Office Engineer

Proposal Letting List
September 30, 2011 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I059(323) , DEKALB * 003 . IM-I065(408) , ELMORE, etc.
004 . IM-I065(414) , CONECUH 005 . IM-I085(324) , MACON, etc.
007 . IM-NHF-I020(327) , CALHOUN 008 . IM-NHF-I020(340) , CLEBURNE
010 . HPP-A146(901) , BIBB 012 . BR-7118(601) , SHELBY
013 . BR-8525(602) , MADISON 015 . ER-8910(949) , DALLAS
016 . ER-8910(960) , SUMTER 018 . HRRR-CN11(206) , LIMESTONE
020 . HSIP-0005(538) , JEFFERSON 022 . HSIP-0938(200) , CHAMBERS
023 . HSIP-2400(210) , DALLAS 024 . HSIP-3115(200) , GENEVA
025 . HSIP-3428(200) , HENRY 026 . HSIP-CN11(208) , ETOWAH
027 . HSIP-CN11(209) , LIMESTONE 028 . HSIP-CN11(210) , HOUSTON
029 . HSIP-CN11(212) , COFFEE 030 . HSIP-CN11(214) , DALE
034 . STPAA-HSIP-0016(509) , MOBILE 035 . STPAA-0263(502) , BUTLER, etc.*
036 . STPOA-2603(203) , ELMORE 037 . STPOA-4141(200) , LEE
039 . STPOA-3026(201) , FRANKLIN 040 . STPOA-3204(200) , GREENE
042 . STPOA-5618(201) , RANDOLPH 045 . STPPC-8040(601) , RUSSELL, etc.
046 . ST-008-021-006 , CALHOUN 048 . 99-304-621-063-102 , TALLAPOOSA
049 . 99-306-261-021-102 , ELMORE 050 . 99-307-351-053-101 , HOUSTON
051 . 99-507-346-000-101 , HENRY 052 . 99-508-690-000-121 , CHOCTAW, etc.
053 . 99-509-491-042-103 , MOBILE
* - WITHDRAWN FROM THE LETTING

001 . IM-I059(323) DEKALB COUNTY

LENGTH: 19.16 MILES.

SHALL BE COMPLETED BY: August 1, 2013
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $15.00

for constructing the Concrete Pavement Rehabilitation on I-59 from the Etowah County line (MP 198.686) to south of SR-35 (MP 217.850) in Fort Payne. Length 19.163 mi.

BRACKET ESTIMATE: $13,380,000 TO $16,350,000

**WITHDRAWN FROM THE LETTING**

Return To: Top of this Page


003 . IM-I065(408) ELMORE & AUTAUGA COUNTIES

LENGTH: 5.35 MILES.

SHALL BE COMPLETED BY: November 2, 2012
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $31.00

for constructing the Pavement Rehabilitation and Ramp Widening on I-65 from north of the Crescent Lake bridge (MP 177.115) to north of the Autauga County line (MP 182.472). Length 5.356 mi.

BRACKET ESTIMATE: $6,560,000 TO $8,000,000

VIEW ITEMS

Return To: Top of this Page


004 . IM-I065(414) CONECUH COUNTY

LENGTH: 12.31 MILES.

SHALL BE COMPLETED BY: August 1, 2013
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $93.00

for constructing the Planing, Resurfacing and Traffic Stripe on I-65 from Murder Creek through Evergreen to the Butler County line. Length 12.304 mi.

BRACKET ESTIMATE: $19,100,000 TO $23,300,000

VIEW ITEMS

Return To: Top of this Page


005 . IM-I085(324) MACON & LEE COUNTIES

LENGTH: 17.35 MILES.

SHALL BE COMPLETED BY: June 28, 2012
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Guardrail (Median Crossover Protection) on I-85 from 0.3 miles south of the Macon County line to the US-29 overpass. Length 11.846 mi.

BRACKET ESTIMATE: $1,330,000 TO $1,600,000

VIEW ITEMS

Return To: Top of this Page


007 . IM-NHF-I020(327) CALHOUN COUNTY

LENGTH: 7.98 MILES.

