Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.
If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
001 . IM-I065(381)
BALDWIN COUNTY
LENGTH: 0.91 MILES.
WORKING DAYS: 60
COST OF PLANS: $27.00
for constructing the Interchange Improvements (Additional Lane-Ramp D) on I-65 NBR at SR-287 (Exit 37) north of Bay Minette. Length 0.909 mi.
BRACKET ESTIMATE: $872,000 TO $1,060,000
003 . ACHPP-NCPD-STPOAF-I065(332)
LIMESTONE COUNTY
WORKING DAYS: 210
DBE CONTRACT OBLIGATION: 10 %
COST OF PLANS: $81.00
for constructing the Interchange (Grade, Drainage, Pavement, Signing and Bridge Raising) on I-65 at CR-24 east of Tanner. Length 1.254 mi.
BRACKET ESTIMATE: $6,300,000 TO $7,700,000
006 . NHF-0077(503)
CALHOUN COUNTY
WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 2.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-77 from the Talladega county line to the Etowah county line. Length 12.082 mi.
BRACKET ESTIMATE: $2,610,000 TO $3,150,000
008 . NHF-0079(509)
BLOUNT COUNTY
WORKING DAYS: 45
COST OF PLANS: $ 4.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-79 from Pine Bluff Road in Locust Fork to Blackwood Bend Road in Cleveland. Length 8.760 mi.
BRACKET ESTIMATE: $1,248,000 TO $1,520,000
009 . STPOAF-1602(521)
DEKALB COUNTY
WORKING DAYS: 465
DBE CONTRACT OBLIGATION: 10 %
COST OF PLANS: $141
for constructing the Interchange (Grade, Drainage, Pavement and Bridges) on the relocated 49th Street at I-59 in Fort Payne. Length 1.452 mi.
BRACKET ESTIMATE: $18,900,000 TO $23,100,000
014 . CMAQ-CN08(908)
JEFFERSON COUNTY
LENGTH: 4.75 MILES.
WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $18.00
for constructing the Fiber Optic and Traffic Signal Improvements on SR-149 from Valley Avenue to Cahaba Road in Birmingham at various intersections as indicated on the plans. Length 4.753 mi.
BRACKET ESTIMATE: $1,100,000 TO $1,400,000
016 . HRRR-CN08(209)
WINSTON COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for the Traffic Stripe on various county roads at sites as indicated on the plans. Length 26.980 mi.
BRACKET ESTIMATE: $50,000 TO $60,000
017 . HRRR-6200(210)
TALLAPOOSA COUNTY
LENGTH: 7.71 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for the Traffic Stripe, Traffic Control Markings and Pavement Markers on CR-44 and CR-92 at sites as indicated on the plans. Length 7.708 mi.
BRACKET ESTIMATE: $43,000 TO $53,000
018 . HRRR-CN08(232)
WASHINGTON COUNTY
LENGTH: 16.81 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for the Traffic Stripe and Traffic Control Markings on CR-15, CR-34 and CR-36 at sites as indicated on the plans. Length 16.813 mi.
BRACKET ESTIMATE: $82,800 TO $100,700
019 . HRRR-CN08(233)
CULLMAN COUNTY
LENGTH: 16.10 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 3.00
for the Traffic Stripe and Traffic Control Markings on CR-747, CR-1223, CR-1114 and CR-565 at sites as indicated on the plans. Length 16.100 mi.
BRACKET ESTIMATE: $34,000 TO $42,000
020 . STPNU-HRRR-CN08 (238)
BIBB COUNTY
LENGTH: 13.88 MILES.
WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 3.00
for constructing the Resurfacing and Traffic Stripe on CR-9 from SR-5 in Centreville to CR-24 at Belcher. Length 13.875 mi.
BRACKET ESTIMATE: $2,275,000 TO $2,780,000
021 . HRRR-CN08(245)
ST. CLAIR COUNTY
LENGTH: 0.13 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 4.00
for constructing the Guardrail and Guardrail End Anchors at various locations as indicated on the plans. Length 0.136 mi.
BRACKET ESTIMATE: $24,000 TO $29,000
022 . HRRR-CN08(246)
CLEBURNE COUNTY
LENGTH: 26.28 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 3.00
for the Traffic Stripe, Traffic Control Markings and Pavement Markers on various county roads at sites as indicated on the plans. Length 26.281 mi.
