Alabama Department of Transportation
Proposal Letting List
January 27, 2012 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


005 . BRF-0074(526) , CALHOUN 008 . NHF-0004(522) , MARION
009 . NHF-0004(528) , MARION 012 . DE-STPNU-A106(924) , WILCOX
014 . HRRR-CN12(208) , RUSSELL 016 . HSIP-0800(218) , CALHOUN
017 . HSIP-0077(514) , TALLADEGA 019 . NH-0001(567) , MARSHALL
020 . NH-0002(553) , JACKSON 021 . NH-STPAA-0003(568) , BALDWIN
022 . NH-0013(577) , WASHINGTON 023 . NH-0077(515) , TALLADEGA
024 . NH-HSIP-0005(539) , DALLAS 025 . NH-HSIP-0013(578) , WASHINGTON
026 . NH-HSIP-0053(561) , MONTGOMERY 027 . NH-HSIP-0267(500) , LEE
029 . SRTS-SR11(913) , COLBERT 033 . STPAA-0017(543) , MOBILE
034 . STPAA-HSIP-0053(564) , BLOUNT 035 . STPAA-HSIP-0053(566) , ST. CLAIR
036 . STPAA-0059(507) , BALDWIN 037 . STPAA-HSIP-0069(538) , WALKER
038 . STPAA-0069(539) , WALKER 041 . STPNU-1600(225) , COFFEE
042 . STPNU-3421(201) , HENRY 045 . STPOA-2613(200) , ELMORE
046 . STPOA-6021(200) , SUMTER 048 . 99-302-402-024-109 , LAWRENCE
049 . 99-304-615-004-102 , TALLADEGA

005 . BRF-0074(526) CALHOUN COUNTY
WORKING DAYS: 300
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $86.00

for constructing the Bridge Replacements and Approaches (Grade, Drainage and Pavement) on SR-74 (US-278) from Nances Creek Industrial Boulevard in Piedmont to near the Cherokee County line. Length 2.132 mi.

BRACKET ESTIMATE: $7,590,000 TO $9,280,000

VIEW ITEMS


008 . NHF-0004(522) MARION COUNTY
WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $22.00

for constructing the Slide Corrections on SR-4 (Corridor X) from west of SR-171 (MP 15.900) to SR-44 at various sites as indicated by the plans.

BRACKET ESTIMATE: $1,200,000 TO $1,500,000

VIEW ITEMS


009 . NHF-0004(528) MARION COUNTY

LENGTH: 3.66 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-4 (Corridor X) from the east end of the SR-44 bridge east of Twin to the west end of the SR-129 bridge. Length 3.662 mi.

BRACKET ESTIMATE: $1,800,000 TO $2,200,000

VIEW ITEMS


012 . DE-STPNU-A106(924) WILCOX COUNTY

LENGTH: 0.19 MILES.

WORKING DAYS: 75
COST OF PLANS: $10.00

for constructing the Grade, Drainage and Pavement on the Wilcox County Industrial Access Road off of SR-28 north of Camden. Length 0.187 mi.

BRACKET ESTIMATE: $280,000 TO $340,000

VIEW ITEMS


014 . HRRR-CN12(208) RUSSELL COUNTY

LENGTH: 20.77 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for the Traffic Striping, Markings, Legends and Pavement Markers on CR-9, CR-43, CR-24, CR-137 and CR-65 at sites as indicated by the plans. Length 20.774 mi.

BRACKET ESTIMATE: $145,000 TO $175,000

VIEW ITEMS


016 . HSIP-0800(218) CALHOUN COUNTY

LENGTH: 0.14 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Guardrail and Guardrail End Anchors on Warrior Road at Ohatchee Creek east of Ohatchee. Length 0.079 mi.

BRACKET ESTIMATE: $40,500 TO $49,500

VIEW ITEMS


017 . HSIP-0077(514) & 99-304-615-077-103 TALLADEGA COUNTY

LENGTH: 12.20 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-77 from the Clay County line to SR-21 in Talladega. Length 6.098 mi.

BRACKET ESTIMATE: $1,800,000 TO $2,200,000

VIEW ITEMS


019 . NH-0001(567) MARSHALL COUNTY

LENGTH: 6.96 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from the Etowah County line to Miller Street in Albertville. Length 6.960 mi.

BRACKET ESTIMATE: $3,245,000 TO $3,965,000

VIEW ITEMS


020 . NH-0002(553) JACKSON COUNTY

LENGTH: 7.54 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-2 (US-72) from 0.44 miles west of SR-35 through Hollywood to CR-113. Length 7.539 mi.

BRACKET ESTIMATE: $4,430,000 TO $5,400,000

VIEW ITEMS


021 . NH-STPAA-0003(568) BALDWIN COUNTY

LENGTH: 3.27 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from the Bay Minette south city limit (MP 17.491) to south of the town square (MP 20.941). Length 3.274 mi.

BRACKET ESTIMATE: $990,000 TO $1,210,000

VIEW ITEMS


022 . NH-0013(577) WASHINGTON COUNTY

LENGTH: 2.94 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from Bilbo Creek to 0.4 miles north of the McIntosh city limits. Length 2.937 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,200,000

VIEW ITEMS


023 . NH-0077(515) TALLADEGA COUNTY
WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-77 from SR-21 in Talladega to 0.2 miles south of SR-275 (MP 66.034). Length 1.548 mi.

