February 29, 2008 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I010(322) , BALDWIN 004 . NHF-HSIPF-0001(535) , HOUSTON, etc.
005 . NHF-0004(513) , MARION 006 . NHF-0013(548) , MOBILE
007 . NHF-HSIPF-0053(528) , DALE, etc. 008 . NHF-HSIPF-0074(516) , WINSTON
010 . ACBRF-0101(562) , CONECUH 014 . BHPF-0012(524) , MONROE
016 . STPOA-0025(514) , ETOWAH 020 . BR-0129(501) , MARION
021 . BR-0025(509) , SHELBY 024 . EB-0016(507) , MOBILE
025 . HRRR-CN08(205) , COLBERT 026 . HRRR-CN08(224) , CHEROKEE
027 . HRRR-CN08(227) , PICKENS 028 . HRRR-CN08(228) , CHAMBERS
029 . HRRR-CN08(229) , TALLADEGA 030 . HRRR-CN08(230) , BUTLER
031 . HRRR-CN08(231) , FRANKLIN 032 . HRRR-CN08(234) , COOSA
033 . HRRR-CN08(236) , HOUSTON 034 . HRRR-CN08(240) , RUSSELL
035 . HRRR-3623(200) , JACKSON 036 . HRRR-1600(221) , COFFEE
038 . HSIP-0134(502) , DALE 040 . HRRR-CN08(239) , GREENE
041 . NH-0002(527) , LAUDERDALE 042 . NH-0009(523) , COVINGTON
043 . NH-0013(547) , MARENGO, etc. 047 . STPAA-0052(507) , HOUSTON, etc.
048 . STPAA-0069(515) , CULLMAN 049 . STPAA-0167(502) , COFFEE
050 . STPAA-0186(500) , MACON 054 . STPBH-7136(600) , SHELBY
055 . STPNU-CN08(225) , RANDOLPH 056 . STPNU-0516(200) , BLOUNT
059 . STPNU-HRRR-5310(201) , PERRY 060 . ACTCSP-08AL(001) , HOUSTON
062 . STPOA-7407(600) , CALHOUN 063 . STPSA-0051(501) , COFFEE
064 . STPSA-0141(501) , COFFEE 067 . ST-049-016-006 , MOBILE
068 . 99-302-171-257-803 , COLBERT 069 . 99-303-052-079-816 , BLOUNT
070 . 99-303-052-160-806 , BLOUNT 071 . 99-303-582-004-822 , ST. CLAIR
072 . 99-303-644-195-810 , WALKER 073 . 99-304-191-009-801 , COOSA
074 . 99-402-692-000-802 , FRANKLIN, etc. 075 . 99-402-693-000-803 , WINSTON, etc.
076 . 99-406-001-000-803 , AUTAUGA, etc. 077 . 99-409-273-041-732 , ESCAMBIA

001 . IM-I010(322)BALDWIN COUNTY

LENGTH: 3.55 MILES. WORKING DAYS: 60
COST OF PLANS: $ 6.00

for constructing the Tensioned Cable Guiderail on I-10 from SR-42 (US-98) to SR-181 at Malbis. Length 3.548 mi.

BRACKET ESTIMATE: $535,000 TO $650,000

VIEW ITEMS

004 . NHF-HSIPF-0001(535)HOUSTON & HENRY COUNTIES

LENGTH: 5.90 MILES. WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $14.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from Speigner Street in Dothan to just north of the Headland south city limit. Length 5.934 mi.

BRACKET ESTIMATE: $2,665,000 TO $3,255,000

VIEW ITEMS

005 . NHF-0004(513)MARION COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-4 (Corridor X) from MP 6.000 to MP 10.000 just west of Hamilton. Length 4.033 mi.

BRACKET ESTIMATE: $3,780,000 TO $4,625,000

VIEW ITEMS

006 . NHF-0013(548)MOBILE COUNTY

LENGTH: 2.00 MILES. SHALL BE COMPLETED BY: September 30, 2009
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $132

for constructing the Interchange (Grade, Drainage, Pavement, Lighting, Signing and Bridges) on SR-13 (US-43) at Dow Badische Road south of Calvert. Length 0.697 mi.

