Office Engineer

Proposal Letting List
June 24, 2011 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I065(409) , BUTLER, etc. 002 . BRF-0017(506) , WASHINGTON
007 . BR-0075(510) , BLOUNT 009 . ER-8910(955) , BULLOCK
012 . NH-0008(555) , LOWNDES 013 . NH-0013(571) , FRANKLIN
014 . NH-0035(520) , CHEROKEE 018 . STPAA-0017(542) , LAMAR
019 . STPAA-0042(514) , BALDWIN 020 . STPAA-0075(523) , DEKALB
021 . STPAA-0117(508) , JACKSON 023 . STPAA-HSIP-0022(514) , DALLAS
024 . STPAA-HSIP-0041(508) , WILCOX 025 . STPAA-HSIP-0053(555) , HOUSTON
026 . STPAA-HSIP-0106(502) , BUTLER 027 . STPAA-HSIP-0134(504) , DALE
030 . STPBH-7321(600) , JEFFERSON 032 . STPHV-8540(601) , MADISON
034 . STPOA-5015(201) , MONROE 035 . STPOA-7905(601) , ELMORE
037 . STPNU-0900(226) , CHAMBERS 038 . STPNU-3600(216) , JACKSON
039 . STPNU-4719(200) , MARION 040 . STPNU-5506(200) , PIKE
042 . 99-504-690-000-001 , CLEBURNE, etc.

001 . IM-I065(409) BUTLER & LOWNDES COUNTIES

SHALL BE COMPLETED BY: August 17, 2012
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing and Traffic Stripe on I-65 from south of the Lowndes county line (MP 139.365) to south of SR-97 (Exit 151) (MP 150.560) at Letohatchee. Length 11.194 mi.

BRACKET ESTIMATE: $10,950,000 TO $13,350,000

VIEW ITEMS


002 . BRF-0017(506) & NH-0017(521) WASHINGTON COUNTY

LENGTH: 1.37 MILES.

SHALL BE COMPLETED BY: November 1, 2012
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $57.00

for constructing the Bridge Replacement, Culvert Extensions and Approaches on SR-17 (US-45) at Long Branch and Flat Branch southeast of Deer Park. Length 1.363 mi.

BRACKET ESTIMATE: $6,000,000 TO $7,300,000

VIEW ITEMS


007 . BR-0075(510) BLOUNT COUNTY

LENGTH: 0.48 MILES.

WORKING DAYS: 310
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $30.00

for constructing the Bridge Replacement and Approaches on SR-75 at the Calvert Prong of the Little Warrior River north of Oneonta. length 0.477 mi.

BRACKET ESTIMATE: $3,835,000 TO $4,650,000

VIEW ITEMS


009 . ER-8910(955) & 99-906-062-223-001 BULLOCK COUNTY

LENGTH: 0.05 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 9.00

for constructing the Crossdrain Pipe Replacement (Grade, Drain and Pavement) on SR-197 0.03 miles north of Tye Avenue in Union Springs and on SR-223 0.9 miles south of CR-191. Length 0.103 mi.

BRACKET ESTIMATE: $480,000 TO $584,000

VIEW ITEMS


012 . NH-0008(555) LOWNDES COUNTY

LENGTH: 6.97 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-8 (US-80) from west of CR-23 (MP 106.100) to east of SR-97 (MP 113.070) in Lowndesboro. Length 6.969 mi.

BRACKET ESTIMATE: $3,900,000 TO $4,800,000

VIEW ITEMS


013 . NH-0013(571) FRANKLIN COUNTY

LENGTH: 2.72 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from south of CR-36 (MP 291.000) to north of the railroad overpass (MP 293.700) in Russellville. Length 2.723 mi.

BRACKET ESTIMATE: $1,455,000 TO $1,750,000

VIEW ITEMS


014 . NH-0035(520) CHEROKEE COUNTY

LENGTH: 6.67 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-35 from CR-41 near Watson's Crossroads to the Dekalb county line. Length 6.670 mi.

BRACKET ESTIMATE: $1,780,000 TO $2,170,000

VIEW ITEMS


018 . STPAA-0017(542) LAMAR COUNTY

LENGTH: 1.57 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-17 from MP 252.800 in Sulligent to the north city limits. Length 1.572 mi.

BRACKET ESTIMATE: $590,000 TO $715,000

VIEW ITEMS


019 . STPAA-0042(514) BALDWIN COUNTY

LENGTH: 10.17 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-42 (US-98) from east of Elberta (MP 70.496) to the Perdido Bay bridge (MP 80.669). Length 10.173 mi.

BRACKET ESTIMATE: $1,320,000 TO $1,600,000

VIEW ITEMS


020 . STPAA-0075(523) DEKALB COUNTY

LENGTH: 10.03 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-75 from north of SR-35 (MP 85.30) in Rainsville to south of SR-40 (MP 95.33). Length 10.030 mi.