BRACKET ESTIMATE: $397,000 TO $486,000

VIEW ITEMS


024 . NH-HSIP-0005(539) DALLAS COUNTY

LENGTH: 10.35 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-5 from the Wilcox County line (MP 32.626) to north of CR-21 (MP 42.978). Length 10.351 mi.

BRACKET ESTIMATE: $3,870,000 TO $4,700,000

VIEW ITEMS


025 . NH-HSIP-0013(578) WASHINGTON COUNTY

LENGTH: 5.69 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-13 (US-43) from the Mobile County line (MP 30.146) to MP 35.833 south of McIntosh. Length 5.686 mi.

BRACKET ESTIMATE: $1,835,000 TO $2,240,000

VIEW ITEMS


026 . NH-HSIP-0053(561) MONTGOMERY COUNTY

LENGTH: 7.65 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Temporary Traffic Stripe on SR-53 (US-231) from the Pike County line (MP 88.705) to north of CR-89 (MP 96.360) at Pine Level. Length 7.654 mi.

BRACKET ESTIMATE: $5,070,000 TO $6,200,000

VIEW ITEMS


027 . NH-HSIP-0267(500) LEE COUNTY

LENGTH: 5.06 MILES.

WORKING DAYS: 95
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-267 from SR-147 south in Auburn to SR-147 north. Length 5.055 mi.

BRACKET ESTIMATE: $1,700,000 TO $2,100,000

VIEW ITEMS


029 . SRTS-SR11(913) COLBERT COUNTY
WORKING DAYS: 60
COST OF PLANS: $ 3.00

for constructing the Safe Routes to School (Traffic Control Markings and Signing) in Muscle Shoals at various sites as indicated by the plans.

BRACKET ESTIMATE: $54,000 TO $66,000

VIEW ITEMS


033 . STPAA-0017(543) MOBILE COUNTY

LENGTH: 4.00 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-17 (US-45) from SR-42 (US-98) to I-65 in Prichard. Length 3.999 mi.

BRACKET ESTIMATE: $760,000 TO $930,000

VIEW ITEMS


034 . STPAA-HSIP-0053(564) BLOUNT COUNTY
WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from the St. Clair county line to SR-75 in Oneonta. Length 8.350 mi.

BRACKET ESTIMATE: $1,600,000 TO $1,970,000

VIEW ITEMS


035 . STPAA-HSIP-0053(566) ST. CLAIR COUNTY
WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) from north of CR-217 (Popes Chapel Road) (MP 228.200) to Industrial Drive in Ashville. Length 9.700 mi.

BRACKET ESTIMATE: $1,670,000 TO $2,040,000

VIEW ITEMS


036 . STPAA-0059(507) BALDWIN COUNTY

LENGTH: 9.15 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Temporary Traffic Stripe on SR-59 from SR-287 in Bay Minette to CR-21 (Bryant Landing Road) in Stockton. Length 9.147 mi.

BRACKET ESTIMATE: $1,995,000 TO $2,400,000

VIEW ITEMS


037 . STPAA-HSIP-0069(538) WALKER COUNTY

LENGTH: 1.33 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-69 (old US-78) from Elliot Blvd. to SR-5 northwest of Jasper. Length 1.325 mi.

BRACKET ESTIMATE: $790,000 TO $970,000

VIEW ITEMS


038 . STPAA-0069(539) WALKER COUNTY

LENGTH: 10.32 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-69 from SR-5 east of Jasper to south of CR-43 (Smith Lake Dam Road) (MP 217.700). Length 10.315 mi.

BRACKET ESTIMATE: $1,600,000 TO $1,970,000

VIEW ITEMS


041 . STPNU-1600(225) COFFEE COUNTY

LENGTH: 4.37 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-223 from SR-167 to SR-125 in Victoria. Length 4.366 mi.

BRACKET ESTIMATE: $609,000 TO $744,000

VIEW ITEMS


042 . STPNU-3421(201) HENRY COUNTY

LENGTH: 4.80 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-97 from Hardridge Creek to approximately 0.066 miles south of CR-221 northeast of Abbeville. Length 4.803 mi.

BRACKET ESTIMATE: $696,000 TO $850,000

VIEW ITEMS


045 . STPOA-2613(200) ELMORE COUNTY

LENGTH: 2.82 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-49 (Balm Road) from SR-9 northeast of Wetumpka to Mount Zion Road. Length 2.818 mi.

BRACKET ESTIMATE: $355,000 TO $435,000

VIEW ITEMS


046 . STPOA-6021(200) SUMTER COUNTY

LENGTH: 4.50 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 5.00

for constructing the Full Depth Reclamation, Resurfacing and Traffic Stripe on CR-85 from CR-35 to CR-34 at Warsaw. Length 4.500 mi.

BRACKET ESTIMATE: $985,000 TO $1,200,000

VIEW ITEMS


048 . 99-302-402-024-109 LAWRENCE COUNTY

LENGTH: 4.66 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-24 (Eastbound Lanes Only) from 0.4 miles east of CR-320 (MP 59.000) to the Morgan County line. Length 4.659 mi.

BRACKET ESTIMATE: $981,000 TO $1,200,000

VIEW ITEMS


049 . 99-304-615-004-102 TALLADEGA COUNTY

LENGTH: 1.82 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-4 (US-78) from the Coosa River bridge to MP 140.513 west of Lincoln. Length 1.819 mi.

BRACKET ESTIMATE: $567,000 TO $693,000

VIEW ITEMS


Return To: Top of this Page