COUNTY: CHOCTAW
WORKING DAYS: 60
for constructing the Bridge Replacement (Bridge Culvert) and Approaches on CR-2 at Red Creek southwest of Silas. Length 0.096 mi.The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $220,000 TO $268,000
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 201A002 | 1 | LS | Clear & Grub (Maximum Allowable Bid $ 4000 Per Acre)(Approximately 1 Acre) | |
| 206A000 | 1 | LS | Removal Of Old Bridge Station 10+00.19 | |
| 210A000 | 92 | CUYD | Unclassified Excavation | |
| 210D021 | 304 | CUYD | Borrow Excav (Lse Trb Meas)(A-4 Better) | |
| 214A000 | 685 | CUYD | Structure Excavation | |
| 214B001 | 138 | CUYD | Foundation Backfill Commercial | |
| 230A000 | 6 | RBST | Roadbed Processing | |
| 301A012 | 1262 | SQYD | CABC Type B Plant Mix 6" Thick | |
| 401A000 | 1147 | SQYD | Bituminous Treatment A | |
| 424A341 | 95 | TON | Superpave Wrg Surf 3/4" ESAL A/B | |
| 430B043 | 52 | TON | Agg Surf (1" Down, Crusher Run) | |
| 502A000 | 35010 | LB | Steel Reinforcement | |
| 524A010 | 194 | CUYD | Culvert Concrete | |
| 600A000 | 1 | LS | Mobilization | |
| 610C001 | 102 | TON | Loose Riprap Class 2 | |
| 610D003 | 80 | SQYD | Filter Blanket Geotextile | |
| 650A000 | 147 | CUYD | Topsoil | |
| 652A100 | 1 | ACRE | Seeding | |
| 656A010 | 1 | ACRE | Mulching | |
| 665J002 | 2406 | LF | Silt Fence | |
| 665O001 | 2406 | LF | Silt Fence Removal | |
| 665Q002 | 120 | LF | Wattle | |
| 680A001 | 1 | LS | Geometric Controls | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 11,785.00) | |
| 701G027 | 1033 | LF | Solid Yellow Cl 1 Ty A Traf Stripe | |
| 740B000 | 141 | SQFT | Construction Signs | |
| 740F002 | 8 | EACH | Barricades, Type III | |
| 740I002 | 4 | EACH | Warning Lights, Type B |