Office Engineer

Proposal Letting List
June 25, 2010 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages ande-mail the Web Page Editor with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


005 . STMNU-BR-1710(201) , COLBERT 008 . BRZ-4100(213) , LEE
010 . HPP-STPAA-STPNU-RECA-1702(905) , BALDWIN 012 . NH-0002(536) , JACKSON
013 . NH-0157(516) , CULLMAN 015 . NH-0157(507) , LAWRENCE
016 . NH-HSIP-HPP-0001(556) , RANDOLPH 018 . HSIP-0003(562) , JEFFERSON
022 . STPAA-0075(518) , JEFFERSON 023 . STPAA-HSIP-0144(500) , ST. CLAIR
024 . STPAA-0167(503) , PIKE 025 . STPAA-0167(504) , COFFEE
026 . STPAA-0171(506) , TUSCALOOSA 027 . STPAA-0215(500) , TUSCALOOSA
029 . STPAA-8570(601) , MADISON 032 . STPAA-HSIP-0016(509) , MOBILE
033 . STPAA-HSIP-0099(503) , LIMESTONE 034 . STPAA-HSIP-0106(501) , CRENSHAW
038 . STPMB-7500(602) , MOBILE 040 . STPNU-CN10(218) , CRENSHAW
046 . STPOA-7901(600) , MONTGOMERY 050 . 99-301-253-068-002 , DEKALB, etc.
052 . 99-303-371-007-001 , JEFFERSON 053 . 99-303-582-053-001 , ST. CLAIR
054 . 99-403-371-000-001 , JEFFERSON

005 . STMNU-BR-1710(201) COLBERT COUNTY

LENGTH: 1400.00 MILES. WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $12.00

for constructing the Bridge Replacement and Approaches on CR-1 at Rock Creek southeast of Maud. Length 0.265 mi.

BRACKET ESTIMATE: $1,005,000 TO $1,220,000

VIEW ITEMS

Return To: Top of this Page


008 . BRZ-4100(213) LEE COUNTY

LENGTH: 0.18 MILES. WORKING DAYS: 90
COST OF PLANS: $ 6.00

for constructing the Bridge Replacement (Precast) and Approaches on CR-037 at a tributary of Watula Creek north of Marvyn. Length 0.184 mi.

BRACKET ESTIMATE: $444,000 TO $542,000

VIEW ITEMS

Return To: Top of this Page


010 . HPP-STPAA-STPNU-RECA-1702(905) BALDWIN COUNTY

LENGTH: 3.65 MILES. CALENDAR DAYS: 740
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $131

for constructing the Grade, Drain, Pavement, Signals, UST Removal and Bridge on CR-83 from US-90 to CR-64 northeast of Robertsdale. Length 3.653 mi.

BRACKET ESTIMATE: $17,600,000 TO $21,500,000

VIEW ITEMS

Return To: Top of this Page


012 . NH-0002(536) & NH-0002(537) JACKSON COUNTY

LENGTH: 7.82 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, Traffic Stripe and Bridge Rail Retrofit on SR-2 (US-72) from CR-11 to SR-79 in Scottsboro. Length 3.910 mi.

BRACKET ESTIMATE: $1,215,000 TO $1,485,000

VIEW ITEMS

Return To: Top of this Page


013 . NH-0157(516) CULLMAN COUNTY

LENGTH: 0.60 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-157 (including Service Roads) from SR-74 (US-278) to SR-69 east of Cullman. Length 0.601 mi.

BRACKET ESTIMATE: $500,000 TO $610,000

VIEW ITEMS

Return To: Top of this Page


015 . NH-0157(507) LAWRENCE COUNTY

LENGTH: 3.31 MILES. WORKING DAYS: 180
COST OF PLANS: $ 5.00

for constructing the Roadway Lighting on SR-157 from 0.2 miles south of CR-87 to 0.2 miles north of CR-33 in Moulton. Length 3.313 mi.

BRACKET ESTIMATE: $2,000,000 TO $2,400,000

VIEW ITEMS

Return To: Top of this Page


016 . NH-HSIP-HPP-0001(556) RANDOLPH COUNTY

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from the Chambers County line to the north city limit of Roanoke. Length 6.442 mi.

BRACKET ESTIMATE: $2,135,000 TO $2,600,000

VIEW ITEMS

Return To: Top of this Page


018 . HSIP-0003(562) & 99-303-371-003-001 JEFFERSON COUNTY

LENGTH: 7.00 MILES. WORKING DAYS: 45
COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from 52nd Avenue to 0.4 miles north of Black Creek in Fultondale. Length 3.500 mi.

BRACKET ESTIMATE: $1,700,000 TO $2,100,000

VIEW ITEMS

Return To: Top of this Page


022 . STPAA-0075(518) JEFFERSON COUNTY

LENGTH: 4.46 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-75 from 0.2 miles north of Pinson Valley High School through Palmerdale to the Blount county line. Length 4.460 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,900,000

VIEW ITEMS

Return To: Top of this Page


023 . STPAA-HSIP-0144(500) ST. CLAIR COUNTY

LENGTH: 6.83 MILES. WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-144 from CR-26 in Ragland to the Henry Neely Dam at the Coosa River. Length 6.830 mi.

BRACKET ESTIMATE: $1,110,000 TO $1,355,000

VIEW ITEMS

Return To: Top of this Page


024 . STPAA-0167(503) PIKE COUNTY

LENGTH: 4.07 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-167 from the Coffee county line to SR-87 south of Spring Hill. Length 4.069 mi.

