Proposal Letting List
August 31, 2012 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . NHF-0006(535) , AUTAUGA 002 . IM-I565(310) , LIMESTONE
003 . DE-I020(331) , ST. CLAIR 004 . IM-I065(436) , LOWNDES, etc.
005 . ACBRZ58314-ATRP(001) , BALDWIN 006 . ACNU58228-ATRP(001) , HENRY
007 . ACNU58333-ATRP(001) , AUTAUGA 008 . ACNU58344-ATRP(001) , ELMORE
009 . ACNU58408-ATRP(001) , COOSA 010 . ACNU58539-ATRP(001) , HOUSTON
011 . ACNU58543-ATRP(001) , COVINGTON 012 . IM-I085(342) , MACON
016 . BR-0213(501) , MOBILE 017 . BRZ-3900(205) , LAUDERDALE
018 . BRZ-6500(208) , WASHINGTON 023 . EB-0016(510) , MOBILE
030 . FBD-CN12(904) , BALDWIN 035 . NH-HSIP-0013(582) , MARENGO
036 . NH-HSIP-0067(505) , MORGAN 040 . SRTS-SR09(903) , JEFFERSON
042 . SRTS-SR11(911) , LAUDERDALE 045 . STPAA-0015(521) , CHAMBERS
046 . EB-0042(523) , BALDWIN 047 . STPAA-HSIP-0025(533) , ST. CLAIR
050 . STPNU-2412(200) , DALLAS 053 . STPOA-5307(201) , PERRY
054 . STPOA-5709(200) , RUSSELL 061 . STPOA-7902(601) , MONTGOMERY
065 . 99-301-285-291-303 , ETOWAH 067 . 99-508-690-000-221 , MARENGO
201 . 99-508-690-000-203 , SUMTER

001 . NHF-0006(535) AUTAUGA COUNTY

LENGTH: 2.40 MILES.

WORKING DAYS: 175
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $60.00

for constructing the Additional Lanes (Grade, Drainage, Pavement, Signals and Signing) on SR-6 (US-82) from near SR-206 to SR-14 in Prattville. Length 2.407 mi.

BRACKET ESTIMATE: $4,790,000 TO $5,800,000

VIEW ITEMS


002 . IM-I565(310) LIMESTONE COUNTY

LENGTH: 5.23 MILES.

SHALL BE COMPLETED BY: November 15, 2012
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Micro-Milling, Resurfacing and Traffic Stripe on I-565 from MP 5.13 to MP 7.025 in Huntsville. Length 5.226 mi.

BRACKET ESTIMATE: $1,040,000 TO $1,280,000

VIEW ITEMS


003 . DE-I020(331) ST. CLAIR COUNTY

LENGTH: 2.57 MILES.

SHALL BE COMPLETED BY: April 19, 2013
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $21.00

for constructing the Outside Slope Safety Improvements along I-20 from east of SR-25 (MP 145.230) in Leeds to west of Kelly Creek (MP 147.800). Length 2.569 mi.

BRACKET ESTIMATE: $800,000 TO $975,000

VIEW ITEMS


004 . IM-I065(436) LOWNDES & BUTLER COUNTIES

LENGTH: 52.48 MILES.

SHALL BE COMPLETED BY: November 15, 2012
COST OF PLANS: $ 3.00

for constructing the Micro-Milling, Resurfacing and Traffic Stripe on I-65 from the Conecuh county line to the Montgomery county line at various locations as indicated by the plans. Length 53.130 mi.

BRACKET ESTIMATE: $283,000 TO $345,000

VIEW ITEMS


005 . ACBRZ58314-ATRP(001) BALDWIN COUNTY

LENGTH: 0.41 MILES.

WORKING DAYS: 190
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $15.00

for constructing the Bridge Replacement and Approaches on CR-134 (Truck Route 17) at Hollinger Creek southeast of Gateswood. Length 0.406 mi.

BRACKET ESTIMATE: $1,660,000 TO $2,000,000

VIEW ITEMS


006 . ACNU58228-ATRP(001) HENRY COUNTY

LENGTH: 7.24 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-65 from SR-95 to SR-10 in Shorterville. Length 7.239 mi.

