Office Engineer

Proposal Letting List
July 29, 2011 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


002 . IM-I065(424) , BUTLER 004 . APD-0355(506) , FRANKLIN
*006 . BRF-0269(503) , JEFFERSON *008 . HPP-0035(510) , MONTGOMERY
010 . BR-5202(201) , MORGAN 012 . BRZ-3800(209) , LAMAR
013 . BRZ-6400(210) , WALKER 015 . HRRR-3603(200) , JACKSON
017 . HSIP-0010(533) , CRENSHAW 018 . HSIP-0021(536) , COOSA
019 . HSIP-0039(501) , SUMTER 020 . HSIP-0095(501) , HOUSTON
021 . HSIP-0179(502) , ETOWAH, etc. 022 . HSIP-CN11(905) , MOBILE
023 . HSIP-CN11(909) , DEKALB 025 . NH-0013(574) , CLARKE
026 . NH-0001(560) , RUSSELL 027 . NH-0053(539) , DALE
028 . EB-0014(503) , ELMORE 029 . ACSTPAA-0055(506) , BUTLER
030 . STPAA-HSIP-0053(555) , HOUSTON 033 . STPNU-0715(200) , BUTLER
034 . STPNU-0715(201) , BUTLER 035 . EB-1004(201) , CHEROKEE
036 . STPNU-2000(212) , COVINGTON 037 . EB-2400(209) , DALLAS
038 . EB-3025(201) , FRANKLIN 039 . EB-3215(201) , GREENE
040 . EB-5307(200) , PERRY 041 . STPOA-7906(601) , ELMORE
044 . 99-306-261-021-101 , ELMORE 045 . 99-307-162-087-101 , COFFEE, etc.
046 . 99-307-203-009-101 , COVINGTON 047 . 99-307-234-053-101 , DALE
048 . 99-308-134-012-111 , CLARKE 049 . 99-309-273-113-107 , ESCAMBIA
050 . 99-309-183-003-106 , CONECUH 051 . 99-406-442-008-101 , MACON
*-WITHDRAWN FROM THE LETTING
002 . IM-I065(424) BUTLER COUNTY
LENGTH: 1.87 MILES. WORKING DAYS: 30
COST OF PLANS: $11.00

for constructing the Sanitary Sewer Lift Station and Force Main for the I-65 Rest Areas north of Greenville. Length 1.872 mi.

BRACKET ESTIMATE: $405,000 TO $495,000

VIEW ITEMS

Return To: Top of this Page


004 . APD-0355(506) FRANKLIN COUNTY
WORKING DAYS: 340
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $98.00

for constructing the Partial Grade and Drain and Base and Pavement on SR-24 (Corridor V) from SR-247 east of Red Bay to CR-21. Length 7.859 mi.

BRACKET ESTIMATE: $11,700,000 TO $14,000,000

VIEW ITEMS

Return To: Top of this Page


006 . BRF-0269(503) JEFFERSON COUNTY

WORKING DAYS: 300
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $32.00

for constructing the Bridge Replacement and Approaches on SR-269 at Short Creek in Birmingport. Length 0.387 mi.

BRACKET ESTIMATE: $3,800,000 TO $4,700,000

**WITHDRAWN FROM THE LETTING**

Return To: Top of this Page


008 . HPP-0035(510) , TRIMPF-0035(512) , HPP-0035(513) & HPP-TRIMPF-0035(521) MONTGOMERY COUNTY

SHALL BE COMPLETED BY: December 1, 2014
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $160

for constructing the Grade, Drainage, Partial Pavement and Bridges on the Montgomery Outer Loop from SR-110 to I-85. Length 5.500 km.

BRACKET ESTIMATE: $71,000,000 TO $86,300,000

**WITHDRAWN FROM THE LETTING**

Return To: Top of this Page


010 . BR-5202(201) MORGAN COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 7.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on CR-55 West at Mack Creek south of Hartselle. Length 0.103 mi.

BRACKET ESTIMATE: $255,000 TO $315,000

VIEW ITEMS

Return To: Top of this Page


012 . BRZ-3800(209) ,BRZ-3800(211) & BRZ-3800(210) LAMAR COUNTY

LENGTH: 0.30 MILES.

