Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.
The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
| LENGTH: 2.76 MILES. | WORKING DAYS: 250 |
| DBE CONTRACT OBLIGATION: 6 % | COST OF PLANS: $34.00 |
for constructing the Base, Pavement and Partial Grade and Drain on the Anniston East Bypass from 700' north of Choccolocco Road to 1500' south of Lake Yahou. Length 2.756 mi.
BRACKET ESTIMATE: $11,400,000 TO $14,000,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 9.49 MILES. | CALENDAR DAYS: 75 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for the Clearing along I-65 from south of the CR-48 underpass east of Jemison to the Shelby county line. Length 9.492 mi.
BRACKET ESTIMATE: $1,200,000 TO $1,500,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 0.76 MILES. | WORKING DAYS: 255 |
| DBE CONTRACT OBLIGATION: 5 % | COST OF PLANS: $71.00 |
for constructing the Bridge Replacement and Approaches on SR-35 at Little River southeast of Fort Payne. Length 0.757 mi.
BRACKET ESTIMATE: $6,220,000 TO $7,600,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 75 | |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 5.00 |
for constructing the Planing, Resurfacing, Guardrail and Bridge Rail Retrofit on SR-5 (US-78) from Five Mile Creek to CR-845 (Snowville-Brent Road) in Birmingham. Length 3.529 mi.
BRACKET ESTIMATE: $2,000,000 TO $2,500,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 5.94 MILES. | WORKING DAYS: 50 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 7.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-12 (US-84) from the Clarke county line through Perdue to 0.367 miles east of CR-1. Length 6.613 mi.
BRACKET ESTIMATE: $1,800,000 TO $2,200,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 5.94 MILES. | WORKING DAYS: 70 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 7.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from south of SR-69 in Providence to the south city limit of Demopolis. Length 10.387 mi.
BRACKET ESTIMATE: $2,960,000 TO $3,635,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 310 | |
| DBE CONTRACT OBLIGATION: 5 % | COST OF PLANS: $162 |
for constructing the Additional Lanes (Grade, Drainage, Pavement and Signals) on SR-53 (US-231) from SR-210 (Ross Clark Circle) in Dothan to north of John D.Odom Road and the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from Horace Shephard Drive in Dothan to Troy University's driveway. Length 3.463 mi.
BRACKET ESTIMATE: $12,800,000 TO $15,600,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 12.41 MILES. | WORKING DAYS: 210 |
| DBE CONTRACT OBLIGATION: 8 % | COST OF PLANS: $82.00 |
for the Removal of Crossovers and Construction of Turn Lanes on SR-1 (US-431) from Boaz to south of Guntersville. Length 12.405 mi.
BRACKET ESTIMATE: $7,230,000 TO $8,835,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 60 | |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 7.00 |
for constructing the Planing, Resurfacing, Guardrail and Bridge Rail Retrofit on SR-5 (US-78) from the CR-65 overpass to Five Mile Creek in Birmingham. Length 6.777 mi.
BRACKET ESTIMATE: $3,300,000 TO $4,000,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 7.82 MILES. | WORKING DAYS: 65 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-74 (US-278) from the Winston County line at Nesmith to MP 69.417. Length 7.818 mi.
BRACKET ESTIMATE: $2,260,000 TO $2,760,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 1.75 MILES. | WORKING DAYS: 275 |
| DBE CONTRACT OBLIGATION: 10 % | COST OF PLANS: $49.00 |
for constructing the Additional Lanes (Grade, Drainage and Pavement) on CR-56 ( Airport Blvd.) from west of Snow Road to Flave Pierce Road south of the Mobile Regional Airport. Length 1.751 mi.
BRACKET ESTIMATE: $7,300,000 TO $9,000,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 10.05 MILES. | WORKING DAYS: 130 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 6.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-38 (US-280) from the Oak Grove city limits to the Coosa county line. Length 10.045 mi.
BRACKET ESTIMATE: $5,100,000 TO $6,300,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 0.56 MILES. | WORKING DAYS: 90 |
| DBE CONTRACT OBLIGATION: 5 % | COST OF PLANS: $33.00 |
for constructing the Safety Improvements at various sites as indicated on the plans.
BRACKET ESTIMATE: $860,000 TO $1,000,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 16.04 MILES. | WORKING DAYS: 60 |
| COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-185 from SR-3 (US-31) to SR-263 and on SR-245 from CR-41 to SR-185 in Greenville. Length 8.014 mi.
