Proposal Letting List
March 30, 2012 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


If you would like to order Plans, Proposals, Diskettes, Specification Standard Drawings, please use the ALDOT Order Form ; . THANKS !!!


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


012 . BRZ-6300(219) , TUSCALOOSA 017 . PFH-0491(001) , LAWRENCE
021 . HRRR-5811(201) , ST. CLAIR 022 . HRRR-CN12(211) , DALLAS
025 . HSIP-CN11(909) , DEKALB 032 . NH-0157(517) , LAUDERDALE
034 . NH-HSIP-0001(571) , MADISON 035 . NH-HSIP-0001(572) , BARBOUR
036 . NH-HSIP-0002(552) , MADISON 041 . SRTS-SR09(905) , TUSCALOOSA
044 . SRTS-SR11(904) , MACON 045 . SRTS-SR11(905) , LOWNDES
046 . SRTS-SR11(910) , TUSCALOOSA 049 . SRTS-SR12(904) , BALDWIN
050 . SRTS-SR12(905) , BALDWIN 051 . SRTS-SR12(906) , ELMORE
052 . SRTS-SR12(908) , MARION 053 . SRTS-SR12(910) , BALDWIN
055 . SRTS-SR12(918) , BUTLER 064 . EB-0007(531) , JEFFERSON
065 . EB-0014(522) , PERRY 067 . STPAA-0139(503) , BIBB, etc.
069 . EB-0055(508) , COVINGTON 070 . EB-0101(566) , LAWRENCE
071 . EB-0129(504) , MARION 072 . EB-HSIP-0183(502) , PERRY
073 . EB-0184(500) , COLBERT 075 . EB-0257(500) , WALKER
076 . EB-0259(501) , COOSA, etc. 077 . EB-HSIP-0003(570) , SHELBY
*078 . EB-HSIP-0003(571) , JEFFERSON 080 . EB-HSIP-0068(506) , CHEROKEE
082 . EB-HSIP-0192(501) , COFFEE 091 . STPBH-CN12(903) , SHELBY
095 . STPNU-2103(200) , CRENSHAW 096 . STPOA-6101(200) , TALLADEGA
097 . STPOA-6721(201) , WINSTON 098 . EB-DE-A182(900) , MADISON
100 . STPOA-1910(200) , COOSA 101 . STPMT-STPOA-5105(200) , MONTGOMERY
102 . STPOA-9025(601) , LEE 106 . TCSP-TC05(900) , SHELBY
110 . ST-052-053-002 , MORGAN 114 . 99-405-114-665-211 , CHILTON
115 . 99-401-224-665-201 , CULLMAN 116 . 99-401-253-659-201 , DEKALB
117 . 99-401-452-000-201 , MADISON 118 . 99-402-692-000-201 , FRANKLIN, etc.
119 . 99-402-694-000-201 , MORGAN, etc. 120 . 99-501-690-000-001 , JACKSON, etc.
121 . 99-504-690-000-101 , TALLADEGA

**WITHDRAWN FROM THE LETTING


012 . BRZ-6300(219) TUSCALOOSA COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $13.00

for constructing the Bridge Replacement on Old Jasper Road at Gin Branch north of Samantha. Length 0.207 mi.

BRACKET ESTIMATE: $650,000 TO $795,000

VIEW ITEMS


017 . PFH-0491(001) LAWRENCE COUNTY

LENGTH: 5.09 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Base, Pavement and Traffic Stripe on CR-90 (F.S.-249) and CR-89 (F.S.-249) from SR-33 to CR-73 (F.S.-254) in the Black Warrior Wildlife Management Area. Length 5.094 mi.

BRACKET ESTIMATE: $1,240,000 TO $1,515,000

VIEW ITEMS


021 . HRRR-5811(201) ST. CLAIR COUNTY

LENGTH: 1.50 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Guardrail, End Anchors and Pavement Markers on CR-9 (Murphrees Valley Road) from Oakgrove Road to Pine Mountain Road in Springville. Length 1.496 mi.