BRACKET ESTIMATE: $19,100,000 TO $23,400,000

VIEW ITEMS

007 . NHF-HSIPF-0053(528)DALE & HOUSTON COUNTIES

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from just south of Troy University Drive to south of CR-63 in Pinckard. Length 4.576 mi.

BRACKET ESTIMATE: $3,160,000 TO $3,860,000

VIEW ITEMS

008 . NHF-HSIPF-0074(516)WINSTON COUNTY

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-74(US-278) from Brushy Creek (MP 51.783) to CR-41 in Addison. Length 5.033 mi.

BRACKET ESTIMATE: $1,130,000 TO $1,380,000

VIEW ITEMS

010 . ACBRF-0101(562)CONECUH COUNTY

LENGTH: 0.55 MILES. WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $33.00

for constructing the Bridge Replacement and Approaches on US-84 over the Alabama Railroad in Repton. Length 0.553 mi.

BRACKET ESTIMATE: $3,900,000 TO $4,700,000

VIEW ITEMS

014 . BHPF-0012(524)MONROE COUNTY

LENGTH: 0.42 MILES. WORKING DAYS: 110
COST OF PLANS: $31.00

for the Bridge Coating on SR-12 (US-84) at the Alabama River in Claiborne. Length 0.419 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,300,000

VIEW ITEMS

016 . STPOA-0025(514)ETOWAH COUNTY

WORKING DAYS: 385
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $147

for constructing the Relocation (Grade, Drainage and Partial Base and Pave) of SR-25 (US-411) from the existing four lane in Gadsden to Turkeytown. Length 7.751 mi.

BRACKET ESTIMATE: $17,000,000 TO $20,500,000

VIEW ITEMS

020 . BR-0129(501)MARION COUNTY

WORKING DAYS: 105
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $13.00

for constructing the Bridge Replacement and Approaches on the SR-129 Connector at the Buttahatchee River at Whitehouse. Length 0.151 mi.

BRACKET ESTIMATE: $1,244,000 TO $1,520,000

VIEW ITEMS

021 . BR-0025(509)SHELBY COUNTY

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $37.00

for constructing the Bridge Replacement and Approaches on SR-25 at the Southern Railroad south of Wilton. Length 0.766 mi.

BRACKET ESTIMATE: $2,915,000 TO $3,560,000

VIEW ITEMS

024 . EB-0016(507)MOBILE COUNTY

LENGTH: 1.01 MILES. WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-16 (US-90) from west of I-165 to the east end of the Railroad Bridge and from the Connector Loop to Telegraph Road (SR-13) (US-43) southeast of Prichard. Length 1.014 mi.

BRACKET ESTIMATE: $570,000 TO $700,000

VIEW ITEMS

025 . HRRR-CN08(205)COLBERT COUNTY

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe, Markings, Legends and Pavement Markers on various county roads as indicated on the plans. Length 32.485 mi.

BRACKET ESTIMATE: $74,000 TO $91,000

VIEW ITEMS

026 . HRRR-CN08(224)CHEROKEE COUNTY

WORKING DAYS: 30 COST OF PLANS: $ 3.00

for constructing the Traffic Stripe and Guardrail on various county roads as indicated on the plans. Length 19.985 mi.

BRACKET ESTIMATE: $41,400 TO $50,600

VIEW ITEMS

027 . HRRR-CN08(227)PICKENS COUNTY

LENGTH: 19.85 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe on various county roads as indicated on the plans. Length 19.854 mi.

BRACKET ESTIMATE: $40,000 TO $49,000

VIEW ITEMS

028 . HRRR-CN08(228)CHAMBERS COUNTY

LENGTH: 33.26 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe on various county roads at sites as indicated on the plans. Length 33.262 mi.

