COUNTY:
BULLOCK
WORKING DAYS: 60 |
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $317,000 TO $388,000
THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 201A002 | 1 | LS | Clear & Grub (Maximum Allowable Bid $ 4000.00 Per Acre) (Approx 1 Acre) | |
| 206B000 | 1 | LS | Removal Of Old Box Culvert, Station 5+01.20 | |
| 210A000 | 34 | CUYD | Unclassified Excavation | |
| 210D021 | 363 | CUYD | Borrow Excav (Lse Trb Meas)(A-4 Better) | |
| 214A000 | 1048 | CUYD | Structure Excavation | |
| 214B001 | 210 | CUYD | Foundation Backfill, Commercial | |
| 401A000 | 804 | SQYD | Bituminous Treatment A | |
| 405A000 | 39 | GAL | Tack Coat | |
| 407B000 | 1 | MILE | Joint Sealant For Hot Mix Asphalt Pave | |
| 424A340 | 49 | TON | Superpave Wrg Surf 1/2" ESAL A/B | |
| 424B636 | 118 | TON | Superpave Upr Bndr Layer 1" Esal A/B | |
| 502A000 | 48672 | LB | Steel Reinforcement | |
| 524A010 | 302 | CUYD | Culvert Concrete | |
| 600A000 | 1 | LS | Mobilization | |
| 610C001 | 160 | TON | Loose Riprap, Class 2 | |
| 610D000 | 127 | SQYD | Filter Blanket | |
| 650A000 | 240 | CUYD | Topsoil | |
| 652A100 | 1 | ACRE | Seeding | |
| 656A010 | 1 | ACRE | Mulching | |
| 665F000 | 40 | EACH | Hay Bales | |
| 665J002 | 800 | LF | Silt Fence | |
| 665O001 | 800 | LF | Silt Fence Removal | |
| 680A000 | 1 | LS | Engineering Controls | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 16,000.00) | |
| 701G249 | 700 | LF | Solid White Cl 2 Ty A Traf Str | |
| 701G258 | 700 | LF | Broken Yellow Cl 2 Ty A Tra Str | |
| 740B000 | 154 | SQFT | Construction Signs | |
| 740F002 | 10 | EACH | Barricades, Type III | |
| 740I005 | 5 | EACH | Warning Lights, Type B (Detachable Head) |