BRACKET ESTIMATE: $120,000 TO $145,000
023 . HRRR-CN08(247)
CLAY COUNTY
LENGTH: 33.60 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 3.00
for the Traffic Stripe and Pavement Markers on various county roads at sites as indicated on the plans. Length 38.010 mi.
BRACKET ESTIMATE: $85,000 TO $100,000
024 . HRRR-CN08(248)
RANDOLPH COUNTY
LENGTH: 0.32 MILES.
WORKING DAYS: 45
COST OF PLANS: $ 3.00
for constructing the Guardrail and Guardrail End Anchors on various county roads at sites as indicated on the plans. Length 0.315 mi.
BRACKET ESTIMATE: $58,400 TO $71,300
025 . HRRR-CN08(249)
CLARKE COUNTY
LENGTH: 39.80 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 3.00
for the Traffic Stripe and Traffic Control Markings on various county roads at sites as indicated on the plans. Length 39.800 mi.
BRACKET ESTIMATE: $139,000 TO $169,000
026 . HRRR-CN08(250)
BULLOCK COUNTY
LENGTH: 14.01 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for constructing the Traffic Stripe, Pavement Markers and Traffic Control Markings on various county roads at sites as indicated by the plans. Length 14.014 mi.
BRACKET ESTIMATE: $55,000 TO $68,000
027 . HRRR-CN08(251)
CHOCTAW COUNTY
LENGTH: 8.70 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for the Traffic Stripe and Traffic Control Markings on various county roads at sites as indicated on the plans. Length 8.660 mi.
BRACKET ESTIMATE: $46,000 TO $56,000
028 . HRRR-CN08(252)
MACON COUNTY
LENGTH: 81.78 MILES.
WORKING DAYS: 40
COST OF PLANS: $ 2.00
for the Traffic Stripe on various county roads at sites as indicated by the plans. Length 81.782 mi.
BRACKET ESTIMATE: $57,000 TO $70,000
029 . HRRR-CN08(253)
MONROE COUNTY
LENGTH: 76.00 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for the Traffic Stripe on various county roads at sites as indicated on the plans. Length 76.050 mi.
BRACKET ESTIMATE: $68,000 TO $83,000
031 . HRRR-CN08(255)
ST. CLAIR COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for constructing the Traffic Stripe and Traffic Control Markings on various county roads at sites as indicated by the plans. Length 6.723 mi.
BRACKET ESTIMATE: $30,000 TO $33,000
032 . HRRR-CN08(256)
LEE COUNTY
LENGTH: 0.17 MILES.
WORKING DAYS: 60
COST OF PLANS: $ 6.00
for constructing the Guardrail, Traffic Control Markings and Signs on various county roads at sites as indicated on the plans. Length 0.224 mi.
BRACKET ESTIMATE: $106,000 TO $130,000
033 . HRRR-CN08(257)
LOWNDES COUNTY
LENGTH: 77.80 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 3.00
for the Traffic Stripe on various county roads at sites as indicated on the plans. Length 82.390 mi.
BRACKET ESTIMATE: $59,000 TO $70,000
034 . HRRR-CN08(258)
MARION COUNTY
LENGTH: 41.07 MILES.
WORKING DAYS: 45
COST OF PLANS: $ 3.00
for the Traffic Stripe and Traffic Control Markings and Legends on various county roads at sites as indicated on the plans. Length 41.073 mi.
BRACKET ESTIMATE: $77,000 TO $94,000
036 . HSIP-0008(545) & 99-306-513-008-801
MONTGOMERY COUNTY
LENGTH: 7.82 MILES.
WORKING DAYS: 60
COST OF PLANS: $ 3.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-8 (US-80) from SR-110 just east of Montgomery to the Macon county line. Length 8.084 mi.
BRACKET ESTIMATE: $1,535,000 TO $1,875,000
037 . HSIP-0009(526) & 99-307-203-009-801
COVINGTON COUNTY
LENGTH: 17.36 MILES.
WORKING DAYS: 50
COST OF PLANS: $ 6.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 (US-331) from 0.44 miles north of US-299 north of Opp to the Crenshaw county line. Length 8.681 mi.
