March 02, 2012 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail the Web Page Editor with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I020(342) , JEFFERSON 005 . BRF-0269(503) , JEFFERSON
*007 . NHF-0004(532) , MARION 012 . DE-APL-STPAA-A165(925) , MACON
014 . EB-4020(201) , LAWRENCE 016 . ERPR-8930(922) , CONECUH
018 . STPPC-5706(200) , RUSSELL 020 . NH-0012(550) , HOUSTON
022 . NH-0013(579) , COLBERT 024 . SRTS-SR10(903) , BALDWIN
025 . SRTS-SR10(908) , BALDWIN 027 . SRTS-SR11(900) , BALDWIN
028 . SRTS-SR11(903) , BALDWIN *029 . SRTS-SR11(907) , WILCOX
032 . SRTS-SR11(914) , COFFEE 034 . SRTS-SR11(916) , COVINGTON
035 . SRTS-SR12(901) , COLBERT 036 . SRTS-SR12(921) , LEE
038 . STPAA-0003(548) , JEFFERSON 040 . STPAA-0010(534) , MARENGO
042 . STPAA-0016(511) , MOBILE 043 . STPAA-0017(544) , WASHINGTON
045 . STPAA-0055(509) , COVINGTON 047 . STPAA-0118(509) , WALKER
*048 . STPAA-0139(503) , BIBB 049 . STPAA-0243(500) , WINSTON
051 . STPAA-HSIP-0005(541) , JEFFERSON 052 . STPAA-HSIP-0138(500) , MACON
054 . STPAA-HSIP-0010(535) , BARBOUR 055 . STPBH-CN12(902) , SHELBY
057 . STPNU-1203(201) , CHOCTAW 058 . STPNU-2123(201) , CRENSHAW
059 . STPNU-4316(201) , LOWNDES 060 . STPNU-5670(200) , RANDOLPH
061 . STPNU-CN11(201) , LAUDERDALE 063 . STPOA-1404(201) , CLAY
064 . STPOA-1717(201) , COLBERT 065 . STPOA-4817(200) , MARSHALL
068 . TCSP-06AL(001) , MARION 070 . 99-403-371-000-203 , JEFFERSON
071 . 99-403-595-000-202 , SHELBY 072 . 99-403-692-000-201 , ST. CLAIR, etc.

**WITHDRAWN FROM THE LETTING


001 . IM-I020(342) JEFFERSON COUNTY
SHALL BE COMPLETED BY: November 1, 2012
DBE CONTRACT OBLIGATION: 1 % COST OF PLANS: $ 8.00

for constructing the Interstate Median Crossover Protection on I-20/ I-59 from I-459 to CR-56 (Valley Road) southwest of Fairfield. Length 10.869 mi.

BRACKET ESTIMATE: $1,560,000 TO $1,900,000

VIEW ITEMS


005 . BRF-0269(503) JEFFERSON COUNTY

LENGTH: 0.39 MILES.

WORKING DAYS: 300
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $32.00

for constructing the Bridge Replacement and Approaches on SR-269 at Short Creek in Birmingport. Length 0.387 mi.

BRACKET ESTIMATE: $3,800,000 TO $4,700,000

VIEW ITEMS


007 . NHF-0004(532) MARION COUNTY

LENGTH: 3.74 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-4 (Corridor X) from the bridge over CR-45 (MP 22.500) at Twin to the bridge over SR-44 (MP 26.240). Length 3.739 mi.

BRACKET ESTIMATE: $2,080,000 TO $2,540,000

**WITHDRAWN FROM THE LETTING**

012 . DE-APL-STPAA-A165(925) MACON COUNTY
WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $19.00

for constructing the Drainage Improvements in the city of Tuskegee at sites as indicated by the plans.

BRACKET ESTIMATE: $1,170,000 TO $1,430,000

VIEW ITEMS


014 . EB-4020(201) LAWRENCE COUNTY

LENGTH: 4.29 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing, Traffic Stripe and Signing on CR-81, CR-207 and CR-203 from SR-157 to CR-87 at Five Points. Length 4.285 mi.

