COUNTY:
MOBILE
WORKING DAYS: 120 |
| MBE/DBE CONTRACT OBLIGATION: 7 % |
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $3,295,000 TO $4,000,000
THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 210A000 | 18175 | CUYD | Unclassified Excavation | |
| 210D012 | 34456 | CUYD | Borrow Excavation (A-2-4(0) Or A-4(0) | |
| 230A000 | 169 | RBST | Roadbed Processing | |
| 232A009 | 88821 | SQYD | Lime Stabilization, Class 1, 12" Thick | |
| 232B000 | 2179 | TON | Lime | |
| 301A012 | 110237 | SQYD | CABC, Type B, Plant Mix, 6" Thick | |
| 401A000 | 110237 | SQYD | Bituminous Treatment A | |
| 401A006 | 101186 | SQYD | Bituminous Treatment G | |
| 424B581 | 17708 | TON | Superpave Lwr Bndr 1" ESAL E | |
| 450B000 | 214 | SQYD | Reinforced Concrete Bridge End Slab | |
| 600A000 | 1 | LS | Mobilization | |
| 650B000 | 100086 | CUYD | Topsoil From Stockpiles | |
| 652A100 | 22 | ACRE | Seeding | |
| 652C000 | 22 | ACRE | Mowing | |
| 654A001 | 300 | SQYD | Solid Sodding (Bermuda) | |
| 656B000 | 22 | ACRE | High Performance Mulching | |
| 665A000 | 22 | ACRE | Temporary Seeding | |
| 665B000 | 22 | ACRE | Temporary Mulching | |
| 665C010 | 250 | LF | Temporary Pipe | |
| 665G000 | 500 | EACH | Sand Bags | |
| 665J002 | 17573 | LF | Silt Fence | |
| 665O001 | 17573 | LF | Silt Fence Removal | |
| 665Q002 | 5100 | LF | Wattle | |
| 666A001 | 22 | ACRE | Pest Control Treatment | |
| 680A000 | 1 | LS | Engineering Controls | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 178,000.00) | |
| 999 000 | 750 | HOUR | Trainee Hours At 80 Cents Per Hour |