BRACKET ESTIMATE: $34,000 TO $42,000

VIEW ITEMS


022 . HRRR-CN12(211) DALLAS COUNTY

LENGTH: 0.97 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing, Traffic Stripe, Signing and Pavement Markers on CR-63 at various sites as indicated by the plans. Length 0.977 mi.

BRACKET ESTIMATE: $213,000 TO $261,000

VIEW ITEMS


025 . HSIP-CN11(909) DEKALB COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on Beason Gap Road from Dogwood Boulevard to CR-89 in Fort Payne. Length 0.253 mi.

BRACKET ESTIMATE: $40,000 TO $49,000

VIEW ITEMS


032 . NH-0157(517) LAUDERDALE COUNTY

LENGTH: 4.62 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-157 from north of Crunk Road (MP 79.587) at Underwood to south of CR-272 (MP 84.250). Length 4.620 mi.

BRACKET ESTIMATE: $1,095,000 TO $1,335,000

VIEW ITEMS


034 . NH-HSIP-0001(571) MADISON COUNTY

LENGTH: 4.28 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431/231) from Mastin Lake Road (MP 337.490) in Normal to north of Bob Wade Lane (MP 341.770). Length 4.280 mi.

BRACKET ESTIMATE: $1,550,000 TO $1,895,000

VIEW ITEMS


035 . NH-HSIP-0001(572) BARBOUR COUNTY
WORKING DAYS: 95
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from north of CR-93 (Broad Street) to 0.25 mile south of Lindsey Drive in Eufaula. Length 4.921 mi.

BRACKET ESTIMATE: $3,100,000 TO $3,800,000

VIEW ITEMS


036 . NH-HSIP-0002(552) MADISON COUNTY

LENGTH: 3.43 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-2 (US-72) from the Limestone county line to east of Nance Street (MP 89.510) in Madison. Length 3.430 mi.

BRACKET ESTIMATE: $1,440,000 TO $1,760,000

VIEW ITEMS


041 . SRTS-SR09(905) TUSCALOOSA COUNTY
WORKING DAYS: 85
COST OF PLANS: $19.00

for constructing the Sidewalk, Traffic Control Markings, Signs and In-Roadway Lighting System on Dinah Washington Avenue in Tuscaloosa. Length 0.814 mi.

BRACKET ESTIMATE: $243,000 TO $297,000

VIEW ITEMS


044 . SRTS-SR11(904) MACON COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Sidewalk, Traffic Control Markings and Signs at the Tuskegee Institute Middle School and the Tuskegee Public Elementary School in Tuskegee.

BRACKET ESTIMATE: $64,800 TO $79,200

VIEW ITEMS


045 . SRTS-SR11(905) LOWNDES COUNTY
WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Sidewalks, Traffic Control Markings and Signs in the city of White Hall at sites as indicated by the plans.

BRACKET ESTIMATE: $176,000 TO $215,000

VIEW ITEMS


046 . SRTS-SR11(910) TUSCALOOSA COUNTY
WORKING DAYS: 35
COST OF PLANS: $11.00

for constructing the Sidewalk along Eighteenth Street and First Avenue in Tuscaloosa at sites as indicated by the plans. Length 0.258 mi.

BRACKET ESTIMATE: $102,000 TO $122,000

VIEW ITEMS


049 . SRTS-SR12(904) BALDWIN COUNTY
WORKING DAYS: 45
COST OF PLANS: $23.00

for constructing the Sidewalk, Traffic Control Markings and Signs along Fairwood Boulevard, Jan Drive and Marsim Drive in Fairhope at sites as indicated by the plans. Length 0.937 mi.

