Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
001 . HPP-NHF-EBF-A109(901) CALHOUN COUNTY
| LENGTH: 2.76 MILES. | WORKING DAYS: 250 |
| DBE CONTRACT OBLIGATION: 10 % | COST OF PLANS: $34.00 |
for constructing the Base, Pavement and Partial Grade and Drain on the Anniston East Bypass from 700' north of Choccolocco Road to 1500' south of Lake Yahou. Length 2.756 mi.
BRACKET ESTIMATE: $11,400,000 TO $14,000,000
VIEW ITEMS004 . NHF-0074(519) CULLMAN COUNTY
| LENGTH: 6.00 MILES. | WORKING DAYS: 35 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-74 (US-278) from MP 69.417 at Spring Hill to MP 75.327. Length 4.580 mi.
BRACKET ESTIMATE: $1,255,000 TO $1,530,000
VIEW ITEMS006 . HSIPF-I065(389)BUTLER COUNTY
| LENGTH: 15.53 MILES. | WORKING DAYS: 120 |
| COST OF PLANS: $ 3.00 |
for constructing the Cable Guiderail Median Protection on I-65 from the Conecuh county line to one mile north of CR-28. Length 15.609 mi.
BRACKET ESTIMATE: $1,785,000 TO $2,100,000
VIEW ITEMS007 . HSIPF-I085(329)MACON COUNTY
| LENGTH: 10.85 MILES. | WORKING DAYS: 90 |
| COST OF PLANS: $ 3.00 |
for constructing the Cable Guiderail Median Protection on I-85 from CR-36 to 0.5 mile west of the Lee county line. Length 11.169 mi.
BRACKET ESTIMATE: $1,605,000 TO $1,960,000
VIEW ITEMS009 . BR-4553(200)MADISON COUNTY
| LENGTH: 0.09 MILES. | WORKING DAYS: 60 |
| COST OF PLANS: $ 6.00 |
for constructing the Bridge Replacement (Bridge Culvert) and Approaches on Cave Springs Road at Baker Springs Branch in Owens Cross Roads. Length 0.094 mi.
BRACKET ESTIMATE: $460,000 TO $560,000
VIEW ITEMS010 . BRZ-0200(213)BALDWIN COUNTY
| LENGTH: 0.15 MILES. | WORKING DAYS: 70 |
| COST OF PLANS: $ 7.00 |
for constructing the Bridge Replacement on CR-62 at Mill Creek northeast on Robertsdale. Length 0.015 mi.
BRACKET ESTIMATE: $360,000 TO $440,000
VIEW ITEMS013 . HRRR-CN09(206) MORGAN COUNTY
| LENGTH: 4.25 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 3.00 |
for constructing the Traffic Stripe, Pavement Markers and Guardrail on CR-1087 and CR-1004 at sites near Decatur as indicated on the plans. Length 4.249 mi.
BRACKET ESTIMATE: $72,000 TO $88,000
VIEW ITEMS014 . HRRR-1512(200) CLEBURNE COUNTY
| LENGTH: 2.02 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 3.00 |
for constructing the Widening, Traffic Stripe, Signing and Flashing Beacons on CR-24 from the Calhoun county line to SR-281 southwest of Heflin. Length 2.016 mi.
BRACKET ESTIMATE: $55,800 TO $68,000
VIEW ITEMS015 . HRRR-4129(200) LEE COUNTY
| LENGTH: 1.52 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 3.00 |
for constructing the Guardrail, Traffic Stripe, Pavement Markers and Signing on CR-010 from CR-022 at the Auburn city limit to CR-023. Length 1.539 mi.
BRACKET ESTIMATE: $48,600 TO $59,400
017 . HSIP-0007(518) ,99-301-253-007-902 & 99-301-253-068-901 DEKALB COUNTY
| LENGTH: 29.73 MILES. | WORKING DAYS: 90 |
| COST OF PLANS: $ 6.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-7 (US-11) from the Etowah county line to the north city limit of Collinsville and on SR-68 from the west city limit of Collinsville to the Cherokee county line. Length 11.260 mi.
BRACKET ESTIMATE: $2,665,000 TO $3,255,000
VIEW ITEMS018 . HSIP-0025(517) HALE COUNTY
| LENGTH: 11.14 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 4.00 |
for constructing the Safety Improvements on SR-25 from 1.160 miles north of CR-16 to 0.700 miles south of Picks Creek south of Greensboro. Length 0.800 mi.
BRACKET ESTIMATE: $481,000 TO $585,000
VIEW ITEMS019 . HSIP-0089(501) & 99-306-245-089-801 DALLAS COUNTY
| LENGTH: 17.36 MILES. | WORKING DAYS: 75 |
| COST OF PLANS: $ 3.00 |
for constructing the Resurfacing, Traffic Stripe and Drainage Extensions on SR-89 from the Wilcox county line through Carlowville to SR-41. Length 8.680 mi.
BRACKET ESTIMATE: $2,000,000 TO $2,400,000
VIEW ITEMS022 . STPAA-0009(529)CHEROKEE COUNTY
| LENGTH: 7.20 MILES. | WORKING DAYS: 45 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Resurfacing and Traffic Stripe on SR-9 from the Calhoun county line to the Ellis Bridge south of Coloma. Length 7.196 mi.