SHALL BE COMPLETED BY: September 1, 2013
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $141

for constructing the Pavement Rehabilitation and Additional Lanes (Grade, Drainage, Pavement and Bridge Widening) on I-20 from the Snow Creek bridge (MP 185.83) in Oxford to the Cleburne County line. Length 7.983 mi.

BRACKET ESTIMATE: $20,700,000 TO $25,300,000

VIEW ITEMS

Return To: Top of this Page


008 . IM-NHF-I020(340) CLEBURNE COUNTY

SHALL BE COMPLETED BY: September 1, 2013
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $91.00

for constructing the Additional Lanes (Rubblization, Grade, Drainage, Pavement and Bridge Widening) on I-20 from west of the Tallapoosa River east of Heflin to east of CR-49. Length 1.859 mi.

BRACKET ESTIMATE: $15,300,000 TO $18,700,000

VIEW ITEMS

Return To: Top of this Page


010 . HPP-A146(901) BIBB COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $39.00

for constructing the Safety Improvements (Planing, Resurfacing, Traffic Stripe and Traffic Signal) on SR-5 at the Industrial Park Road in Woodstock and at CR-24 in West Blockton. Length 0.700 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,300,000

VIEW ITEMS

Return To: Top of this Page


012 . BR-7118(601) SHELBY COUNTY

WORKING DAYS: 200
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $24.00

for constructing the Bridge Replacement and Approaches on CR-11 at Peavine Creek in Alabaster. Length 0.289 mi.

BRACKET ESTIMATE: $1,425,000 TO $1,740,000

VIEW ITEMS

Return To: Top of this Page


013 . BR-8525(602) MADISON COUNTY

LENGTH: 0.15 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $13.00

for constructing the Bridge Replacement and Approaches on Balch Road at Knox Creek west of Huntsville. Length 0.150 mi.

BRACKET ESTIMATE: $810,000 TO $985,000

VIEW ITEMS

Return To: Top of this Page


015 . ER-8910(949) DALLAS COUNTY

LENGTH: 0.08 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 9.00

for constructing the Slide Repair and Pipe Extension on CR-85 at sites as indicated by the plans. Length 0.085 mi.

BRACKET ESTIMATE: $298,000 TO $360,000

VIEW ITEMS

Return To: Top of this Page


016 . ER-8910(960) SUMTER COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 70
COST OF PLANS: $24.00

for constructing the Slide Corrections on SR-8 (US-80) from 0.1 miles west of SR-28 to the Tombigbee River at sites as indicated by the plans.

BRACKET ESTIMATE: $409,000 TO $500,000

VIEW ITEMS

Return To: Top of this Page


018 . HRRR-CN11(206) LIMESTONE COUNTY

LENGTH: 0.40 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 4.00

for constructing the Safety Improvements (Traffic Signals) on McCulley Mill Road at Capshaw Road and on Mooresville Road at Thach Road northeast of Athens. Length 0.398 mi.

BRACKET ESTIMATE: $30,000 TO $36,500

VIEW ITEMS

Return To: Top of this Page


020 . HSIP-0005(538) & 99-303-371-005-107 JEFFERSON COUNTY

WORKING DAYS: 45
COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-5 (US-78) from Finley Avenue to Cherry Avenue in Birmingham. Length 1.530 mi.

BRACKET ESTIMATE: $982,000 TO $1,200,000

VIEW ITEMS

Return To: Top of this Page


022 . HSIP-0938(200) CHAMBERS COUNTY

LENGTH: 0.03 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Guardrail Replacement on CR-186 at Fosters Branch bridge west of Valley. Length 0.032 mi.

BRACKET ESTIMATE: $21,000 TO $25,000

VIEW ITEMS

Return To: Top of this Page


023 . HSIP-2400(210) DALLAS COUNTY

LENGTH: 0.22 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Safety Improvements (Guardrail and End Anchors) on CR-3 at Tatum Creek bridge and at Chaney Creek bridge. Length 0.217 mi.