BRACKET ESTIMATE: $724,000 TO $885,000

VIEW ITEMS

Return To: Top of this Page


025 . STPAA-0167(504) COFFEE COUNTY

LENGTH: 6.23 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-167 from north of CR-48 (Salem Road) in Enterprise to CR-154. Length 6.230 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,300,000

VIEW ITEMS

Return To: Top of this Page


026 . STPAA-0171(506) TUSCALOOSA COUNTY

LENGTH: 4.64 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-171 from north of SR-13 (US-43) (MP 0.057) to Mary Road (MP 4.700). Length 4.643 mi.

BRACKET ESTIMATE: $1,990,000 TO $2,400,000

VIEW ITEMS

Return To: Top of this Page


027 . STPAA-0215(500) TUSCALOOSA COUNTY

LENGTH: 2.00 MILES. WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-215 from Brookhill Road to SR-7 (US-11) in Cottondale. Length 2.000 mi.

BRACKET ESTIMATE: $970,000 TO $1,180,000

VIEW ITEMS

Return To: Top of this Page


029 . STPAA-8570(601) MADISON COUNTY

LENGTH: 1.61 MILES. WORKING DAYS: 360
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $88.00

for constructing the Grade, Drainage, Pavement, Signing, Lighting, Signals and Bridges on SR-255 (Research Park Boulevard/Martin Luther King Jr. Boulevard) from south of SR-53 to north of SR-53 in Huntsville. Length 1.609 mi.

BRACKET ESTIMATE: $19,995,000 TO $24,400,000

VIEW ITEMS

Return To: Top of this Page


032 . STPAA-HSIP-0016(509) MOBILE COUNTY

LENGTH: 6.12 MILES. WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-16 (US-90) from east of the Fowl River bridge (MP 13.176) to the Halls Mill Creek bridge at Tillman's Corner. Length 6.122 mi.

BRACKET ESTIMATE: $2,410,000 TO $2,950,000

VIEW ITEMS

Return To: Top of this Page


033 . STPAA-HSIP-0099(503) LIMESTONE COUNTY

LENGTH: 2.83 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-99 from west of Elkton Road (MP 0.710) to MP 3.560 in Athens. Length 2.831 mi.

BRACKET ESTIMATE: $950,000 TO $1,200,000

VIEW ITEMS

Return To: Top of this Page


034 . STPAA-HSIP-0106(501) CRENSHAW COUNTY

LENGTH: 7.69 MILES. WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-106 from the Patsaliga River bridge to SR-15 (US-29) west of Brantley. Length 7.685 mi.

BRACKET ESTIMATE: $1,900,000 TO $2,160,000

VIEW ITEMS

Return To: Top of this Page


038 . STPMB-7500(602) MOBILE COUNTY

WORKING DAYS: 160 COST OF PLANS: $12.00

for constructing the Signal Interconnection on Airport Boulevard (CR-56) from Cody Road (CR-429) to Williams Street in Mobile.

BRACKET ESTIMATE: $315,000 TO $390,000

VIEW ITEMS

Return To: Top of this Page


040 . STPNU-CN10(218) CRENSHAW COUNTY

LENGTH: 8.10 MILES. WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing on CR-39 from SR-15 (US-29) to the Luverne city limit. Length 8.097 mi.

BRACKET ESTIMATE: $490,000 TO $590,000

VIEW ITEMS

Return To: Top of this Page


046 . STPOA-7901(600) MONTGOMERY COUNTY

LENGTH: 4.32 MILES. WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-40 from SR-53 (US-231) south of Montgomery to Pike Road. Length 4.321 mi.

BRACKET ESTIMATE: $585,000 TO $710,000

VIEW ITEMS

Return To: Top of this Page


050 . 99-301-253-068-002 ,99-301-253-168-001 & 99-301-484-068-001 DEKALB & MARSHALL COUNTIES

LENGTH: 11.28 MILES. WORKING DAYS: 100
COST OF PLANS: $16.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-68 and SR-168 at sites as indicated by the plans. Length 11.280 mi.

BRACKET ESTIMATE: $3,185,000 TO $3,890,000

VIEW ITEMS

Return To: Top of this Page


052 . 99-303-371-007-001 JEFFERSON COUNTY

WORKING DAYS: 40 COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-7 (US-11) from Tutwiler Drive to CR-10 (Chalkville Road) in Birmingham. Length 1.123 mi.

BRACKET ESTIMATE: $425,000 TO $520,000

VIEW ITEMS

Return To: Top of this Page


053 . 99-303-582-053-001 ST. CLAIR COUNTY

LENGTH: 3.23 MILES. WORKING DAYS: 50
COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from south of SR-34 (MP 216.890) to Dr. John Haynes Drive in Pell City. Length 3.230 mi.

BRACKET ESTIMATE: $1,385,000 TO $1,690,000

VIEW ITEMS

Return To: Top of this Page


054 . 99-403-371-000-001 JEFFERSON COUNTY

LENGTH: 131.30 MILES. WORKING DAYS: 60
COST OF PLANS: $ 6.00

for the Maintenance Roadside Mowing along I-20, I-59, I-65, I-459 and SR-4 (Corridor X) at sites as indicated by the plans.

BRACKET ESTIMATE: $200,000 TO $240,000

VIEW ITEMS

Return To: Top of this Page