WORKING DAYS: 170
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $21.00

for constructing the Bridge Replacement (2-Precast & 1 Bridge Culvert) on CR-5 at Northington Branch, on Walnut Road at Mud Creek and on Iron Bridge Road at Yellow Creek. Length 0.293 mi.

BRACKET ESTIMATE: $720,000 TO $880,000

VIEW ITEMS

Return To: Top of this Page


013 . BRZ-6400(210) WALKER COUNTY

LENGTH: 0.24 MILES. WORKING DAYS: 145
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $17.00

for constructing the Bridge Replacement and Approaches on Ripley Cutoff Road at Lost Creek east of Carbon Hill. Length 0.236 mi.

BRACKET ESTIMATE: $1,020,000 TO $1,250,000

VIEW ITEMS

Return To: Top of this Page


015 . HRRR-3603(200) JACKSON COUNTY

LENGTH: 1.87 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Traffic Stripe, Pavement Markers and Guardrail on CR-77 from SR-79 to the Marshall County line. Length 1.872 mi.

BRACKET ESTIMATE: $42,000 TO $51,000

VIEW ITEMS

Return To: Top of this Page


017 . HSIP-0010(533) & 99-307-215-010-101 CRENSHAW COUNTY

LENGTH: 13.72 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 1 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 (US-29) from east of Luverne (MP 150.343) to the Pike County line. Length 6.862 mi.

BRACKET ESTIMATE: $1,690,000 TO $2,000,000

VIEW ITEMS

Return To: Top of this Page


018 . HSIP-0021(536) & 99-304-191-021-101 COOSA COUNTY

LENGTH: 6.52 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-21 (US-231) from 0.1 miles south of Smith Street in Rockford to 1.3 miles south of the Hatchett Creek bridge. Length 3.258 mi.

BRACKET ESTIMATE: $2,200,000 TO $2,700,000

VIEW ITEMS

Return To: Top of this Page


019 . HSIP-0039(501) & 99-308-601-039-103 SUMTER COUNTY

LENGTH: 10.38 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-39 from SR-7 (US-11) north of Livingston to the Factory creek bridge. Length 5.242 mi.

BRACKET ESTIMATE: $1,060,000 TO $1,295,000

VIEW ITEMS

Return To: Top of this Page


020 . HSIP-0095(501) & 99-307-351-095-101 HOUSTON COUNTY

LENGTH: 22.82 MILES.

WORKING DAYS: 135
COST OF PLANS: $18.00

for constructing the Resurfacing and Traffic Stripe on SR-95 from south of Boat Landing Road in Gordon to SR-52. Length 11.413 mi.

BRACKET ESTIMATE: $3,850,000 TO $4,710,000

VIEW ITEMS

Return To: Top of this Page


021 . HSIP-0179(502) , HSIP-0179(503) , 99-301-285-179-104 & 99-301-484-179-101 ETOWAH & MARSHALL COUNTIES

LENGTH: 20.86 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-179 from SR-74 (US-278) (MP 0.000) northwest of Attalla to SR-168 (MP 10.430) at Boaz. Length 9.558 mi.

BRACKET ESTIMATE: $2,440,000 TO $2,980,000

VIEW ITEMS

Return To: Top of this Page


022 . HSIP-CN11(905) & 99-309-491-665-105 MOBILE COUNTY

LENGTH: 25.62 MILES.

WORKING DAYS: 90
COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on I-65 east and west Service Roads from SR-42 (US-98) to SR-17 (US-45) and from SR-16 (US-90) to SR-17 (US-45) in Prichard. Length 12.812 mi.

BRACKET ESTIMATE: $2,600,000 TO $3,200,000

VIEW ITEMS

Return To: Top of this Page


023 . HSIP-CN11(909) DEKALB COUNTY

LENGTH: 0.25 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on Beason Gap Road from Dogwood Boulevard to CR-89 in Fort Payne. Length 0.253 mi.