BRACKET ESTIMATE: $1,900,000 TO $2,300,000
VIEW ITEMS023 . STPAA-0010(518)CHOCTAW & MARENGO COUNTIES
| LENGTH: 11.14 MILES. | WORKING DAYS: 45 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 from 0.413 miles east of SR-17 in Butler to the east end of the Tombigbee River bridge. Length 11.142 mi.
BRACKET ESTIMATE: $1,900,000 TO $2,285,000
VIEW ITEMS024 . STPAA-0177(500)CLARKE COUNTY
| LENGTH: 2.78 MILES. | WORKING DAYS: 30 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-177 from Algiers Street to SR-13 (US-43) in Jackson. Length 2.779 mi.
BRACKET ESTIMATE: $600,000 TO $732,000
VIEW ITEMS025 . STPAA-0180(502)BALDWIN COUNTY
| LENGTH: 20.17 MILES. | WORKING DAYS: 90 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-180 from Fort Morgan State Historical Site to West 2nd Street in Gulf Shores. Length 20.173 mi.
BRACKET ESTIMATE: $3,300,000 TO $4,000,000
VIEW ITEMS026 . STPAA-0227(500)MARSHALL COUNTY
| LENGTH: 1.91 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 5.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-227 from Signal Point Road to Gunter Avenue in Guntersville. Length 1.906 mi.
BRACKET ESTIMATE: $1,200,000 TO $1,400,000
VIEW ITEMS028 . STPAA-HSIP-0006(534)BULLOCK COUNTY
| LENGTH: 12.14 MILES. | WORKING DAYS: 100 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-6 (US-82) from SR-51 through Midway to the Barbour county line. Length 12.139 mi.
BRACKET ESTIMATE: $3,330,000 TO $4,000,000
VIEW ITEMS029 . STPAA-HSIP-0008(551)MACON COUNTY
| LENGTH: 3.68 MILES. | WORKING DAYS: 30 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing Resurfacing and Traffic Stripe on SR-8 (US-80) (Westbound Only) from the beginning of the divided 4-lane (MP 167.420) to the end of the divided 4-lane (MP 171.100) in Tuskegee. Length 3.680 mi.
BRACKET ESTIMATE: $925,000 TO $1,130,000
VIEW ITEMS030 . STPAA-HSIP-0163(501) MOBILE COUNTY
| LENGTH: 4.68 MILES. | WORKING DAYS: 70 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-163 from Perch Creek to McVay Drive in Mobile. Length 4.836 mi.
BRACKET ESTIMATE: $1,400,000 TO $1,700,000
VIEW ITEMS032 . STPNU-1815(200)CONECUH COUNTY
| LENGTH: 3.37 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 2.00 |
for constructing the Resurfacing and Traffic Stripe on CR-106 from CR-79 to CR-29 at Mixonville. Length 3.369 mi.
BRACKET ESTIMATE: $470,000 TO $570,000
VIEW ITEMS033 . STPNU-4912(200) MOBILE COUNTY
| LENGTH: 9.97 MILES. | WORKING DAYS: 90 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $17.00 |
for constructing the Resurfacing, Traffic Stripe and Drainage Improvements on CR-41 (Celeste Road) from CR-84 (Salco Road West) to the Citronelle city limit. Length 9.973 mi.
BRACKET ESTIMATE: $3,045,000 TO $3,720,000
VIEW ITEMS035 . STPOA-0621(200)BULLOCK COUNTY
| LENGTH: 7.60 MILES. | WORKING DAYS: 90 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing the Full Depth Reclamation (Cement) on CR-23 from SR-15 (US-29) north of Union Springs to the Macon county line. Length 7.612 mi.
BRACKET ESTIMATE: $1,200,000 TO $1,500,000
VIEW ITEMS040 . 99-308-503-041-904 MONROE COUNTY
| LENGTH: 9.10 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 3.00 |
for constructing the Resurfacing and Traffic Stripe on SR-41 from 0.040 miles south of CR-17 (MP 65.000) to the north end of the railroad overpass bridge near Franklin. Length 9.098 mi.
BRACKET ESTIMATE: $1,100,000 TO $1,400,000
VIEW ITEMS041 . 99-407-351-095-502 HOUSTON COUNTY
| LENGTH: 0.26 MILES. | WORKING DAYS: 130 |
| COST OF PLANS: $20.00 |
for constructing the Drainage Improvements at various sites on SR-95 between US-84 and SR-52 south of Columbia.
BRACKET ESTIMATE: $875,000 TO $1,070,000
VIEW ITEMS042 . 99-706-062-110-801 BULLOCK COUNTY
| WORKING DAYS: 30 | COST OF PLANS: $ 3.00 |
for constructing the Safety Improvements on SR-110 south of Mitchell Station.
BRACKET ESTIMATE: $310,000 TO $380,000
VIEW ITEMS043 . 99-509-022-182-950 BALDWIN COUNTY
| CALENDAR DAYS: 365 | COST OF PLANS: $ 2.00 |
for the Maintenance Dredging at Little Lagoon Pass in Gulf Shores.
BRACKET ESTIMATE: $485,000 TO $590,000
VIEW ITEMSReturn To: Top of this Page