BRACKET ESTIMATE: $905,000 TO $1,100,000

VIEW ITEMS


007 . ACNU58333-ATRP(001) AUTAUGA COUNTY

LENGTH: 14.12 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-1 from SR-14 near Burnsville to SR-6 (US-82) near Billingsley. Length 14.116 mi.

BRACKET ESTIMATE: $1,740,000 TO $2,130,000

VIEW ITEMS


008 . ACNU58344-ATRP(001) ELMORE COUNTY

LENGTH: 4.88 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-407 (East Cotton Road) from SR-63 north of Eclectic to SR-229. Length 4.888 mi.

BRACKET ESTIMATE: $585,000 TO $700,000

VIEW ITEMS


009 . ACNU58408-ATRP(001) COOSA COUNTY

LENGTH: 3.70 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-55 from Clay Creek to 3.4 miles southwest of Unity. Length 3.699 mi.

BRACKET ESTIMATE: $364,000 TO $445,000

VIEW ITEMS


010 . ACNU58539-ATRP(001) HOUSTON COUNTY

LENGTH: 11.84 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-69 and CR-77 (South Rocky Creek Road) from Hickory Grove Road to US-84 East in Ashford. Length 11.841 Mi.

BRACKET ESTIMATE: $1,670,000 TO $2,000,000

VIEW ITEMS


011 . ACNU58543-ATRP(001) COVINGTON COUNTY

LENGTH: 7.52 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-70 from CR-49 to CR-77 northeast of Andalusia. Length 7.519 mi.

BRACKET ESTIMATE: $850,000 TO $1,040,000

VIEW ITEMS


012 . IM-I085(342) MACON COUNTY

LENGTH: 27.82 MILES.

SHALL BE COMPLETED BY: November 15, 2012
COST OF PLANS: $ 3.00

for constructing the Micro-Milling, Resurfacing and Traffic Stripe at locations on I-85 from the Montgomery County line to the Macon County line. Length 28.547 mi.

BRACKET ESTIMATE: $405,000 TO $495,000

VIEW ITEMS


016 . BR-0213(501) MOBILE COUNTY

LENGTH: 0.04 MILES.

WORKING DAYS: 110
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $16.00

for constructing the Bridge Replacement and Approaches on SR-213 at Norton Creek in Saraland. Length 0.056 mi.

BRACKET ESTIMATE: $810,000 TO $990,000

VIEW ITEMS


017 . BRZ-3900(205) LAUDERDALE COUNTY

LENGTH: 0.29 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Bridge Replacements (2 Bridge Culverts) and Approaches on CR-133 at Brush Creek north of Wright and on CR-49 at the East Fork of Anderson Creek in Anderson. Length 0.156 mi.

BRACKET ESTIMATE: $540,000 TO $660,000

VIEW ITEMS


018 . BRZ-6500(208) WASHINGTON COUNTY

LENGTH: 0.04 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Bridge Replacement on CR-9 over Little Creek northwest of Citronelle. Length 0.035 mi.

BRACKET ESTIMATE: $550,000 TO $672,000

VIEW ITEMS


023 . EB-0016(510) & EB-0042(520) MOBILE COUNTY

LENGTH: 2.95 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-16 (US-90) from SR-163 to Broad Street and on SR-42 (US-98) from Broad Street to the Bankhead Tunnel in Mobile. Length 2.949 mi.

BRACKET ESTIMATE: $945,000 TO $1,155,000

VIEW ITEMS


030 . FBD-CN12(904) BALDWIN COUNTY
WORKING DAYS: 60
COST OF PLANS: $ 5.00

for constructing the Docking Facility Improvements (Lighting and Sidewalk) at the Fort Morgan Ferry Dock at Mobile Point.

BRACKET ESTIMATE: $150,000 TO $180,000

VIEW ITEMS


035 . NH-HSIP-0013(582) MARENGO COUNTY

LENGTH: 2.87 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from 1.43 miles north of CR-33 (MP 115.290) to north of SR-69 (MP 118.159) in Linden. Length 2.869 mi.

BRACKET ESTIMATE: $540,000 TO $660,000

VIEW ITEMS


036 . NH-HSIP-0067(505) MORGAN COUNTY

LENGTH: 3.39 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, Traffic Stripe and Bridge Rail Retrofit on SR-67 from north of CR-161 (Indian Hills Road) (MP 35.570) to SR-3 (US-31) in Decatur. Length 3.385 mi.