BRACKET ESTIMATE: $59,000 TO $72,000

VIEW ITEMS

Return To: Top of this Page


024 . HSIP-3115(200) GENEVA COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Guardrail End Anchors on CR-17 at the west end of the Pea River bridge southwest of Samson. Length 0.009 mi.

BRACKET ESTIMATE: $12,500 TO $15,000

VIEW ITEMS

Return To: Top of this Page


025 . HSIP-3428(200) HENRY COUNTY

LENGTH: 0.04 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for the Guardrail Installation on Main Street at White Branch in Headland. Length 0.039 mi.

BRACKET ESTIMATE: $26,000 TO $32,000

VIEW ITEMS

Return To: Top of this Page


026 . HSIP-CN11(208) ETOWAH COUNTY

LENGTH: 0.16 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Guardrail and End Anchor Replacement on Egypt Road at Line Creek, on Rocky Ford Road at Dry Creek and on Rocky Ford Road at a branch of Dry Creek. Length 0.086 mi.

BRACKET ESTIMATE: $41,000 TO $50,000

VIEW ITEMS

Return To: Top of this Page


027 . HSIP-CN11(209) LIMESTONE COUNTY

LENGTH: 0.12 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Bridge End Safety Improvements on Easter Ferry Road at Sulphur Creek and on Capshaw Road at Limestone Creek. Length 0.121 mi.

BRACKET ESTIMATE: $59,000 TO $73,000

VIEW ITEMS

Return To: Top of this Page


028 . HSIP-CN11(210) HOUSTON COUNTY

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Guardrail Installations on Nuclear Plant Road at Meadows Creek and on CR-33 at Breakfast Pond Branch east of Dothan. Length 0.053 mi.

BRACKET ESTIMATE: $27,000 TO $33,000

VIEW ITEMS

Return To: Top of this Page


029 . HSIP-CN11(212) COFFEE COUNTY

LENGTH: 0.08 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for the Guardrail Installations at bridge culverts on CR-105 and CR-723 at sites as indicated by the plans. Length 0.075 mi.

BRACKET ESTIMATE: $29,700 TO $36,000

VIEW ITEMS

Return To: Top of this Page


030 . HSIP-CN11(214) DALE COUNTY

LENGTH: 0.15 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for the Guardrail Installations at four sites on CR-14, CR-83 and CR-20 as indicated by the plans. Length 0.337 mi.

BRACKET ESTIMATE: $80,000 TO $100,000

VIEW ITEMS

Return To: Top of this Page


034 . STPAA-HSIP-0016(509) MOBILE COUNTY

LENGTH: 6.12 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-16 (US-90) from east of the Fowl River bridge (MP 13.176) to the Halls Mill Creek bridge south of Mobile. Length 5.800 mi.

BRACKET ESTIMATE: $2,485,000 TO $3,030,000

VIEW ITEMS

Return To: Top of this Page


035 . STPAA-0263(502) BUTLER & LOWNDES COUNTIES

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $19.00

for constructing the Slide Repair on SR-263 at four sites between Sherling and Braggs.

BRACKET ESTIMATE: $1,055,000 TO $1,285,000

**WITHDRAWN FROM THE LETTING**

036 . STPOA-2603(203) ELMORE COUNTY

LENGTH: 2.65 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Shoulder Paving and Traffic Stripe on Redland Road from Firetower Road to Marshell Road southeast of Wetumpka. Length 2.654 mi.

BRACKET ESTIMATE: $140,000 TO $171,000

VIEW ITEMS

Return To: Top of this Page


037 . STPOA-4141(200) LEE COUNTY

LENGTH: 2.16 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on Farmville Road (CR-72) from south of CR-84 to CR-82 in Auburn. Length 2.156 mi.

BRACKET ESTIMATE: $455,000 TO $550,000

VIEW ITEMS

Return To: Top of this Page


039 . STPOA-3026(201) & STPOA-3026(200) FRANKLIN COUNTY

LENGTH: 4.06 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-58 from CR-49 in Frankfort to Hovater Mill Road and from CR-73 to CR-65 (Waterloo Road). Length 4.064 mi.