BRACKET ESTIMATE: $140,000 TO $170,000

VIEW ITEMS


050 . SRTS-SR12(905) BALDWIN COUNTY
WORKING DAYS: 30
COST OF PLANS: $12.00

for constructing the Sidewalk, Drainage, Traffic Control Markings and Signs along CR-49 (Magnolia South) from CR-64 to West Relham Drive in Loxley. Length 0.267 mi.

BRACKET ESTIMATE: $148,500 TO $180,000

VIEW ITEMS


051 . SRTS-SR12(906) ELMORE COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Southside Middle School Sidewalk Improvements at various sites in Tallassee as indicated by the plans.

BRACKET ESTIMATE: $80,000 TO $98,000

VIEW ITEMS


052 . SRTS-SR12(908) MARION COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 9.00

for constructing the Sidewalk, Traffic Control Markings and Signs along Berkley Avenue and Park Drive in Winfield at sites as indicated by the plans. Length 0.411 mi.

BRACKET ESTIMATE: $85,500 TO $104,500

VIEW ITEMS


053 . SRTS-SR12(910) BALDWIN COUNTY
WORKING DAYS: 45
COST OF PLANS: $19.00

for constructing the Sidewalk, Traffic Control Markings and Signs at the Spanish Fort Elementary School and the Old Spanish Fort Christian School in Spanish Fort at sites as indicated by the plans. Length 0.535 mi.

BRACKET ESTIMATE: $115,000 TO $140,000

VIEW ITEMS


055 . SRTS-SR12(918) BUTLER COUNTY
WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Sidewalk Replacement and Flashing Beacons at the W.O. Parmer Elementary School in Greenville.

BRACKET ESTIMATE: $31,500 TO $38,500

VIEW ITEMS


064 . EB-0007(531) JEFFERSON COUNTY
WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing and Temporary Traffic Stripe on SR-7 (US-11) from east of SR-75 (MP 143.925) to Tutwiler Drive in Trussville. Length 4.975 mi.

BRACKET ESTIMATE: $1,435,000 TO $1,755,000

VIEW ITEMS


065 . EB-0014(522) PERRY COUNTY

LENGTH: 14.38 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-14 from SR-183 east of Marion to the Dallas county line. Length 14.382 mi.

BRACKET ESTIMATE: $2,180,000 TO $2,660,000

VIEW ITEMS


067 . STPAA-0139(503) BIBB & SHELBY COUNTIES

LENGTH: 0.10 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Sinkhole Repair and Utility Relocation on SR-139 at CR-217 (Moreland Road) north of Brierfield. Length 0.095 mi.

BRACKET ESTIMATE: $265,000 TO $320,000

VIEW ITEMS


069 . EB-0055(508) COVINGTON COUNTY

LENGTH: 1.24 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-55 from the Florida state line to Alabama Street in Florala. Length 1.236 mi.

BRACKET ESTIMATE: $321,000 TO $390,000

VIEW ITEMS


070 . EB-0101(566) LAWRENCE COUNTY

LENGTH: 2.89 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-101 from south of CR-131 (MP 6.100) through Hatton to SR-157. Length 2.893 mi.

BRACKET ESTIMATE: $731,000 TO $894,000

VIEW ITEMS


071 . EB-0129(504) MARION COUNTY

LENGTH: 4.39 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-129 from SR-118 in Winfield to the north side of the SR-24 (Corridor X) interchange at Brilliant. Length 4.338 mi.

BRACKET ESTIMATE: $1,335,000 TO $1,635,000

VIEW ITEMS


072 . EB-HSIP-0183(502) PERRY COUNTY

LENGTH: 16.04 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-183 from SR-8 (US-80) in Uniontown to SR-5. Length 16.037 mi.

BRACKET ESTIMATE: $2,280,000 TO $2,850,000

VIEW ITEMS


073 . EB-0184(500) COLBERT COUNTY

LENGTH: 5.27 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-184 from SR-2 (US-72) (MP 0.000) in Muscle Shoals to east of CR-61 (MP 5.446). Length 5.274 mi.

