051 . STPOA-1904(200) , COOSA

COUNTY: COOSA

WORKING DAYS: 30

for constructing the Resurfacing and Traffic Stripe on CR-18 from Spring Street in Rockford to CR-40. Length 2.499 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $335,000 TO $400,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
401B108 29334 SQYD Bituminous Treatment G (W/Polymer)
405A000 1180 GAL Tack Coat
407B000 3 MILE Joint Sealant For Hot Mix Asphalt Pave
424A346 300 TON Superpave Wrg Surf Lev 1/2" ESAL A/B
424A347 2642 TON Superpave Wrg Surf Lev 3/4" ESAL A/B
424B640 400 TON Superpave Upr Bndr Pat 1" Esal A/B
430B043 825 TON Agg Surf (1" Down, Crusher Run)
600A000 1 LS Mobilization
698A000 1 LS Construction Fuel (Maximum Bid Limited 17,360.00)
701A231 5 MILE Solid White Cl 2 Ty A Traf Str
701A235 4 MILE Solid Yellow Cl 2 Ty A Traf Str
701A245 1 MILE Broken Yellow Cl 2 Ty A Traf Str
701C000 2 MILE Broken Temporary Traffic Stripe
701C001 8 MILE Solid Temporary Traffic Stripe
703A002 40 SQFT Traffic Control Marking, Class 2, Type A
705A032 63 EACH Pavement Markers, Class A-H, Type 1-B
705A037 205 EACH Pavement Markers, Class A-H, Type 2-D
740B000 177 SQFT Construction Signs
740O000 1 EACH Pilot Car