Office Engineer

Proposal Letting List
September 24, 2010 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-STPAAF-BRF-I020(333) , TALLADEGA, etc. 004 . STPAAF-EOAPF-BRF-I010(301) , MOBILE
008 . STMOA-CN10(922) , TUSCALOOSA 010 . BR-0015(500) , CHAMBERS
012 . BRF-0269(500) , JEFFERSON 015 . DE-AL71(928) , BLOUNT
018 . ER-8910(951) , COVINGTON, etc. 022 . HPP-A136(900) , JEFFERSON
023 . HSIP-0010(529) , BUTLER 024 . HSIP-0134(503) , HENRY
029 . STPAA-0195(502) , WINSTON 030 . EOAP-0010(528) , CRENSHAW
031 . STPAA-0017(509) , LAUDERDALE 032 . STPAA-0069(534) , CLARKE
035 . STPAA-HSIP-0087(508) , COFFEE 036 . EOAP-HSIP-0141(502) , CRENSHAW
038 . STPOA-2624(201) , ELMORE 041 . STPNU-0127(200) , AUTAUGA
045 . 99-305-632-215-001 , TUSCALOOSA 046 . 99-302-302-013-101 , FRANKLIN
047 . 99-308-663-028-011 , WILCOX

001 . IM-STPAAF-BRF-I020(333) & ST-008-021-004 TALLADEGA & CALHOUN COUNTIES

SHALL BE COMPLETED BY: June 1, 2013
DBE CONTRACT OBLIGATION: 9 % COST OF PLANS: $154

for constructing the Additional Lanes (Grade, Drain, Pavement, Bridge and Signals) on I-20 from west of the HJ Bentley Parkway Bridge to east of the Snow Creek Bridge in Oxford. Length 4.478 mi.

BRACKET ESTIMATE: $42,600,000 TO $52,100,000

VIEW ITEMS

Return To: Top of this Page


004 . STPAAF-EOAPF-BRF-I010(301) MOBILE COUNTY

LENGTH: 3.55 MILES. SHALL BE COMPLETED BY: June 1, 2013
DBE CONTRACT OBLIGATION: 9 % COST OF PLANS: $92.00

for constructing the Additional Lanes (Grade, Drainage, Pavement, Signing and Bridges) on I-10 from west of Carol Plantation Road (MP 14.655) to east of Halls Mill Creek (MP 18.486) in Mobile. Length 3.831 mi.

BRACKET ESTIMATE: $23,000,000 TO $28,000,000

VIEW ITEMS

Return To: Top of this Page


008 . STMOA-CN10(922) TUSCALOOSA COUNTY

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $44.00

for constructing the Drainage, Sidewalk, Pavement, Lighting and Signals on SR-215 (Greensboro Avenue) from Hargrove Road to 15th Street in Tuscaloosa. Length 0.512 mi.

BRACKET ESTIMATE: $3,305,000 TO $4,030,000

VIEW ITEMS

Return To: Top of this Page


010 . BR-0015(500) CHAMBERS COUNTY

LENGTH: 0.43 MILES. WORKING DAYS: 200
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $33.00

for constructing the Bridge Replacement and Approaches on SR-15 (US-29) at Osanippa Creek in Fairfax. Length 0.430 mi.

BRACKET ESTIMATE: $3,480,000 TO $4,250,000

VIEW ITEMS

Return To: Top of this Page


012 . BRF-0269(500) JEFFERSON COUNTY

LENGTH: 0.54 MILES. WORKING DAYS: 200
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $40.00

for constructing the Bridge Replacement and Approaches on SR-269 at the Birmingham Southern Railroad in Maytown. Length 0.543 mi.

BRACKET ESTIMATE: $2,975,000 TO $3,640,000

VIEW ITEMS

Return To: Top of this Page


015 . DE-AL71(928) BLOUNT COUNTY

WORKING DAYS: 75
COST OF PLANS: $10.00

for constructing the Downtown Streetscape (Resurfacing, Sidewalk and Lighting) on First Avenue West in Oneonta. Length 0.374 mi.

BRACKET ESTIMATE: $470,000 TO $570,000

VIEW ITEMS

Return To: Top of this Page


018 . ER-8910(951) COVINGTON & HOUSTON COUNTIES

WORKING DAYS: 55 COST OF PLANS: $ 9.00

for constructing the Bridge Scour Repair on SR-12 (US-84) at Five Run Branch west of Sanford and on SR-52 at the Chattahoochee River in Columbia.

BRACKET ESTIMATE: $139,500 TO $170,500

VIEW ITEMS

Return To: Top of this Page


022 . HPP-A136(900) JEFFERSON COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $15.00

for constructing the Pedestrian Improvements on SR-75 and on 23rd Avenue in Center Point at sites indicated by the plans.