BRACKET ESTIMATE: $81,600 TO $98,000

VIEW ITEMS

029 . HRRR-CN08(229)TALLADEGA COUNTY

LENGTH: 11.20 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for the Traffic Stripe, Pavement Markers and Signing on CR-207 and CR-203 at sites as indicated on the plans. Length 32.949 mi.

BRACKET ESTIMATE: $108,000 TO $130,000

VIEW ITEMS

030 . HRRR-CN08(230)BUTLER COUNTY

LENGTH: 34.07 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe and Traffic Control Markings on various county roads at sites as indicated on the plans. Length 34.215 mi.

BRACKET ESTIMATE: $81,000 TO $98,000

VIEW ITEMS

031 . HRRR-CN08(231)FRANKLIN COUNTY

LENGTH: 25.61 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for the Traffic Stripe and Pavement Markers on various county roads as indicated on the plans. Length 25.612 mi.

BRACKET ESTIMATE: $65,700 TO $80,000

VIEW ITEMS

032 . HRRR-CN08(234)COOSA COUNTY

LENGTH: 57.50 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe on various county roads as indicated by the plans. Length 57.500 mi.

BRACKET ESTIMATE: $54,000 TO $66,000

VIEW ITEMS

033 . HRRR-CN08(236)HOUSTON COUNTY

WORKING DAYS: 30 COST OF PLANS: $ 3.00

for constructing the Guardrail and Guardrail End Anchors at various sites as indicated on the plans. Length 0.193 mi.

BRACKET ESTIMATE: $55,800 TO $68,000

VIEW ITEMS

034 . HRRR-CN08(240)RUSSELL COUNTY

LENGTH: 18.46 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe, Markings and Pavement Markers on various county roads as indicated on the plans. Length 18.460 mi.

BRACKET ESTIMATE: $93,200 TO $114,000

VIEW ITEMS

035 . HRRR-3623(200)JACKSON COUNTY

LENGTH: 9.33 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe, Markings, Legends and Pavement Markers on CR-17 from SR-35 at Larkinville to SR-79. Length 9.333 mi.

BRACKET ESTIMATE: $103,500 TO $126,500

VIEW ITEMS

036 . HRRR-1600(221)COFFEE COUNTY

LENGTH: 0.04 MILES. WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Guardrail Replacement on CR-537 at Double Bridges Creek west of Enterprise. Length 0.053 mi.

BRACKET ESTIMATE: $27,800 TO $34,000

VIEW ITEMS

038 . HSIP-0134(502) & 99-307-234-134-801 DALE COUNTY

LENGTH: 13.66 MILES. WORKING DAYS: 50
COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-134 from SR-85 in Daleville to SR-123 in Newton. Length 6.833 mi.

BRACKET ESTIMATE: $1,700,000 TO $2,000,000

VIEW ITEMS

040 . HRRR-CN08(239) GREENE COUNTY

LENGTH: 15.77 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for the Traffic Stripe, Markings, Pavement Markers and Signing on CR-191 and CR-20 at sites as indicated on the plans. Length 15.769 mi.

BRACKET ESTIMATE: $109,000 TO $130,000

VIEW ITEMS

041 . NH-0002(527) LAUDERDALE COUNTY

WORKING DAYS: 30 COST OF PLANS: $ 3.00

for constructing the Widening (Turn Lane), Planing, Resurfacing and Traffic Stripe on SR-2 (US-72) from east of CR-504 (Wheeler-Hills Road) to east of SR-207 in Rogersville. Length 1.027 mi.

BRACKET ESTIMATE: $500,000 TO $600,000

VIEW ITEMS

042 . NH-0009(523) COVINGTON COUNTY

LENGTH: 2.38 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 (US-331) from east of College Street in Opp to SR-299 (Opp Bypass). Length 2.383 mi.