BRACKET ESTIMATE: $1,700,000 TO $2,100,000
039 . HSIP-0051(502) & 99-307-162-051-806
COFFEE COUNTY
LENGTH: 20.58 MILES.
WORKING DAYS: 55
COST OF PLANS: $ 7.00
for constructing the Resurfacing, Traffic Stripe and Drainage Extension on SR-51 from SR-167 to the Dale county line. Length 10.293 mi.
BRACKET ESTIMATE: $1,535,000 TO $1,880,000
040 . HSIP-0183(500)
PERRY COUNTY
LENGTH: 2.50 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 4.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-183 from west of Washington creek (MP 11.100) to west of SR-5 (MP 13.600) southwest of Marion. Length 2.500 mi.
BRACKET ESTIMATE: $630,000 TO $770,000
046 . STPAA-0068(501) & STPAA-0283(500)
CHEROKEE COUNTY
LENGTH: 8.00 MILES.
WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 5.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-68 from SR-25 (US-411) to SR-283 and on SR-283 from SR-68 to SR-25 (US-411) in Centre. Length 4.492 mi.
BRACKET ESTIMATE: $1,600,000 TO $2,000,000
048 . STPOA-0195(500)
WINSTON COUNTY
WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 3.00
for constructing the Resurfacing and Traffic Stripe on SR-195 from the Walker county line to Mill Creek south of Double Springs. Length 6.349 mi.
BRACKET ESTIMATE: $1,135,000 TO $1,385,000
049 . STPAA-HSIP-0255(500)
MADISON COUNTY
LENGTH: 3.88 MILES.
WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 7.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-255 from 0.5 miles south of SR-2 (US-72) to just south of SR-53 in Huntsville. Length 3.880 mi.
BRACKET ESTIMATE: $1,500,000 TO $1,800,000
050 . STPAA-HSIP-0017(523)
PICKENS COUNTY
LENGTH: 7.12 MILES.
WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 6.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-17 from the Sumter county line to the Huyck bridge northeast of Cochrane. Length 7.116 mi.
BRACKET ESTIMATE: $1,830,000 TO $2,235,000
053 . STPBH-0025(504)
SHELBY COUNTY
WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $36.00
for constructing the Intersection Improvements Including Signals at five sites on SR-25 in Columbiana as indicated on the plans.
BRACKET ESTIMATE: $1,395,000 TO $1,705,000
054 . STPBH-7190(600)
JEFFERSON COUNTY
WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $16.00
for constructing the Bridge Rehabilitations (2) and Approaches on John Rogers Drive in Birmingham. Length 0.100 mi.
BRACKET ESTIMATE: $750,000 TO $920,000
058 . STPNU-4217(203) & STPOA-CN08(226)
LIMESTONE COUNTY
LENGTH: 9.83 MILES.
WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 5.00
for constructing the Resurfacing and Traffic Stripe on Cairo Hollow Road, Stinnett Hollow Road and Mooresville Road at sites as indicated on the plans. Length 9.826 mi.
BRACKET ESTIMATE: $900,000 TO $1,100,000
059 . STPOA-1704(206) & STPOA-1704(205)
COLBERT COUNTY
WORKING DAYS: 45
COST OF PLANS: $ 6.00
for constructing the Resurfacing, Traffic Stripe, Pavement Markers and Markings on CR-48 at various sites as indicated on the plans. Length 2.220 mi.
BRACKET ESTIMATE: $300,000 TO $360,000
060 . STPOA-2618(200)
ELMORE COUNTY
LENGTH: 0.08 MILES.
WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 5 %
COST OF PLANS: $ 9.00
for constructing the Bridge Replacement on CR-29 at Weoka Creek southeast of Titus. Length 0.083 mi.
BRACKET ESTIMATE: $1,400,000 TO $1,700,000
062 . STPOA-CN08(201)
ETOWAH COUNTY
LENGTH: 14.69 MILES.
WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 3 %
COST OF PLANS: $ 3.00
for constructing the Resurfacing and Traffic Stripe on Duck Springs Road from SR-1 (US-431) to the Dekalb county line north of Gadsden. Length 14.689 mi.