BRACKET ESTIMATE: $2,355,000 TO $2,800,000

VIEW ITEMS


021 . STPAA-0117(508) JACKSON COUNTY

LENGTH: 1.27 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-117 from SR-2 (US-72) (MP 36.99) to south of the railroad tracks (MP 38.26) in Stevenson. Length 1.269 mi.

BRACKET ESTIMATE: $405,000 TO $490,000

VIEW ITEMS


023 . STPAA-HSIP-0022(514) DALLAS COUNTY

LENGTH: 4.31 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-22 from SR-219 to SR-8 in Selma. Length 4.305 mi.

BRACKET ESTIMATE: $970,0001 TO $1,180,000

VIEW ITEMS


024 . STPAA-HSIP-0041(508) WILCOX COUNTY

LENGTH: 7.91 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on SR-41 from SR-10 in Camden to the Dallas county line. Length 7.911 mi.

BRACKET ESTIMATE: $1,175,000 TO $1,435,000

VIEW ITEMS


025 . STPAA-HSIP-0053(555) HOUSTON COUNTY

LENGTH: 10.89 MILES.

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $16.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 from south of Hood Street in Cottonwood to Mimosa Drive in Dothan. Length 10.907 mi.

BRACKET ESTIMATE: $2,500,000 TO $3,100,000

VIEW ITEMS


026 . STPAA-HSIP-0106(502) BUTLER COUNTY

LENGTH: 3.42 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-106 from MP 11.403 in Georgiana to east of CR-27 (MP 14.827). Length 3.423 mi.

BRACKET ESTIMATE: $960,000 TO $1,180,000

VIEW ITEMS


027 . STPAA-HSIP-0134(504) DALE COUNTY

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-134 from CR-67 in Midland City to the Henry County line. Length 4.726 mi.

BRACKET ESTIMATE: $1,290,000 TO $1,580,000

VIEW ITEMS


030 . STPBH-7321(600) JEFFERSON COUNTY

WORKING DAYS: 330
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $42.00

for constructing the Extension of Chapel Lane (Grade, Drainage, Pavement and Bridge) at I-459 in Hoover. Length 0.524 mi.

BRACKET ESTIMATE: $7,685,000 TO $9,390,000

VIEW ITEMS


032 . STPHV-8540(601) MADISON COUNTY

LENGTH: 0.58 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for the Clearing and Grubbing and Structure Removal on Church Street from Pratt Avenue to Oakwood Avenue in Huntsville. Length 0.576 mi.

BRACKET ESTIMATE: $770,000 TO $925,000

VIEW ITEMS


034 . STPOA-5015(201) MONROE COUNTY

LENGTH: 0.09 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 8.00

for constructing the Culvert Replacement and Approaches on CR-23 at a tributary of Bear Creek in Frisco City. Length 0.085 mi.

BRACKET ESTIMATE: $410,000 TO $500,000

VIEW ITEMS


035 . STPOA-7905(601) ELMORE COUNTY

LENGTH: 3.15 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Coosada Parkway from Alabama River Parkway to Coosada Road in Coosada. Length 3.153 mi.

BRACKET ESTIMATE: $600,000 TO $730,000

VIEW ITEMS


037 . STPNU-0900(226) CHAMBERS COUNTY

LENGTH: 5.69 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Full Depth Reclamation, Resurfacing and Traffic Stripe on CR-28 from SR-1 (US-431) at Moorefield to CR-48 west of Lafayette. Length 5.689 mi.

BRACKET ESTIMATE: $675,000 TO $820,000

VIEW ITEMS


038 . STPNU-3600(216) JACKSON COUNTY

LENGTH: 4.01 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-33 from SR-79 north of Skyline to CR-39. Length 4.011 mi.

BRACKET ESTIMATE: $645,000 TO $790,000

VIEW ITEMS


039 . STPNU-4719(200) & STPNU-4703(200) MARION COUNTY

LENGTH: 3.92 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 9.00

for constructing the Resurfacing, Traffic Stripe, Culvert Extension and Guardrail on CR-48 and CR-28 at sites as indicated by the plans. Length 3.896 mi.

BRACKET ESTIMATE: $835,000 TO $1,020,000

VIEW ITEMS


040 . STPNU-5506(200) ,STPNU-5514(200) & STPNU-5500(213) PIKE COUNTY

LENGTH: 11.23 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing and Traffic Stripe on CR-2246, on CR-4409 and on CR-6628 at sites as indicated on the plans. Length 11.273 mi.

BRACKET ESTIMATE: $880,000 TO $1,100,000

VIEW ITEMS


042 . 99-504-690-000-001 CLEBURNE , TALLADEGA & COOSA COUNTIES

WORKING DAYS: 100
COST OF PLANS: $ 6.00

for the Bridge Coating on various bridges as indicated by the plans.

BRACKET ESTIMATE: $490,000 TO $600,000

VIEW ITEMS

Return To: Top of this Page