BRACKET ESTIMATE: $1,840,000 TO $2,250,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 50 |
| COST OF PLANS: $11.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-27 from the Ozark east city limit to east of CR-59. Length 6.398 mi.
BRACKET ESTIMATE: $1,720,000 TO $2,100,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 6.25 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 2.00 |
for constructing the Traffic Stripe, Markings, Legends and Pavement Markers on Bynum-Leatherwood Road from SR-202 in Oxford to US-431. Length 5.723 mi.
BRACKET ESTIMATE: $90,000 TO $110,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 30 |
| COST OF PLANS: $ 9.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 (US-331) from just east of SR-10 in Luverne to CR-57 (Airport Road). Length 2.735 mi.
BRACKET ESTIMATE: $700,000 TO $800,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 5.43 MILES. | WORKING DAYS: 30 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 3.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-117 from SR-75 in Ider to SR-71 at Flat Rock. Length 5.429 mi.
BRACKET ESTIMATE: $1,955,000 TO $2,390,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 6.67 MILES. | WORKING DAYS: 60 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-171 from north of CR-45 (MP 64.145) to north of CR-35 (MP 70.817) in Hamilton. Length 6.671 mi.
BRACKET ESTIMATE: $1,740,000 TO $2,100,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 4.34 MILES. | WORKING DAYS: 70 |
| DBE CONTRACT OBLIGATION: 3 % | COST OF PLANS: $ 4.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from north of SR-158 (MP 4.660) in Saraland to north of Plateau Avenue (MP 9.049) in Satsuma. Length 4.389 mi.
BRACKET ESTIMATE: $1,665,000 TO $2,030,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 4.62 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 2.00 |
for constructing the Resurfacing and Traffic Stripe on CR-87 from CR-434 at Five Points to the Morgan County line. Length 4.622 mi.
BRACKET ESTIMATE: $460,000 TO $560,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 6.44 MILES. | WORKING DAYS: 45 |
| COST OF PLANS: $ 3.00 |
for constructing the Resurfacing and Traffic Stripe on CR-9 and CR-45 at sites as indicated on the plans. Length 6.442 mi.
BRACKET ESTIMATE: $775,000 TO $950,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 75 |
| COST OF PLANS: $10.00 |
for constructing the Turn Lanes (Grade, Drainage, Pavement and Signing) on SR-3 (US-31) at the new school in Georgiana. Length 0.275 mi.
BRACKET ESTIMATE: $495,000 TO $600,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 0.17 MILES. | WORKING DAYS: 60 |
| COST OF PLANS: $ 4.00 |
for constructing the Traffic Signal at the intersection of Haley Drive and Titus Drive east of Cherokee. Length 0.170 mi.
BRACKET ESTIMATE: $80,000 TO $99,000
VIEW ITEMSReturn To: Top of this Page
| LENGTH: 6.34 MILES. | WORKING DAYS: 30 |
| COST OF PLANS: $ 3.00 |
for constructing the Planing, Resurfacing and Traffic Stripe on SR-68 from the east city limit of Crossville to the west city limit of Collinsville. Length 6.400 mi.
BRACKET ESTIMATE: $1,585,000 TO $1,935,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 75 |
| COST OF PLANS: $ 5.00 |
for constructing the Resurfacing and Traffic Stripe on SR-99 and on SR-207 at sites as indicated by the plans. Length 8.922 mi.
BRACKET ESTIMATE: $2,800,000 TO $3,500,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 30 |
| COST OF PLANS: $ 2.00 |
for constructing the Resurfacing and Traffic Stripe on SR-107 from approximately 800' south of the Fayette county line to SR-118 (US-278) in Guin. Length 3.279 mi.
BRACKET ESTIMATE: $650,000 TO $800,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 60 |
| COST OF PLANS: $ 3.00 |
for the Roadside Mowing, Litter Collection and Selective Clearing along I-10 and I-65.
BRACKET ESTIMATE: $210,000 TO $255,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 100 |
| COST OF PLANS: $ 3.00 |
for the Roadside Mowing, Litter Collection and Selective Clearing along I-10, I-65 and I-165.
BRACKET ESTIMATE: $220,000 TO $270,000
VIEW ITEMSReturn To: Top of this Page
| WORKING DAYS: 45 |
| COST OF PLANS: $ 3.00 |
for the Roadside Mowing, Litter Collection and Selective Clearing along I-65.
BRACKET ESTIMATE: $188,000 TO $230,000
VIEW ITEMSReturn To: Top of this Page