BRACKET ESTIMATE: $337,000 TO $412,000

VIEW ITEMS

Return To: Top of this Page


040 . STPOA-3204(200) GREENE COUNTY

LENGTH: 7.40 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-131 from CR-20 to the Eutaw city limit. Length 7.399 mi.

BRACKET ESTIMATE: $1,280,000 TO $1,580,000

VIEW ITEMS

Return To: Top of this Page


042 . STPOA-5618(201) RANDOLPH COUNTY

LENGTH: 5.64 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-88 from the Clay County line to SR-1 (US-431). Length 5.636 mi.

BRACKET ESTIMATE: $645,000 TO $790,000

VIEW ITEMS

Return To: Top of this Page


045 . STPPC-8040(601) RUSSELL & LEE COUNTIES

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on Summerville Road from 13th Street to the Phenix City city limit. Length 3.901 mi.

BRACKET ESTIMATE: $1,400,000 TO $1,700,000

VIEW ITEMS

Return To: Top of this Page


046 . ST-008-021-006 CALHOUN COUNTY

LENGTH: 0.47 MILES.

WORKING DAYS: 140
COST OF PLANS: $36.00

for constructing the Access Management (Grade, Drainage and Pavement) on SR-21 from Plaza Lane to US-78 in Oxford. Length 0.468 mi.

BRACKET ESTIMATE: $1,600,000 TO $1,960,000

VIEW ITEMS

Return To: Top of this Page


048 . 99-304-621-063-102 TALLAPOOSA COUNTY

LENGTH: 2.72 MILES.

WORKING DAYS: 100
COST OF PLANS: $16.00

for constructing the Planing, Resurfacing, Traffic Stripe and Drainage Improvements on SR-22/SR-63 from SR-38/US-280 (MP 114.565) to MP 31.053 (SR-63) in Alexander City. Length 2.723 mi.

BRACKET ESTIMATE: $1,420,000 TO $1,700,000

VIEW ITEMS

Return To: Top of this Page


049 . 99-306-261-021-102 ELMORE COUNTY

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-21 (US-231) from SR-9 to the end of the 4-lane in Wallsboro. Length 2.850 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,840,000

VIEW ITEMS

Return To: Top of this Page


050 . 99-307-351-053-101 HOUSTON COUNTY

LENGTH: 2.29 MILES.

WORKING DAYS: 30
COST OF PLANS: $10.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 from Mimosa Drive to SR-1 (Business US-231/431) in Dothan. Length 2.190 mi.

BRACKET ESTIMATE: $535,000 TO $650,000

VIEW ITEMS

Return To: Top of this Page


051 . 99-507-346-000-101 HENRY COUNTY

WORKING DAYS: 120
COST OF PLANS: $13.00

for constructing the Pile Encasement and Riprap Placement on SR-10 at the East Fork of the Choctawhathee River, on SR-10 at Van Mill Creek and on SR-95 at Abbie Creek.

BRACKET ESTIMATE: $364,000 TO $445,000

VIEW ITEMS

Return To: Top of this Page


052 . 99-508-690-000-121 CHOCTAW , MONROE & CLARKE COUNTIES

LENGTH: 0.10 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for the Guardrail Installations at bridges on SR-17, SR-69 and SR-21 at sites as indicated by the plans.

BRACKET ESTIMATE: $140,000 TO $170,000

VIEW ITEMS

Return To: Top of this Page


053 . 99-509-491-042-103 & 99-509-491-610-102 MOBILE COUNTY

WORKING DAYS: 365
COST OF PLANS: $ 4.00

for the Tunnel Maintenance and Cleaning on SR-16 (US-90/US-98) at the Bankhead Tunnel and on I-10 at the George C. Wallace Tunnel in Mobile.

BRACKET ESTIMATE: $780,000 TO $955,000

VIEW ITEMS

Return To: Top of this Page