May 28, 2010 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


002 . IM-I085(330) , MONTGOMERY, etc. 007 . STMNU-4500(216) , MADISON
008 . STMAA-0041(504) , CONECUH 010 . BR-0171(504) , MARION
011 . BR-4414(202) , MACON 013 . BRZ-4400(205) , MACON
014 . BRZ-5200(221) , MORGAN 016 . HSIP-0053(536) , MONTGOMERY
017 . HSIP-STPAA-0007(528) , DEKALB 018 . HSIP-STPAA-0165(502) , RUSSELL
020 . NH0001(557) , MADISON 021 . NH-0008(560) , DALLAS
022 . NH-0012(540) , DALE, etc. 023 . NH-HSIP-0009(536) , CHEROKEE
025 . SRTS-SR09(900) , BALDWIN 028 . STPAA-CN10(924) , JEFFERSON
030 . STPAA-0016(508) , BALDWIN 031 . STPAA-0017(533) , MARION
032 . STPAA-0027(507) , COFFEE 033 . STPAA-0053(549) , MADISON
034 . STPAA-0069(531) , MARSHALL 036 . STPAA-0160(502) , BLOUNT
038 . NH-0210(502) , HOUSTON 039 . STPAA-0247(500) , COLBERT
040 . STPAA-0253(503) , MARION 042 . STPAA-HSIP-0007(527) , ST. CLAIR
044 . STPNU-CN10(206) , HENRY 045 . STPNU-0325(200) , BARBOUR
046 . STPOA-0819(202) , CALHOUN 047 . STPNU-1552(200) , CLEBURNE
048 . STPNU-1600(224) , COFFEE 049 . STPNU-2000(211) , COVINGTON
051 . STPNU-2910(200) , FAYETTE 052 . STPNU-2915(200) , FAYETTE
053 . STPNU-4007(200) , LAWRENCE 054 . STPNU-6700(213) , WINSTON
055 . STPOA-5A15(600) , LIMESTONE 056 . STPAA-0017(509) , LAUDERDALE *
057 . STPAA-0202(521) , CALHOUN 058 . STPOA-7908(600) , ELMORE
059 . STPOA-BR-0022(507) , TALLAPOOSA 060 . 99-409-491-000-003 , MOBILE
061 . 99-302-391-133-001 , LAUDERDALE 062 . 99-302-402-033-001 , LAWRENCE
063 . 99-305-535-219-001 , PERRY 064 . 99-409-022-010-930 , BALDWIN
* - WITHDRAWN FROM LETTING

002 . IM-I085(330) MONTGOMERY & MACON COUNTIES

SHALL BE COMPLETED BY: October 1, 2011
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $30.00

for constructing the Pavement Rehabilitation on I-85 from south of SR-8 (US-80) (MP 9.95) to east of Line Creek (MP 19.03). Length 9.079 mi.

BRACKET ESTIMATE: $11,390,000 TO $13,920,000

VIEW ITEMS

Return To: Top of this Page


007 . STMNU-4500(216) MADISON COUNTY

LENGTH: 0.01 MILES. WORKING DAYS: 45
COST OF PLANS: $ 5.00

for constructing the Bridge Replacement (Bridge Culvert) on Low Gap Road at Glover Creek east of Owens Crossroads. Length 0.008 mi.

BRACKET ESTIMATE: $155,000 TO $190,000

VIEW ITEMS

Return To: Top of this Page


008 . STMAA-0041(504) CONECUH COUNTY

LENGTH: 10.27 MILES. WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-41 from I-65 to SR-12 (US-84) in Repton. Length 10.273 mi.

BRACKET ESTIMATE: $2,600,000 TO $3,100,000

VIEW ITEMS

Return To: Top of this Page


010 . BR-0171(504) MARION COUNTY

WORKING DAYS: 245
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $32.00

for constructing the Bridge Replacement and Approaches on SR-171 (US-43) at East Branch in Winfield. Length 0.331 mi.

BRACKET ESTIMATE: $2,530,000 TO $3,090,000

VIEW ITEMS

Return To: Top of this Page


011 . BR-4414(202) MACON COUNTY

LENGTH: 0.02 MILES. WORKING DAYS: 50
COST OF PLANS: $ 5.00

for constructing the Bridge Replacement (Precast) on CR-43 at Cossey Branch north of Society Hill. Length 0.022 mi.

BRACKET ESTIMATE: $327,000 TO $400,000

VIEW ITEMS

Return To: Top of this Page


013 . BRZ-4400(205) MACON COUNTY

LENGTH: 0.14 MILES. WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Bridge Replacement and Approaches on CR-48 at Cooper Creek east of Franklin. Length 0.143 mi.