BRACKET ESTIMATE: $850,000 TO $1,000,000

VIEW ITEMS

043 . NH-0013(547) & ST-046-008-002 MARENGO & GREENE COUNTIES

LENGTH: 4.28 MILES. WORKING DAYS: 80
COST OF PLANS: $18.00

for constructing the Planing, Intersection Improvements, Resurfacing and Traffic Stripe on SR-13 (US-43) from SR-8 (US-80) to the north end of the Black Warrior River Bridge and on SR-8 (US-80) in Demopolis at Walnut St., hospital entrance, SR-13 (US-43), Bailey Rd. and Floyd St. Length 3.284 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,300,000

VIEW ITEMS

047 . STPAA-0052(507) HOUSTON & GENEVA COUNTIES

LENGTH: 3.66 MILES. WORKING DAYS: 30
COST OF PLANS: $ 8.00

for the Removal of Structures and UST Removal along SR-52 from CR-59 (Brannon Stand Road) in Taylor to CR-300 (Scott Road) in Malvern.

BRACKET ESTIMATE: $115,000 TO $140,000

VIEW ITEMS

048 . STPAA-0069(515)CULLMAN COUNTY

LENGTH: 9.00 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-69 from SR-74 (US-278) to the Fairview city limits. Length 8.450 mi.

BRACKET ESTIMATE: $1,600,000 TO $2,000,000

VIEW ITEMS

049 . STPAA-0167(502) COFFEE COUNTY

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-167 from CR-153 to the Pike county line. Length 12.360 mi.

BRACKET ESTIMATE: $1,665,000 TO $2,000,000

VIEW ITEMS

050 . STPAA-0186(500) MACON COUNTY

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-186 from I-85 to the existing four lane southwest of Alliance. Length 3.839 mi.

BRACKET ESTIMATE: $1,365,000 TO $1,665,000

VIEW ITEMS

054 . STPBH-7136(600)SHELBY COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $35.00

for constructing the Widening (Grade, Drainage and Pavement) on SR-119 (Cahaba Valley Road) at four sites from CR-379 to Double Oak Lane in Indian Springs Village.

BRACKET ESTIMATE: $2,450,000 TO $2,950,000

VIEW ITEMS

055 . STPNU-CN08(225)RANDOLPH COUNTY

LENGTH: 11.68 MILES. WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-73 from SR-22 to CR-26 just west of Roanoke and on CR-26 from CR-15 to the Roanoke city limit. Length 11.676 mi.

BRACKET ESTIMATE: $1,045,000 TO $1,275,000

VIEW ITEMS

056 . STPNU-0516(200)BLOUNT COUNTY

LENGTH: 4.16 MILES. WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $47.00

for constructing the Resurfacing, Traffic Stripe and Drainage on CR-25 from SR-53 (US-231) in Summit to the Marshall county line. Length 4.160 mi.

BRACKET ESTIMATE: $1,900,000 TO $2,300,000

VIEW ITEMS

059.STPNU-HRRR-5310(201)PERRY COUNTY

LENGTH: 9.50 MILES. WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-29 from Burger Curb Road northwest of Marion to the Hale County line. Length 9.499 mi.

BRACKET ESTIMATE: $1,045,000 TO $1,275,000

VIEW ITEMS

060 . ACTCSP-08AL(001) & ST-035-888-006 HOUSTON COUNTY

LENGTH: 0.42 MILES. CALENDAR DAYS: 90
COST OF PLANS: $ 8.00

for constructing the Bridge Replacement on CR-59 at Beaver Creek in Dothan. Length 0.038 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,300,000

VIEW ITEMS

062 . STPOA-7407(600) & STPOA-7418(600) CALHOUN COUNTY

WORKING DAYS: 125 COST OF PLANS: $14.00

for constructing the Widening, Resurfacing and Traffic Stripe at various sites on Greenbriar Dear Road and Wilmer Avenue in Anniston as indicated on the plans. Length 0.324 mi.

BRACKET ESTIMATE: $714,000 TO $873,000

VIEW ITEMS

063 . STPSA-0051(501) & 99-307-162-051-801 COFFEE COUNTY

WORKING DAYS: 50 COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on SR-51 from SR-12 (US-84) in Enterprise to SR-167. Length 5.762 mi.