BRACKET ESTIMATE: $1,475,000 TO $1,800,000

VIEW ITEMS


075 . EB-0257(500) WALKER COUNTY

LENGTH: 2.44 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-257 from north of CR-43 (MP 6.750) in Curry to the Winston county line. Length 2.443 mi.

BRACKET ESTIMATE: $475,000 TO $580,000

VIEW ITEMS


076 . EB-0259(501) COOSA & TALLAPOOSA COUNTIES
WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on SR-259 from SR-9 at Equality to SR-22 in Alexander City. Length 12.690 mi.

BRACKET ESTIMATE: $770,000 TO $945,000

VIEW ITEMS


077 . EB-HSIP-0003(570) SHELBY COUNTY
WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from CR-68 to 0.120 miles south of Riverchase Parkway (MP 262.710) north of Alabaster. Length 5.365 mi.

BRACKET ESTIMATE: $3,680,000 TO $4,500,000

VIEW ITEMS


078 . EB-HSIP-0003(571) JEFFERSON COUNTY

LENGTH: 4.62 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from the Locust Fork of the Black Warrior River through Warrior to the Blount county line. Length 4.616 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,360,000

**WITHDRAWN FROM THE LETTING**

080 . EB-HSIP-0068(506) CHEROKEE COUNTY

LENGTH: 5.29 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-68 from the north end of Grays Creek Bridge in Gaylesville to the Georgia state line. Length 5.290 mi.

BRACKET ESTIMATE: $1,275,000 TO $1,560,000

VIEW ITEMS


082 . EB-HSIP-0192(501) COFFEE COUNTY

LENGTH: 4.66 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-192 from SR-27 to SR-12 (US-84) in Enterprise. Length 4.696 mi.

BRACKET ESTIMATE: $1,520,000 TO $1,855,000

VIEW ITEMS


091 . STPBH-CN12(903) SHELBY COUNTY
WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on Inverness Parkway from Valleydale Road (CR-17) to SR-38 (US-280) in Hoover. Length 2.418 mi.

BRACKET ESTIMATE: $770,000 TO $935,000

VIEW ITEMS


095 . STPNU-2103(200) CRENSHAW COUNTY

LENGTH: 4.87 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing on CR-37 from SR-106 to CR-39 northwest of Brantley. Length 4.872 mi.

BRACKET ESTIMATE: $260,000 TO $320,000

VIEW ITEMS


096 . STPOA-6101(200) TALLADEGA COUNTY

LENGTH: 4.56 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-008 from CR-002 at Fayetteville to CR-090. Length 4.563 mi.

BRACKET ESTIMATE: $625,000 TO $765,000

VIEW ITEMS


097 . STPOA-6721(201) & STPNU-6720(201) WINSTON COUNTY

LENGTH: 2.44 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-14 (Sardis Airport Road) from CR-39 to the Cullman county line and on CR-39 from US-278 to CR-3733 east of Addison. Length 2.435 mi.

BRACKET ESTIMATE: $289,000 TO $353,000

VIEW ITEMS


098 . EB-DE-A182(900) MADISON COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $18.00

for constructing the Intersection Improvements (Resurfacing, Traffic Stripe and Traffic Signals) on Wall-Triana Highway at Harvest Road in Harvest. Length 0.214 mi.

BRACKET ESTIMATE: $620,000 TO $760,000

VIEW ITEMS


100 . STPOA-1910(200) COOSA COUNTY

LENGTH: 9.69 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from SR-21 (US-231) in Hanover to CR-511. Length 8.692 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,280,000

VIEW ITEMS


101 . STPMT-STPOA-5105(200) MONTGOMERY COUNTY

LENGTH: 8.10 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe at three sites on CR-24 as indicated by the plans. Length 8.100 mi.

BRACKET ESTIMATE: $915,000 TO $1,120,000

VIEW ITEMS


102 . STPOA-9025(601) LEE COUNTY

LENGTH: 0.47 MILES.