BRACKET ESTIMATE: $615,000 TO $755,000

VIEW ITEMS

Return To: Top of this Page


014 . BRZ-5200(221) MORGAN COUNTY

LENGTH: 0.21 MILES. WORKING DAYS: 90
COST OF PLANS: $ 8.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on CR-1165 (Gandys Cove Road) at Dry Creek northwest of Eva. Length 0.207 mi.

BRACKET ESTIMATE: $387,000 TO $473,000

VIEW ITEMS

Return To: Top of this Page


016 . HSIP-0053(536) & 99-306-513-053-001 MONTGOMERY COUNTY

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from Pine Level (MP 96.360) to south of Athey Road (MP 101.000). Length 4.639 mi.

BRACKET ESTIMATE: $2,800,000 TO $3,400.000

VIEW ITEMS

Return To: Top of this Page


017 . HSIP-STPAA-0007(528) DEKALB COUNTY

LENGTH: 1.48 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-7 (US-11) from north of Airport Road (MP 231.930) to MP 233.410 north of Fort Payne. Length 1.479 mi.

BRACKET ESTIMATE: $444,000 TO $542,000

VIEW ITEMS

Return To: Top of this Page


018 . HSIP-STPAA-0165(502) RUSSELL COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-165 from SR-208 at Cottonton to north of Bluff Creek (MP 16.400). Length 5.080 mi.

BRACKET ESTIMATE: $2,570,000 TO $3,140,000

VIEW ITEMS

Return To: Top of this Page


020 . NH-0001(557) MADISON COUNTY

LENGTH: 0.54 MILES. WORKING DAYS: 70
COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431/231) and on the service roads on Memorial Parkway in Huntsville at various sites as indicated by the plans. Length 0.538 mi.

BRACKET ESTIMATE: $396,000 TO $484,000

VIEW ITEMS

Return To: Top of this Page


021 . NH-0008(560) DALLAS COUNTY

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-8 (US-80) from west of the Cahaba River (MP 73.760) to west of SR-14 (MP 81.250) at Selma. Length 7.489 mi.

BRACKET ESTIMATE: $3,455,000 TO $4,220,000

VIEW ITEMS

Return To: Top of this Page


022 . NH-0012(540) & NH-0012(541) DALE & COFFEE COUNTIES

LENGTH: 6.16 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $17.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-12 (US-84) from SR-167 in Enterprise to west of SR-85 (MP 188.412). Length 6.159 mi.

BRACKET ESTIMATE: $2,000,000 TO $2,400,000

VIEW ITEMS

Return To: Top of this Page


023 . NH-HSIP-0009(536) CHEROKEE COUNTY

LENGTH: 3.60 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 from the end of the five lane at Cedar Bluff (MP 264.600) to north of SR-35 (MP 268.200). Length 3.600 mi.

BRACKET ESTIMATE: $960,000 TO $1,170,000

VIEW ITEMS

Return To: Top of this Page


025 . SRTS-SR09(900) BALDWIN COUNTY

WORKING DAYS: 60
COST OF PLANS: $ 8.00

for constructing the Sidewalk on Boothe Road from CR-44 to Spring Run Drive in Fairhope. Length 0.836 mi.

BRACKET ESTIMATE: $185,000 TO $226,000

VIEW ITEMS

Return To: Top of this Page


028 . STPAA-CN10(924) JEFFERSON COUNTY

\
WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 %COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-5 (US-11) from Lomb Avenue to Arkadelphia Road and on SR-7 (US-11) from Arkadelphia Road to 9th Street in Birmingham. Length 2.451 mi.

BRACKET ESTIMATE: $864,000 TO $1,000,000

VIEW ITEMS

Return To: Top of this Page


030 . STPAA-0016(508) BALDWIN COUNTY

LENGTH: 3.60 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-16 (US-90) from south of CR-55 (MP 55.794) to north of CR-54 (MP 59.393) north of Robertsdale. Length 3.599 mi.

BRACKET ESTIMATE: $1,200,000 TO $1,460,000

VIEW ITEMS

Return To: Top of this Page


031 . STPAA-0017(533) MARION COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-17 from SR-4 (Corridor X) to SR-171 in Hamilton. Length 3.334 mi.

BRACKET ESTIMATE: $863,000 TO $1,000,000

VIEW ITEMS

Return To: Top of this Page


032 . STPAA-0027(507) COFFEE COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-27 from SR-192 to SR-12 (US-84) in Enterprise. Length 2.727 mi.