BRACKET ESTIMATE: $340,000 TO $415,000

VIEW ITEMS


016 . ERPR-8930(922) CONECUH COUNTY

LENGTH: 0.03 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Bridge Scour Repair on CR-42 at Bottle Creek northwest of Brooklyn. Length 0.030 mi.

BRACKET ESTIMATE: $62,500 TO $69,000

VIEW ITEMS


018 . STPPC-5706(200) & HSIP-5706(201) RUSSELL COUNTY

LENGTH: 4.73 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Additional Turn Lane, Resurfacing and Traffic Stripe on CR-39 (Nuckols Road) from CR-24 (Bradley Road) to SR-165 south of Phenix City. Length 4.608 mi.

BRACKET ESTIMATE: $770,000 TO $940,000

VIEW ITEMS


020 . NH-0012(550) HOUSTON COUNTY
WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-12 from SR-210 to west of CR-65 (MP 215.841) in Cowarts. Length 3.841 mi.

BRACKET ESTIMATE: $2,000,000 TO $2,400,000

VIEW ITEMS


022 . NH-0013(579) COLBERT COUNTY

LENGTH: 5.28 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, Traffic Stripe and Bridge Rail Retrofit on SR-13 (US-43) from south of CR-61 (MP 305.981) to north of SR-2 (US-72) (MP 311.259) in Tuscumbia. Length 5.278 mi.

BRACKET ESTIMATE: $2,375,000 TO $2,900,000

VIEW ITEMS


024 . SRTS-SR10(903) BALDWIN COUNTY

LENGTH: 3.78 MILES.

WORKING DAYS: 90
COST OF PLANS: $17.00

for constructing the Sidewalk along various streets in Summerdale at sites as indicated by the plans. Length 3.126 mi.

BRACKET ESTIMATE: $536,000 TO $655,000

VIEW ITEMS


025 . SRTS-SR10(908) BALDWIN COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Sidewalks and Crosswalks along various streets near the Gulf Shores Elementary School in Gulf Shores. Length 0.792 mi.

BRACKET ESTIMATE: $130,000 TO $160,000

VIEW ITEMS


027 . SRTS-SR11(900) BALDWIN COUNTY

LENGTH: 0.75 MILES.

WORKING DAYS: 30
COST OF PLANS: $11.00

for constructing the Sidewalk along Young Street in Fairhope. Length 0.753 mi.

BRACKET ESTIMATE: $105,000 TO $130,000

VIEW ITEMS


028 . SRTS-SR11(903) BALDWIN COUNTY

LENGTH: 0.68 MILES.

WORKING DAYS: 45
COST OF PLANS: $13.00

for constructing the Concrete Sidewalks along CR-71 and SR-16 (US-90) in Robertsdale at sites as indicated by the plans. Length 0.676 mi.

BRACKET ESTIMATE: $125,000 TO $150,000

VIEW ITEMS


029 . SRTS-SR11(907) WILCOX COUNTY

LENGTH: 0.75 MILES.

WORKING DAYS: 90
COST OF PLANS: $10.00

for constructing the Sidewalks and Crosswalks in Pine Hill at sites as indicated by the plans.

BRACKET ESTIMATE: $115,000 TO $140,000

**WITHDRAWN FROM THE LETTING**

032 . SRTS-SR11(914) COFFEE COUNTY
WORKING DAYS: 60
COST OF PLANS: $ 9.00

for constructing the Sidewalk and Traffic Control Markings along Regency Drive and Antler Drive near the Fort Rucker Boulevard Elementary School in Enterprise. Length 0.834 mi.

BRACKET ESTIMATE: $135,000 TO $165,000

VIEW ITEMS


034 . SRTS-SR11(916) COVINGTON COUNTY
WORKING DAYS: 60
COST OF PLANS: $ 6.00

for constructing the Sidewalk and School Zone Striping in Florala along Sixth Street, Begonia Street and Cactus Street at sites as indicated by the plans. Length 0.631 mi.

