COUNTY:
MARION
WORKING DAYS: 30 |
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $430,000 TO $522,000
THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 210D001 | 1724 | CUYD | Borrow Excavation (Loose Truckbed Meas) | |
| 405A000 | 1626 | GAL | Tack Coat | |
| 407B000 | 3 | MILE | Joint Sealant For Hot Mix Asphalt Pave | |
| 424A340 | 2033 | TON | Superpave Wrg Surf 1/2" ESAL A/B | |
| 424B640 | 300 | TON | Superpave Upr Bndr Patch 1" Esal A/B | |
| 424B643 | 2161 | TON | Superpave Upr Bndr Level 3/4" Esal A/B | |
| 430B043 | 1613 | TON | Agg Surf (1" Down, Crusher Run) | |
| 600A000 | 1 | LS | Mobilization | |
| 630A001 | 550 | LF | Steel Beam Guardrail, Cl A, Ty 2 | |
| 630C050 | 8 | EACH | Guardrail End Anchor, Type 20 Series | |
| 652A100 | 1 | ACRE | Seeding | |
| 656A010 | 1 | ACRE | Mulching | |
| 665F000 | 25 | EACH | Hay Bales | |
| 665J002 | 1500 | LF | Silt Fence | |
| 665O001 | 1500 | LF | Silt Fence Removal | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 21,500.00) | |
| 701A231 | 5 | MILE | Solid White Cl 2 Ty A Traf Str | |
| 701A235 | 4 | MILE | Solid Yellow Cl 2 Ty A Traf Str | |
| 701A245 | 1 | MILE | Broken Yellow Cl 2 Ty A Traf Str | |
| 701C000 | 2 | MILE | Broken Temporary Traffic Stripe | |
| 701C001 | 8 | MILE | Solid Temporary Traffic Stripe | |
| 703A002 | 264 | SQFT | Traffic Control Marking, Class 2, Type A | |
| 705A032 | 35 | EACH | Pavement Markers, Class A-H, Type 1-B | |
| 705A037 | 240 | EACH | Pavement Markers, Class A-H, Type 2-D | |
| 740B000 | 244 | SQFT | Construction Signs | |
| 740E000 | 25 | EACH | Cones (36" High) | |
| 740M001 | 25 | EACH | Ballast For Cone | |
| 740O000 | 1 | EACH | Pilot Car |