BRACKET ESTIMATE: $654,000 TO $799,000

VIEW ITEMS

Return To: Top of this Page


033 . STPAA-0053(549) MADISON COUNTY

LENGTH: 1.53 MILES. WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 from US-231/US-431 to Fourteenth Street in Huntsville. Length 1.532 mi.

BRACKET ESTIMATE: $655,000 TO $800,000

VIEW ITEMS

Return To: Top of this Page


034 . STPAA-0069(531) & STPAA-0069(532) MARSHALL COUNTY

LENGTH: 6.36 MILES. WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $10.00

for constructing the Planing, Resurfacing, Traffic Stripe and Bridge Rail Retrofit on SR-69 from CR-14 (Warrenton Road) to US-431 in Guntersville. Length 3.180 mi.

BRACKET ESTIMATE: $1,900,000 TO $2,300,000

VIEW ITEMS

Return To: Top of this Page


036 . STPAA-0160(502) BLOUNT COUNTY

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-160 from Odice Branham Road in Nectar to SR-53 (US-231) in Cleveland. Length 4.795 mi.

BRACKET ESTIMATE: $710,000 TO $870,000

VIEW ITEMS

Return To: Top of this Page


038 . NH-0210(502) & NH-HSIP-0210(503) HOUSTON COUNTY

WORKING DAYS: 115
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing, Traffic Stripe and Bridge Rail Retrofit on SR-210 (Ross Clark Circle) from west of SR-1 (US-231) to north of SR-12 (US-84) in Dothan. Length 3.602 mi.

BRACKET ESTIMATE: $3,145,000 TO $3,845,000

VIEW ITEMS

Return To: Top of this Page


039 . STPAA-0247(500) COLBERT COUNTY

WORKING DAYS: 30 COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-247 from CR-144 (Posey Lane) to CR-49 (Red Rock Road) southwest of Tuscumbia. Length 1.802 mi.

BRACKET ESTIMATE: $349,000 TO $427,000

VIEW ITEMS

Return To: Top of this Page


040 . STPAA-0253(503) MARION COUNTY

LENGTH: 4.61 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-253 from CR-45 through Pearces Mill to SR-74 US-278). Length 4.609 mi.

BRACKET ESTIMATE: $1,275,000 TO $1,560,000

VIEW ITEMS

Return To: Top of this Page


042 . STPAA-HSIP-0007(527) ST. CLAIR COUNTY

LENGTH: 8.94 MILES. WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-7 (US-11) from the Jefferson County line to SR-23. Length 8.938 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,835,000

VIEW ITEMS

Return To: Top of this Page


044 . STPNU-CN10(206) HENRY COUNTY

LENGTH: 6.12 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 4.00

for constructing the Full Depth Reclamation and Resurfacing on CR-46 from CR-57 to SR-10 north of Shorterville. Length 6.120 mi.

BRACKET ESTIMATE: $1 ,000,000 TO $1,250,000

VIEW ITEMS

Return To: Top of this Page


045 . STPNU-0325(200) BARBOUR COUNTY

LENGTH: 5.45 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 3.00

for constructing the Full Depth Reclamation and Resurfacing on CR-49 from CR-89 at Spring Hill to the Russell County line. Length 5.451 mi.

BRACKET ESTIMATE: $610,000 TO $740,000

VIEW ITEMS

Return To: Top of this Page


046 . STPOA-0819(202) CALHOUN COUNTY

LENGTH: 4.93 MILES. WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-19 (Roy Webb Road) from Foster West Road to SR-74 US-278) west of Piedmont. Length 4.932 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,300,000

VIEW ITEMS

Return To: Top of this Page


047 . STPNU-1552(200) CLEBURNE COUNTY

LENGTH: 3.78 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-13 from CR-36 to SR-9 at Belltown. Length 3.787 mi.

BRACKET ESTIMATE: $580,000 TO $710,000

VIEW ITEMS

Return To: Top of this Page


048 . STPNU-1600(224) COFFEE COUNTY

LENGTH: 2.95 MILES. WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-545 from SR-134 at Turner Crossroads to CR-514. Length 2.950 mi.

BRACKET ESTIMATE: $415,000 TO $500,000

VIEW ITEMS

Return To: Top of this Page


049 . STPNU-2000(211) & STPNU-2000(210) COVINGTON COUNTY

LENGTH: 4.52 MILES. WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing on CR-18 from US-331 to CR-89 and on CR-89 from CR-10 to CR-18 northeast of Florala. Length 4.518 mi.

BRACKET ESTIMATE: $536,000 TO $655,000

VIEW ITEMS

Return To: Top of this Page


051 . STPNU-2910(200) FAYETTE COUNTY

LENGTH: 9.68 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-63 from SR-18 in Berry to SR-102. Length 9.681 mi.