BRACKET ESTIMATE: $1,200,000 TO $1,450,000

VIEW ITEMS

064. STPSA-0141(501), STPSA-0166(500), 99-307-162-141-802 & 99-307-162-166-803 COFFEE COUNTY

LENGTH: 3.54 MILES. WORKING DAYS: 50
COST OF PLANS: $17.00

for constructing the Resurfacing and Traffic Stripe on various state routes as indicated on the plans. Length 7.169 mi.

BRACKET ESTIMATE: $1,600,000 TO $1,900,000

VIEW ITEMS

067 . ST-049-016-006 MOBILE COUNTY

LENGTH: 0.24 MILES. WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Drainage Improvements on SR-16 (US-90)at MP 16.4 in Theodore.

BRACKET ESTIMATE: $300,000 TO $370,000

VIEW ITEMS

068 . 99-302-171-247-803 COLBERT COUNTY

LENGTH: 4.02 MILES. WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-247 from north of CR-58 (MP 15.000) to CR-144 (Posey Loop Road) at Fawn Lake. Length 4.023 mi.

BRACKET ESTIMATE: $885,000 TO $1,080,000

VIEW ITEMS

069 . 99-303-052-079-816 BLOUNT COUNTY

WORKING DAYS: 45 COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, Guardrail and Traffic Stripe on SR-79 from the Jefferson county line to Pine Bluff Road in Locust Fork. Length 8.445 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,800,000

VIEW ITEMS

070 . 99-303-052-160-806 BLOUNT COUNTY

WORKING DAYS: 45 COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, Guardrail and Traffic Stripe on SR-160 from east of CR-119 (Atwood Drive)in Hayden to Branham Road in Nectar. Length 9.070 mi.

BRACKET ESTIMATE: $1,400,000 TO $1,700,000

VIEW ITEMS

071 . 99-303-582-004-822 ST. CLAIR COUNTY

WORKING DAYS: 40 COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-4 (US-78) from the Jefferson county line to just west of CR-511 (Golden Chase Drive) at Cooks Springs. Length 7.067 mi.

BRACKET ESTIMATE: $830,000 TO $1,010,000

VIEW ITEMS

072 . 99-303-644-195-810 WALKER COUNTY

WORKING DAYS: 45 COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on SR-195 from north of CR-27 (Fall City Road) to the Winston county line. Length 5.798 mi.

BRACKET ESTIMATE: $859,000 TO $1,050,000

VIEW ITEMS

073 . 99-304-191-009-801 COOSA COUNTY

LENGTH: 8.03 MILES. WORKING DAYS: 55
COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 from the Elmore county line to SR-22. Length 8.034 mi.

BRACKET ESTIMATE: $1,550,000 TO $1,850,000

VIEW ITEMS

074 . 99-402-692-000-802 FRANKLIN & LAWRENCE COUNTIES

WORKING DAYS: 105 COST OF PLANS: $ 3.00

for the Maintenance Roadside Mowing on various state routes at sites as indicated on the plans.

BRACKET ESTIMATE: $286,000 TO $350,000

VIEW ITEMS

075 . 99-402-693-000-803 WINSTON & MARION COUNTIES

WORKING DAYS: 105 COST OF PLANS: $ 3.00

for the Maintenance Roadside Mowing along various state routes as indicated by the plans.

BRACKET ESTIMATE: $302,000 TO $370,000

VIEW ITEMS

076 . 99-406-001-000-803 , 99-406-002-000-8 , 99-406-004-000-801 & 99-406-005-000-802 AUTAUGA , ELMORE , MACON , BUTLER , LOWNDES , MONTGOMERY & DALLAS COUNTIES

WORKING DAYS: 114 COST OF PLANS: $17.00

for the Maintenance Roadside Mowing on various sites as indicated on the plans.

BRACKET ESTIMATE: $390,000 TO $475,000

VIEW ITEMS

077 . 99-409-273-041-732 ESCAMBIA COUNTY

WORKING DAYS: 30 COST OF PLANS: $ 6.00

for constructing the Drainage Improvements on SR-41 in Brewton.

BRACKET ESTIMATE: $130,000 TO $150,000

VIEW ITEMS