Enter search words here:

Office Engineer

015 . ACNU58623-ATRP(001) , CHEROKEE

COUNTY: CHEROKEE

WORKING DAYS: 45

MBE/DBE CONTRACT OBLIGATION: 3 %

for constructing the Resurfacing and Traffic Stripe on CR-19 from CR-39 to CR-71 southwest of Centre. Length 5.550 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $1,435,000 TO $1,755,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
401A004 71632 SQYD Bituminous Treatment E
405A000 2150 GAL Tack Coat
407B000 6 MILE Joint Sealant For Hot Mix Asphalt Pave
424A341 6205 TON Superpave Wrg Surf 3/4" ESAL A/B
424A346 750 TON Superpave Wrg Surf Lev 1/2" ESAL A/B
424B636 12536 TON Superpave Upr Bndr Lay 1" Esal A/B
424B640 100 TON Superpave Upr Bndr Pat 1" Esal A/B
430B043 3125 TON Agg Surf (1" Down, Crusher Run)
600A000 1 LS Mobilization
698A000 1 LS Construction Fuel (Maximum Bid Limited 75,660.00)
701A030 11 MILE Solid White Cl 2T Ty A Traf Stripe
701A034 7 MILE Solid Yellow Cl 2T Ty A Traf Stripe
701A044 4 MILE Broken Yellow Cl 2T Ty A Traf Stripe
701C000 12 MILE Broken Temporary Traffic Stripe
701C001 21 MILE Solid Temporary Traffic Stripe
701G252 275 LF Solid White Cl 2 Ty A Traf Str 5" WRS
703A002 132 SQFT Traffic Control Marking, Class 2, Type A
705A032 185 EACH Pavement Markers, Class A-H, Type 1-B
705A037 545 EACH Pavement Markers, Class A-H, Type 2-D
740B000 321 SQFT Construction Signs
740E000 25 EACH Cones (36" High)
740M001 25 EACH Ballast For Cone
740O000 1 EACH Pilot Car