BRACKET ESTIMATE: $125,000 TO $150,000

VIEW ITEMS


035 . SRTS-SR12(901) COLBERT COUNTY
WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Sidewalks, Pavement Markings and Signing along South Atlanta Avenue and East Seventeenth Street in Sheffield at sites as indicated by the plans. Length 0.609 mi.

BRACKET ESTIMATE: $89,000 TO $109,000

VIEW ITEMS


036 . SRTS-SR12(921) LEE COUNTY

LENGTH: 0.54 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 7.00

for constructing the Cary Woods Elementary Sidewalks along Sanders Street, North Cary Drive, Petrie Road and Lunsford Drive in Auburn at sites as indicated by the plans. Length 0.537 mi.

BRACKET ESTIMATE: $123,000 TO $150,000

VIEW ITEMS


038 . STPAA-0003(548) JEFFERSON COUNTY
WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from I-459 to north of Columbiana Road (CR-99) (MP 266.257) in Hoover. Length 1.980 mi.

BRACKET ESTIMATE: $1,295,000 TO $1,585,000

VIEW ITEMS


040 . STPAA-0010(534) MARENGO COUNTY

LENGTH: 9.11 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 from 0.2 miles west of SR-69 to 3rd Street in Sweetwater. Length 9.113 mi.

BRACKET ESTIMATE: $1,560,000 TO $1,900,000

VIEW ITEMS


042 . STPAA-0016(511) MOBILE COUNTY

LENGTH: 1.73 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Restriping, Planing and Resurfacing on SR-16 (US-90) at various sites in Mobile as indicated by the plans. Length 1.730 mi.

BRACKET ESTIMATE: $770,000 TO $940,000

VIEW ITEMS


043 . STPAA-0017(544) WASHINGTON COUNTY

LENGTH: 4.17 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-17 from the Millry south city limit to the south end of Dunbar Creek Bridge. Length 4.170 mi.

BRACKET ESTIMATE: $1,000,000 TO $1,220,000

VIEW ITEMS


045 . STPAA-0055 (509) COVINGTON COUNTY
WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-55 from north of SR-15 (US-29) (MP 522.703) to south of SR-12 (US-84) (MP 525.003) in Andalusia. Length 2.300 mi.

BRACKET ESTIMATE: $866,000 TO $1,060,000

VIEW ITEMS


047 . STPAA-0118(509) WALKER COUNTY
WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-118 from the Marion county line to the beginning of the 4-lane (MP 44.050) in Carbon Hill. Length 7.100 mi.

BRACKET ESTIMATE: $1,380,000 TO $1,690,000

VIEW ITEMS


048 . STPAA-0139(503) BIBB COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Sinkhole Repair and Utility Relocation on SR-139 at CR-217 (Moreland Road) north of Brierfield. Length 0.095 mi.

BRACKET ESTIMATE: $215,000 TO $260,000

**WITHDRAWN FROM THE LETTING**

049 . STPAA-0243(500) WINSTON COUNTY

LENGTH: 3.41 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-243 from SR-195 to 0.2 miles south of the Franklin county line northeast of Haleyville. Length 3.407 mi.

BRACKET ESTIMATE: $670,000 TO $820,000

VIEW ITEMS


051 . STPAA-HSIP-0005(541) JEFFERSON COUNTY
WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-5 (US-11) from 22nd Street in Bessemer to north of Vann Street (MP 129.320). Length 5.360 mi.

BRACKET ESTIMATE: $1,730,000 TO $2,100,000

VIEW ITEMS


052 . STPAA-HSIP-0138(500) MACON COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-138 from west of I-85 (MP 0.000) to west of SR-8 (MP 0.775) in Shorter. Length 0.774 mi.

BRACKET ESTIMATE: $400,000 TO $490,000

VIEW ITEMS


054 . STPAA-HSIP-0010(535) BARBOUR COUNTY

LENGTH: 7.69 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-10 from 0.4 mile east of SR-51 (MP 193.735) in Clio to the Blue Springs east city limit. Length 7.686 mi.