BRACKET ESTIMATE: $254,000 TO $311,000

VIEW ITEMS

Return To: Top of this Page


023 . HSIP-0010(529) & 99-306-074-010-001 BUTLER COUNTY

LENGTH: 4.00 MILES. WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 from east of Bolling Street (MP 123.170) to west of SR-3 (US-31) (MP 125.168) in Greenville. Length 1.997 mi.

BRACKET ESTIMATE: $685,000 TO $825,000

VIEW ITEMS

Return To: Top of this Page


024 . HSIP-0134(503) & 99-307-341-134-001 HENRY COUNTY

WORKING DAYS: 60 COST OF PLANS: $14.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-134 from the Dale County line to SR-1 US-431) in Headland. Length 6.224 mi.

BRACKET ESTIMATE: $1,830,000 TO $2,200,000

VIEW ITEMS

Return To: Top of this Page


029 . STPAA-0195(502) WINSTON COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-195 from SR-243 (MP 35.720) to MP 40.142 east of Haleyville. Length 4.375 mi.

BRACKET ESTIMATE: $940,000 TO $1,150,000

VIEW ITEMS

Return To: Top of this Page


030 . EOAP-0010(528) CRENSHAW COUNTY

LENGTH: 1.95 MILES. WORKING DAYS: 30
COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 (US-29) from east of SR-9 (US-331) (MP 148.168) in Luverne to MP 150.120. Length 1.952 mi.

BRACKET ESTIMATE: $445,000 TO $545,000

VIEW ITEMS

Return To: Top of this Page


031 . STPAA-0017(509) LAUDERDALE COUNTY

LENGTH: 1.55 MILES. WORKING DAYS: 225
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $62.00

for constructing the Additional Lane on SR-17 (Helton Drive) from Hermitage Drive to Cox Creek Parkway SR-133) in Florence. Length 1.551 mi.

BRACKET ESTIMATE: $4,055,000 TO $4,950,000

VIEW ITEMS

Return To: Top of this Page


032 . STPAA-0069(534) CLARKE COUNTY

LENGTH: 0.17 MILES. WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Slide Repair on SR-69 from 0.8 miles north of Jackson Creek to Mays Crossroads southeast of Coffeeville. Length 0.170 mi.

BRACKET ESTIMATE: $230,000 TO $280,000

VIEW ITEMS

Return To: Top of this Page


035 . STPAA-HSIP-0087(508) COFFEE COUNTY

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Resurfacing and Traffic Stripe on SR-87 from the Geneva County line (MP 15.565) to SR-134 (MP 24.100). Length 8.535 mi.

BRACKET ESTIMATE: $2,415,000 TO $2,900,000

VIEW ITEMS

Return To: Top of this Page


036 . EOAP-HSIP-0141(502) CRENSHAW COUNTY

LENGTH: 3.17 MILES. WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-141 from the Coffee County line to SR-9 (US-331). Length 3.168 mi.

BRACKET ESTIMATE: $825,000 TO $1,010,000

VIEW ITEMS

Return To: Top of this Page


038 . STPOA-2624(201) ELMORE COUNTY

LENGTH: 3.78 MILES. WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Shoulder Paving and Traffic Stripe on CR-59 from 0.085 miles north of CR-8 to SR-14 east of Wetumpka. Length 3.780 mi.

BRACKET ESTIMATE: $148,000 TO $181,000

VIEW ITEMS

Return To: Top of this Page


041 . STPNU-0127(200) AUTAUGA COUNTY

LENGTH: 6.25 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-24 from CR-37 in Billingsley to CR-21. Length 6.245 mi.

BRACKET ESTIMATE: $580,000 TO $710,000

VIEW ITEMS

Return To: Top of this Page


045 . 99-305-632-215-001 TUSCALOOSA COUNTY

LENGTH: 2.00 MILES. WORKING DAYS: 35
COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-215 from Brookhill Road to SR-7 (US-11) in Cottondale. Length 2.000 mi.

BRACKET ESTIMATE: $935,000 TO $1,150,000

VIEW ITEMS

Return To: Top of this Page


046 . 99-302-302-013-101 FRANKLIN COUNTY

LENGTH: 0.47 MILES. WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on SR-13 from SR-237 in Phil Campbell to north of CR-81 Kent Street) (MP 283.017). Length 0.473 mi.

BRACKET ESTIMATE: $258,000 TO $316,000

VIEW ITEMS

Return To: Top of this Page


047 . 99-308-663-028-011 WILCOX COUNTY

LENGTH: 1.51 MILES. WORKING DAYS: 30
COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-28 from the SR-10 Bypass to SR-41 in Camden. Length 1.511 mi.

BRACKET ESTIMATE: $335,000 TO $410,000

VIEW ITEMS

Return To: Top of this Page