BRACKET ESTIMATE: $2,600,000 TO $3,200,000
064 . STPNU-2535(200)
DEKALB COUNTY
LENGTH: 3.31 MILES.
WORKING DAYS: 45
COST OF PLANS: $ 3.00
for constructing the Resurfacing and Traffic Stripe on various county roads at sites as indicated on the plans. Length 3.360 mi.
BRACKET ESTIMATE: $636,000 TO $777,000
065 . STPNU-3415(200)
HENRY COUNTY
LENGTH: 3.72 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 3.00
for constructing the Resurfacing and Traffic Stripe on CR-26 from CR-99 to CR-53 northwest of Haleburg. Length 3.719 mi.
BRACKET ESTIMATE: $460,000 TO $560,000
066 . STPNU-4405(201)
MACON COUNTY
LENGTH: 1.94 MILES.
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for constructing the Full Depth Reclamation, Resurfacing and Traffic Stripe on CR-4 from the Bullock county line to CR-9 in Chesson. Length 1.938 mi.
BRACKET ESTIMATE: $390,000 TO $475,000
068 . HSIP-0025(516) & 99-301-285-025-801
ETOWAH COUNTY
LENGTH: 10.50 MILES.
WORKING DAYS: 45
COST OF PLANS: $ 4.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-25 (US-411) from the St. Clair county line to SR-77 in Rainbow City. Length 5.250 mi.
BRACKET ESTIMATE: $1,440,000 TO $1,760,000
069 . STPSA-0067(504) & 99-301-521-067-802
MORGAN COUNTY
LENGTH: 24.00 MILES.
WORKING DAYS: 70
COST OF PLANS: $ 6.00
for constructing the Planing, Resurfacing and Traffic Stripe on SR-67 from SR-36 to north of CR-161 (Indian Hills Road) in Priceville. Length 11.620 mi.
BRACKET ESTIMATE: $2,700,000 TO $3,300,000
073 . 99-401-224-665-801
CULLMAN COUNTY
WORKING DAYS: 24
COST OF PLANS: $ 2.00
for the Litter Collection and Maintenance Roadside Mowing along I-65 from the Blount county line to the Morgan county line.
BRACKET ESTIMATE: $56,000 TO $68,000
074 . 99-401-253-659-801
DEKALB COUNTY
WORKING DAYS: 42
COST OF PLANS: $ 2.00
for the Litter Collection and Maintenance Roadside Mowing along I-59 from the Etowah county line to the Georgia state line.
BRACKET ESTIMATE: $106,200 TO $129,800
075 . 99-401-285-000-801
ETOWAH COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 2.00
for the Litter Collection and Maintenance Roadside Mowing along I-59 from the St. Clair county line to the Dekalb county line and along I-759 from I-59 to M.P. 4.54.
BRACKET ESTIMATE: $78,000 TO $95,000
076 . 99-401-690-000-801
MADISON , MORGAN & LIMESTONE COUNTIES
WORKING DAYS: 72
COST OF PLANS: $ 2.00
for the Litter Collection and Maintenance Roadside Mowing along I-65 and I-565 at sites as indicated on the plans.
BRACKET ESTIMATE: $202,500 TO $247,000
077 . 99-405-114-665-811
CHILTON COUNTY
LENGTH: 27.93 MILES.
WORKING DAYS: 60
COST OF PLANS: $ 3.00
for the Maintenance Roadside Mowing along I-65 from the Autauga county line to the Shelby county line. Length 27.927 mi.
BRACKET ESTIMATE: $95,000 TO $116,000
078 . 99-405-323-659-811
GREENE COUNTY
LENGTH: 28.06 MILES.
WORKING DAYS: 60
COST OF PLANS: $ 3.00
for the Maintenance Roadside Mowing from the Sumter county line to the Tuscaloosa county line. Length 28.060 mi.
BRACKET ESTIMATE: $140,000 TO $170,000
079 . 99-405-632-659-811
TUSCALOOSA COUNTY
WORKING DAYS: 80
COST OF PLANS: $ 3.00
for the Maintenance Roadside Mowing along I-59 from the Greene county line to the Jefferson county line. Length 45.515 mi.
BRACKET ESTIMATE: $200,000 TO $240,000