BRACKET ESTIMATE: $2,260,000 TO $2,764,000

VIEW ITEMS


055 . STPBH-CN12(902) SHELBY COUNTY

LENGTH: 17.26 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-12, CR-52, CR-17, CR-47 and CR-51 at sites as indicated by the plans. Length 17.313 mi.

BRACKET ESTIMATE: $3,300,000 TO $4,000,000

VIEW ITEMS


057 . STPNU-1203(201) CHOCTAW COUNTY

LENGTH: 2.90 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-14 from Utsey Smith Road to SR-17 in Gilbertown. Length 2.900 mi.

BRACKET ESTIMATE: $566,000 TO $692,000

VIEW ITEMS


058 . STPNU-2123(201) & STPNU-2112(200) CRENSHAW COUNTY

LENGTH: 4.40 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing on CR-57 from US-29 to CR-59 east of Luverne and on CR-5 from North Sawmill Street to the Pike county line. Length 4.405 mi.

BRACKET ESTIMATE: $245,000 TO $300,000

VIEW ITEMS


059 . STPNU-4316(201) LOWNDES COUNTY

LENGTH: 6.48 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 3.00

for constructing the Full Depth Reclamation on CR-7 from CR-16 in Fostoria to the Dallas county line. Length 6.519 mi.

BRACKET ESTIMATE: $840,000 TO $1,000,000

VIEW ITEMS


060 . STPNU-5670(200) RANDOLPH COUNTY

LENGTH: 4.62 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-65 from CR-59 at Tin Shop to CR-87. Length 4.616 mi.

BRACKET ESTIMATE: $640,000 TO $780,000

VIEW ITEMS


061 . STPNU-CN11(201) LAUDERDALE COUNTY

LENGTH: 6.30 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-14 from CR-189 at Rhodesville to CR-81 and on CR-89 from CR-115 to SR-64 at Grassy. Length 6.300 mi.

BRACKET ESTIMATE: $610,000 TO $740,000

VIEW ITEMS


063 . STPOA-1404(201) CLAY COUNTY

LENGTH: 6.30 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-5 from the Tallapoosa county line to Bluff Valley Road southwest of Bluff Springs. Length 6.299 mi.

BRACKET ESTIMATE: $660,000 TO $800,000

VIEW ITEMS


064 . STPOA-1717(201) COLBERT COUNTY

LENGTH: 4.14 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-40 from CR-45 in Muscle Shoals to CR-48. Length 4.135 mi.

BRACKET ESTIMATE: $497,000 TO $608,000

VIEW ITEMS


065 . STPOA-4817(200) MARSHALL COUNTY

LENGTH: 2.76 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Columbus City Road from SR-79 in Columbus City to Old Union Road. Length 2.759 mi.

BRACKET ESTIMATE: $555,000 TO $675,000

VIEW ITEMS


068 . TCSP-06AL(001) MARION COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 8.00

for constructing the Grade, Drainage, Pavement and Traffic Stripe on the Guin Industrial Access Road from south of SR-44 to SR-44 in Guin. Length 0.096 mi.

BRACKET ESTIMATE: $163,000 TO $199,000

VIEW ITEMS


070 . 99-403-371-000-203 JEFFERSON COUNTY
WORKING DAYS: 125
COST OF PLANS: $ 6.00

for the Maintenance Roadside Mowing at various locations along I-20, I-59, I-65, I-459 and SR-4 (Corridor X) as indicated by the plans.

BRACKET ESTIMATE: $300,000 TO $370,000

VIEW ITEMS


071 . 99-403-595-000-202 SHELBY COUNTY
WORKING DAYS: 60
COST OF PLANS: $ 4.00

for the Maintenance Roadside Mowing along I-65 and SR-38 (US-280) at various locations as indicated by the plans.

BRACKET ESTIMATE: $85,500 TO $104,500

VIEW ITEMS


072 . 99-403-692-000-201 ST. CLAIR & BLOUNT COUNTIES
WORKING DAYS: 90
COST OF PLANS: $ 5.00

for the Maintenance Roadside Mowing at various sites along I-20, I-59 and I-65 as indicated by the plans.

BRACKET ESTIMATE: $155,000 TO $185,000

VIEW ITEMS