BRACKET ESTIMATE: $1,280,000 TO $1,570,000

VIEW ITEMS

Return To: Top of this Page


052 . STPNU-2915(200) FAYETTE COUNTY

LENGTH: 1.35 MILES. WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-50 from SR-129 to CR-53 east of Hubbertville. Length 1.345 mi.

BRACKET ESTIMATE: $190,000 TO $232,000

VIEW ITEMS

Return To: Top of this Page


053 . STPNU-4007(200) LAWRENCE COUNTY

LENGTH: 5.02 MILES. WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-87 from the east Moulton city limits to CR-434. Length 5.017 mi.

BRACKET ESTIMATE: $440,000 TO $538,000

VIEW ITEMS

Return To: Top of this Page


054 . STPNU-6700(213) WINSTON COUNTY

LENGTH: 4.42 MILES. WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-15 from CR-23 east of Haleyville to SR-195. Length 4.411 mi.

BRACKET ESTIMATE: $330,000 TO $405,000

VIEW ITEMS

Return To: Top of this Page


055 . STPOA-5A15(600) LIMESTONE COUNTY

LENGTH: 2.22 MILES. WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on Huntsville-Brownsferry Road from SR-3 (US-31) to Piney Creek in Athens. Length 2.223 mi.

BRACKET ESTIMATE: $395,000 TO $480,000

VIEW ITEMS

Return To: Top of this Page


056 . STPAA-0017(509) LAUDERDALE COUNTY

WORKING DAYS: 225
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $62.00

for constructing the Additional Lane on SR-17 (Helton Drive) from Hermitage Drive to Cox Creek Parkway SR-133) in Florence. Length 1.551 mi.

BRACKET ESTIMATE: $4,055,000 TO $4,950,000

*** WITHDRAWN FROM LETTING ***

Return To: Top of this Page


057 . STPAA-0202(521) CALHOUN COUNTY

LENGTH: 4.58 MILES. WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-202 from CR-109 to SR-1 (US-431) in Anniston. Length 4.580 mi.

BRACKET ESTIMATE: $2,310,000 TO $2,825,000

VIEW ITEMS

Return To: Top of this Page


058 . STPOA-7908(600) ELMORE COUNTY

LENGTH: 1.91 MILES. WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on Airport Road from Coosada Road to Kennedy Avenue in Coosada. Length 1.908 mi.

BRACKET ESTIMATE: $260,000 TO $315,000

VIEW ITEMS

Return To: Top of this Page


059 . STPOA-BR-0022(507) TALLAPOOSA COUNTY

WORKING DAYS: 270
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $64.00

for constructing the Bridge Replacement and Approaches on SR-22 at Hillabee Creek east of Alexander City. Length 1.510 mi.

BRACKET ESTIMATE: $6,030,000 TO $7,300,000

VIEW ITEMS

Return To: Top of this Page


060 . 99-409-491-000-003 MOBILE COUNTY

WORKING DAYS: 100 COST OF PLANS: $ 3.00

for the Roadside Mowing, Litter Collection and Selective Clearing along I-10, I-65 and I-165 at sites as indicated by the plans.

BRACKET ESTIMATE: $145,000 TO $175,000

VIEW ITEMS

Return To: Top of this Page


061 . 99-302-391-133-001 LAUDERDALE COUNTY

LENGTH: 3.45 MILES. WORKING DAYS: 45
COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-133 from SR-157 to Mangum Street in Florence. Length 3.454 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,370,000

VIEW ITEMS

Return To: Top of this Page


062 . 99-302-402-033-001 LAWRENCE COUNTY

WORKING DAYS: 45 COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-33 from near CR-578 (MP 35.528) to SR-20 in Courtland. Length 4.116 mi.

BRACKET ESTIMATE: $944,000 TO $1,150,000

VIEW ITEMS

Return To: Top of this Page


063 . 99-305-535-219-001 PERRY COUNTY

LENGTH: 8.27 MILES. WORKING DAYS: 75
COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-219 from the Dallas County line to north of CR-32 (MP 19.000). Length 8.272 mi.

BRACKET ESTIMATE: $2,385,000 TO $2,915,000

VIEW ITEMS

Return To: Top of this Page


064 . 99-409-022-010-930 BALDWIN COUNTY

WORKING DAYS: 45 COST OF PLANS: $ 2.00

for the Coating of the existing Water Tower on I-10 at the Welcome Center near the Florida State Line.

BRACKET ESTIMATE: $103,000 TO $126,000

VIEW ITEMS

Return To: Top of this Page