BRACKET ESTIMATE: $37,500 TO $46,000

VIEW ITEMS

Return To: Top of this Page


025 . NH-0013(574) CLARKE COUNTY

LENGTH: 2.94 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from south of SR-154 in Thomasville to north of SR-5. Length 2.935 mi.

BRACKET ESTIMATE: $1,660,000 TO $2,020,000

VIEW ITEMS

Return To: Top of this Page


026 . NH-0001(560) RUSSELL COUNTY

LENGTH: 3.07 MILES.

WORKING DAYS: 180
COST OF PLANS: $15.00

for constructing the Roadway Lighting on SR-1 (US-431) from north of SR-8 (US-80) in Phenix City to the Lee County line. Length 3.068 mi.

BRACKET ESTIMATE: $195,000 TO $2,400,000

VIEW ITEMS

Return To: Top of this Page


027 . NH-0053(539) DALE COUNTY

WORKING DAYS: 75
COST OF PLANS: $ 7.00

for constructing the Guardrail and Bridge Rail Retrofit on SR-53 (US-231) at SR-134 and the Choctawhatchee River and Relief Bridges in Midland City.

BRACKET ESTIMATE: $390,000 TO $475,000

VIEW ITEMS

Return To: Top of this Page


028 . STPAA-0014(503) ELMORE COUNTY
WORKING DAYS: 240
DBE CONTRACT OBLIGATION: 11 % COST OF PLANS: $43.00

for constructing the Widening (Grade, Drainage and Pavement) on SR-14 from Callaway creek to the existing four lane west of Wetumpka. Length 1.667 mi.

BRACKET ESTIMATE: $5,300,000 TO $6,300,000

VIEW ITEMS

Return To: Top of this Page


029 . ACSTPAA-0055(506) BUTLER COUNTY

LENGTH: 4.60 MILES.

WORKING DAYS: 320
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $119

for constructing the Partial Grade and Drain, Base, Pavement and Signing on the relocated SR-55 from two miles south of Georgiana to the new location of SR-106. Length 4.982 mi.

BRACKET ESTIMATE: $6,900,000 TO $8,400,000

VIEW ITEMS

Return To: Top of this Page


030 . STPAA-HSIP-0053(555) HOUSTON COUNTY

LENGTH: 10.89 MILES.

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $16.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 from south of Hood Street in Cottonwood to Mimosa Drive in Dothan. Length 10.907 mi.

BRACKET ESTIMATE: $2,500,000 TO $3,100,000

VIEW ITEMS

Return To: Top of this Page


033 . STPNU-0715(200) BUTLER COUNTY

LENGTH: 3.14 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-42 from CR-71 west of Greenville to CR-54. Length 3.143 mi.

BRACKET ESTIMATE: $325,000 TO $395,000

VIEW ITEMS

Return To: Top of this Page


034 . STPNU-0715(201) BUTLER COUNTY

LENGTH: 4.31 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-54 from Dickens Field Road to CR-42 northwest of Greenville. Length 4.306 mi.

BRACKET ESTIMATE: $443,000 TO $541,000

VIEW ITEMS

Return To: Top of this Page


035 . EB-1004(201) & EB-1008(201) CHEROKEE COUNTY

LENGTH: 3.89 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on CR-19 from CR-24 through Pine Grove to CR-39 and on CR-45 from US-411 to CR-16 northwest of Forney. Length 3.899 mi.

BRACKET ESTIMATE: $751,000 TO $918,000

VIEW ITEMS

Return To: Top of this Page


036 . STPNU-2000(212) COVINGTON COUNTY

LENGTH: 4.30 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-27 from SR-15 (US-29) to CR-37 northeast of Gantt. Length 4.300 mi.

BRACKET ESTIMATE: $476,000 TO $581,000

VIEW ITEMS

Return To: Top of this Page


037 . EB-2400(209) DALLAS COUNTY

LENGTH: 3.85 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-30 from CR-55 to SR-41 in Sardis. Length 3.850 mi.