SHALL BE COMPLETED BY: August 31, 2012
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $18.00

for constructing the Widening, Resurfacing and Traffic Stripe on West Glen Avenue in Auburn from Donahue Drive to North College Street. Length 0.466 mi.

BRACKET ESTIMATE: $940,000 TO $1,150,000

VIEW ITEMS


106 . TCSP-TC05(900) SHELBY COUNTY
WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $14.00

for constructing the Access Improvements, Landscaping and Lighting at the American Village in Montevallo.

BRACKET ESTIMATE: $870,000 TO $1,060,000

VIEW ITEMS


110 . ST-052-053-002 MORGAN COUNTY

LENGTH: 0.40 MILES.

WORKING DAYS: 50
COST OF PLANS: $20.00

for constructing the Intersection Improvements on SR-53 (US-231) at SR-36 in Laceys Spring. Length 0.395 mi.

BRACKET ESTIMATE: $625,000 TO $765,000

VIEW ITEMS


114 . 99-405-114-665-211 CHILTON COUNTY

LENGTH: 28.00 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 3.00

for the Maintenance Roadside Mowing along I-65 from the Autauga county line to the Shelby county line.

BRACKET ESTIMATE: $95,000 TO $120,000

VIEW ITEMS


115 . 99-401-224-665-201 CULLMAN COUNTY

LENGTH: 26.89 MILES.

WORKING DAYS: 24
COST OF PLANS: $ 4.00

for the Maintenance Roadside Mowing and Litter Collection along I-65 from the Blount county line to the Morgan county line.

BRACKET ESTIMATE: $60,300 TO $73,700

VIEW ITEMS


116 . 99-401-253-659-201 DEKALB COUNTY

LENGTH: 43.00 MILES.

WORKING DAYS: 42
COST OF PLANS: $ 4.00

for the Maintenance Roadside Mowing and Litter Collection along I-59 from the Etowah county line to the Georgia state line.

BRACKET ESTIMATE: $103,500 TO $126,500

VIEW ITEMS


117 . 99-401-452-000-201 MADISON COUNTY

LENGTH: 6.74 MILES.

WORKING DAYS: 12
COST OF PLANS: $ 4.00

for the Maintenance Roadside Mowing and Litter Collection along I-565 from the Limestone county line to near SR-255.

BRACKET ESTIMATE: $40,400 TO $49,400

VIEW ITEMS


118 . 99-402-692-000-201 FRANKLIN & LAWRENCE COUNTIES
WORKING DAYS: 110
COST OF PLANS: $ 3.00

for the Maintenance Roadside Mowing and Litter Collection along various state routes at sites as indicated by the plans.

BRACKET ESTIMATE: $333,000 TO $407,000

VIEW ITEMS


119 . 99-402-694-000-201 MORGAN & LIMESTONE COUNTIES
WORKING DAYS: 72
COST OF PLANS: $ 2.00

for the Maintenance Roadside Mowing and Litter Collection along I-65 from the Cullman county line to the Tennessee state line and along I-565 from I-65 to the Madison county line.

BRACKET ESTIMATE: $158,000 TO $194,000

VIEW ITEMS


120 . 99-501-690-000-001 JACKSON , MADISON & CHEROKEE COUNTIES

LENGTH: 0.46 MILES.

WORKING DAYS: 100
COST OF PLANS: $13.00

for the Bridge Coating on various routes at various bridges as indicated by the plans. Length 0.464 mi.

BRACKET ESTIMATE: $910,000 TO $1,115,000

VIEW ITEMS


121 . 99-504-690-000-101 TALLADEGA COUNTY
WORKING DAYS: 100
COST OF PLANS: $ 2.00

for the Bridge Coating on various bridges as indicated by the plans.

BRACKET ESTIMATE: $449,000 TO $549,000

VIEW ITEMS



Return To: Top of this Page