0012(510) COFFEE COUNTY
| LENGTH: 5.20 MILES. | WORKING DAYS: 285 |
| DBE CONTRACT OBLIGATION: 10 % | COST OF PLANS: $75.00 |
for constructing the Additional Lanes (Grade, Drainage, Bridge and UST Romoval) on SR-12 (US-84) from SR-141 to CR-364 in Elba. Length 5.582 mi.
BRACKET ESTIMATE: $9,635,000 TO $11,770,000
VIEW ITEMS005 . NHF-0053(534) PIKE COUNTY
| WORKING DAYS: 40 | |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 8.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from just south of SR-93 to the west city limits of Brundidge. Length 2.645 mi.
BRACKET ESTIMATE: $1,600,000 TO $2,000,000
007 . ACAPD-0355(501) FRANKLIN COUNTY
| WORKING DAYS: 420 | |
| DBE CONTRACT OBLIGATION: 10 % | COST OF PLANS: $97.00 |
for constructing the Additional Lanes (Grade, Drainage, Partial Base and Pave and Bridge) on SR-24 (Corridor "V") from SR-247 east of Red Bay to CR-21. Length 7.859 mi.
BRACKET ESTIMATE: $12,260,000 TO $14,950,000
VIEW ITEMS012 . BR-5202(200) MORGAN COUNTY
| LENGTH: 0.17 MILES. | WORKING DAYS: 75 |
| COST OF PLANS: $ 5.00 |
for constructing the Bridge Replacements (2-Bridge Culverts) and Approaches on CR-55 at Herrin Creek southwest of Hartselle. Length 0.169 mi.
BRACKET ESTIMATE: $322,000 TO $394,000
VIEW ITEMS014 . BRZ-3500(217) ,BRZ-3500(218) & BRZ-3500(219) HOUSTON COUNTY
| LENGTH: 0.04 MILES. | WORKING DAYS: 110 |
| COST OF PLANS: $10.00 |
for constructing the Bridge Replacements (2-Precast & 1-Culvert) on various county roads at sites as indicated on the plans. Length 0.034 mi.
BRACKET ESTIMATE: $1,150,000 TO $1,400,000
VIEW ITEMS017 . HSIP-0008(547) MACON COUNTY
| WORKING DAYS: 30 |
| COST OF PLANS: $ 2.00 |
for constructing the Resurfacing and Traffic Stripe on SR-8 (US-80) from MP 180.00 to MP 180.30 east of CR-63 northeast of Tuskegee.
BRACKET ESTIMATE: $105,000 TO $128,000
VIEW ITEMS021 . NH-0004(514) MARION COUNTY
| WORKING DAYS: 90 |
| COST OF PLANS: $ 8.00 |
for constructing the Partial Interchange Lighting on SR-4 (Corridor "X") at CR-35 in Hamilton. Length 0.795 mi.
BRACKET ESTIMATE: $394,000 TO $480,000
VIEW ITEMS026 . EB-HSIP-0229(505) ELMORE COUNTY
| LENGTH: 6.14 MILES. | WORKING DAYS: 45 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-229 from north of CR- 173 through Red Hill to SR-63. Length 6.140 mi.
BRACKET ESTIMATE: $1,100,000 TO $1,300,000
VIEW ITEMS032 . STPOA-CN08(264) MONTGOMERY COUNTY
| LENGTH: 9.33 MILES. | WORKING DAYS: 45 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 7.00 |
for constructing the Resurfacing and Traffic Stripe on various county roads at sites as indicated on the plans. Length 9.592 mi.
BRACKET ESTIMATE: $1,000,000 TO $1,300,000
VIEW ITEMS033 . STPOA-CN08(266) AUTAUGA COUNTY
| LENGTH: 9.38 MILES. | WORKING DAYS: 60 |
| COST OF PLANS: $ 2.00 |
for constructing the Resurfacing and Traffic Stripe on CR-59 from the Prattville city limits to CR-40 and on CR-59 from CR-40 to CR-59 Spur. Length 9.439 mi.
BRACKET ESTIMATE: $777,000 TO $950,000
VIEW ITEMS035 . STPOA-8101(600) ETOWAH COUNTY
| LENGTH: 2.79 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 3.00 |
for constructing the Resurfacing and Traffic Stripe on CR-446 (Rocky Ford Road) from Centre Road at Hokes Bluff to Reeves Road. Length 2.789 mi.
BRACKET ESTIMATE: $575,000 TO $700,000
VIEW ITEMS036 . STPOA-9650(600) TUSCALOOSA COUNTY
| LENGTH: 2.30 MILES. | WORKING DAYS: 300 |
| DBE CONTRACT OBLIGATION: 10 % | COST OF PLANS: $65.00 |
for constructing the Additional Lanes (Grade, Drainage and Pavement) on CR-85 (Buttermilk Road) from the Tuscaloosa city limits to 0.3 miles north of I-59/20. Length 2.272 mi.
BRACKET ESTIMATE: $9,390,000 TO $11,550,000
VIEW ITEMS039 . 99-309-022-016-805 MOBILE & BALDWIN COUNTIES
| LENGTH: 8.35 MILES. | WORKING DAYS: 120 |
| COST OF PLANS: $18.00 |
for constructing the Resurfacing, Median Modifications and Turn Lane Addition on SR-16 (US-90) from south of the Cochrane Africatown USA Bridge in Mobile to the west end of Blakely River Bridge. Length 8.350 mi.
BRACKET ESTIMATE: $5,300,000 TO $6,500,000
VIEW ITEMS041 . 99-609-491-213-760 MOBILE COUNTY
| LENGTH: 0.28 MILES. | WORKING DAYS: 90 |
| COST OF PLANS: $21.00 |
for constructing the Turn Lanes (Grade, Drainage and Pavement) on SR-213 at Second Avenue and at Cleveland Road in Saraland. Length 0.213 mi.
BRACKET ESTIMATE: $498,000 TO $600,000
VIEW ITEMSReturn To: Top of this Page