BRACKET ESTIMATE: $826,000 TO $1,010,000

VIEW ITEMS

Return To: Top of this Page


038 . EB-3025(201) ,STPNU-3025(200) & STPNU-3025(202) FRANKLIN COUNTY

LENGTH: 5.96 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on CR-48 at sites as indicated by the plans. Length 7.095 mi.

BRACKET ESTIMATE: $670,000 TO $820,000

VIEW ITEMS

Return To: Top of this Page


039 . EB-3215(201) GREENE COUNTY

LENGTH: 3.80 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-60 from CR-183 at Morrows Grove to CR-208 at Mantua. Length 3.800 mi.

BRACKET ESTIMATE: $700,000 TO $850,000

VIEW ITEMS

Return To: Top of this Page


040 . EB-5307(200) PERRY COUNTY

LENGTH: 4.90 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 4.00

for constructing the Full Depth Reclamation, Resurfacing and Traffic Stripe on CR-23 from SR-183 to CR-24 west of Marion. Length 4.900 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,321,000

VIEW ITEMS

Return To: Top of this Page


041 . STPOA-7906(601) ELMORE COUNTY

LENGTH: 4.39 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on Coosada Road from Main Street in Millbrook to Blackwell Drive. Length 4.391 mi.

BRACKET ESTIMATE: $523,000 TO $639,000

VIEW ITEMS

Return To: Top of this Page


044 . 99-306-261-021-101 ELMORE COUNTY

LENGTH: 4.27 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-21 (US-231) from the end of the 4-lane at Wallsboro to north of CR-667 (MP 171.637). Length 4.356 mi.

BRACKET ESTIMATE: $1,200,000 TO $1,300,000

VIEW ITEMS

Return To: Top of this Page


045 . 99-307-162-087-101 & 99-307-555-087-102 COFFEE & PIKE COUNTIES

LENGTH: 17.21 MILES.

WORKING DAYS: 60
COST OF PLANS: $23.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-87 from the north end of the Pea Creek bridge north of Elba to SR-167 south of Spring Hill. Length 17.199 mi.

BRACKET ESTIMATE: $2,685,000 TO $3,280,000

VIEW ITEMS

Return To: Top of this Page


046 . 99-307-203-009-101 COVINGTON COUNTY

LENGTH: 3.07 MILES.

WORKING DAYS: 30
COST OF PLANS: $10.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-9 (US-331) from the Florida state line to the end of curb section north of CR-8 in Florala. Length 3.065 mi.

BRACKET ESTIMATE: $863,000 TO $1,100,000

VIEW ITEMS

Return To: Top of this Page


047 . 99-307-234-053-101 DALE COUNTY
WORKING DAYS: 100
COST OF PLANS: $16.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from north of CR-2 (MP 50.769) to south of the Coffee county line (MP 56.923) west of Ariton. Length 6.154 mi.

BRACKET ESTIMATE: $2,950,000 TO $3,600,000

VIEW ITEMS

Return To: Top of this Page


048 . 99-308-134-012-111 CLARKE COUNTY

LENGTH: 6.15 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-12 (US-84) from CR-35 to the Monroe county line. Length 6.196 mi.

BRACKET ESTIMATE: $1,415,000 TO $1,700,000

VIEW ITEMS

Return To: Top of this Page


049 . 99-309-273-113-107 ESCAMBIA COUNTY

LENGTH: 0.79 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-113 from the Florida state line to US-31 in Flomaton. Length 0.790 mi.

BRACKET ESTIMATE: $256,000 TO $313,000

VIEW ITEMS

Return To: Top of this Page


050 . 99-309-183-003-106 CONECUH COUNTY

LENGTH: 2.97 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on US-31 from SR-12 (US-84) to Rural Street in Evergreen. Length 2.965 mi.

BRACKET ESTIMATE: $740,000 TO $904,000

VIEW ITEMS

Return To: Top of this Page


051 . 99-406-442-008-101 MACON COUNTY

LENGTH: 4.24 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-8 (US-80) from the Montgomery county line to east of CR-40 (MP 157.586) in Shorter. Length 4.240 mi.

BRACKET ESTIMATE: $588,000 TO $718,000

VIEW ITEMS

Return To: Top of this Page