BRACKET ESTIMATE: $1,500,000 TO $1,800,000

VIEW ITEMS


040 . SRTS-SR09(903) & SRTS-SR09(904) JEFFERSON COUNTY
WORKING DAYS: 130
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $24.00

for constructing the Sidewalks and Landscaping along various streets at the Mountain Brook and Crestline Elementary Schools in Mountain Brook.

BRACKET ESTIMATE: $640,000 TO $780,000

VIEW ITEMS


042 . SRTS-SR11(911) LAUDERDALE COUNTY
WORKING DAYS: 40
COST OF PLANS: $ 8.00

for constructing the Sidewalk Improvements along Bridge Road, Stutts Avenue and J.C. Mauldin Highway (Old US-72) in Killen at sites as indicated by the plans. Length 0.226 mi.

BRACKET ESTIMATE: $83,000 TO $101,000

VIEW ITEMS


045 . STPAA-0015(521) CHAMBERS COUNTY

LENGTH: 6.93 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-15 (US-29) from CR-88 (Fairfax Bypass) to the Georgia State Line. Length 6.933 mi.

BRACKET ESTIMATE: $1,980,000 TO $2,420,000

VIEW ITEMS


046 . EB-0042(523) BALDWIN COUNTY

LENGTH: 0.98 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-42 (US-98) from SR-16 (US-90) to I-10 in Spanish Fort. Length 0.981 mi.

BRACKET ESTIMATE: $535,000 TO $655,000

VIEW ITEMS


047 . STPAA-HSIP-0025(533) ST. CLAIR COUNTY

LENGTH: 9.56 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-25 (US-411) from north of CR-10 (MP 174.330) through Branchville to CR-272 (Maddox Farm Road). Length 9.560 mi.

BRACKET ESTIMATE: $2,570,000 TO $3,140,000

VIEW ITEMS


050 . STPNU-2412(200) DALLAS COUNTY

LENGTH: 0.72 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Full Depth Reclamation, Resurfacing and Traffic Stripe on CR-45 north of Hazen from approximately 1.50 miles north of CR-188 to south of CR-189. Length 0.716 mi.

BRACKET ESTIMATE: $350,000 TO $428,000

VIEW ITEMS


053 . STPOA-5307(201) PERRY COUNTY

LENGTH: 3.70 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-24 from CR-23 to SR-14 west of Marion. Length 3.699 mi.

BRACKET ESTIMATE: $640,000 TO $783,000

VIEW ITEMS


054 . STPOA-5709(200) RUSSELL COUNTY

LENGTH: 3.95 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-18 (Oswichee Road) from CR-43 to CR-39 southeast of Seale. Length 3.945 mi.

BRACKET ESTIMATE: $645,000 TO $789,000

VIEW ITEMS


061 . STPOA-7902(601) MONTGOMERY COUNTY

LENGTH: 4.53 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-83 (Wallahatchie Road) from CR-85 (Pike Road) to SR-110 (Vaughn Road) in Montgomery. Length 4.533 mi.

BRACKET ESTIMATE: $590,000 TO $700,000

VIEW ITEMS


065 . 99-301-285-291-303 ETOWAH COUNTY

LENGTH: 0.90 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-291 from SR-759 to SR-1 (US-431) in Gadsden. Length 0.900 mi.

BRACKET ESTIMATE: $448,000 TO $548,000

VIEW ITEMS


067 . 99-508-690-000-221 MARENGO COUNTY

LENGTH: 0.20 MILES.

WORKING DAYS: 60
COST OF PLANS: $13.00

for constructing the Guardrail End Anchors at two bridges on SR-28 at sites as indicated by the plans.

BRACKET ESTIMATE: $255,000 TO $310,000

VIEW ITEMS


201 . 99-508-690-000-223 SUMTER COUNTY

LENGTH: 0.02 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 6.00

for Coating Existing Bridges at four sites on SR-7 (US-11) and SR-17 at sites as indicated by the plans.

BRACKET ESTIMATE: $195,000 TO $240,000

VIEW ITEMS


Return To: Top of this Page