Proposal Letting List
November 02, 2012 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I065(410) , MONTGOMERY 005 . EBF-STPAAF-0013(545) , FRANKLIN
006 . NH-HSIP-0008(565) , DALLAS 007 . ACOA58682-EB-9025(600) , LEE
008 . ACBRZ58468-ATRP(001) , CHOCTAW 009 . ACNU58313-ATRP(001) , CONECUH
010 . ACNU58436-ATRP(001) , RUSSELL 011 . ACNU58450-ATRP(001) , TALLAPOOSA
012 . ACNU58493-ATRP(001) , PICKENS 013 . ACNU58573-ATRP(001) , DALE
014 . ACNU58584-ATRP(001) , GENEVA 015 . ACNU58623-ATRP(001) , CHEROKEE
016 . ACNU58627-ATRP(001) , JACKSON 017 . ACNU58628-ATRP(001) , MARSHALL
*020 . BR-0026(501) , RUSSELL 021 . BR-0067(503) , BLOUNT, etc.
022 . BR-0179(500) , ETOWAH 028 . EB-4606(202) , MARENGO
032 . ERPRF-8930(920) , BALDWIN, etc. 033 . ERPR-8930(923) , DALE
041 . SRTS-SR10(900) , BIBB 042 . SRTS-SR11(915) , HENRY
048 . STPAA-0015(522) , ESCAMBIA 049 . STPAA-0042(524) , BALDWIN
050 . STPAA-HSIP-0191(500) , CHILTON 051 . STPAA-0217(502) , MOBILE
052 . STPAA-0217(503) , MOBILE 055 . STPAA-HSIP-0014(523) , DALLAS
056 . STPAA-HSIP-FM12(900) , WALKER 062 . STPOA-1118(200) , CHILTON
063 . STPOA-2712(600) , ESCAMBIA 067 . STPOA-0129(503) , FAYETTE
200 . IM-I065(413) , LOWNDES 201 . NH-0069(541) , CULLMAN, etc.
202 . NH-0135(500) , BALDWIN
**WITHDRAWN FROM LETTING**

001 . IM-I065(410) MONTGOMERY COUNTY
WORKING DAYS: 60
COST OF PLANS: $ 7.00

for constructing the Geotechnical Repair at Ramp 5 over Ramp 7 within the I-65/SR-8 (US-80) interchange in Montgomery. Length 0.234 mi.

BRACKET ESTIMATE: $180,000 TO $220,000

VIEW ITEMS


005 . EBF-STPAAF-0013(545) FRANKLIN COUNTY

LENGTH: 0.50 KILOMETERS.

WORKING DAYS: 400
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $23.00

for constructing the Dual Bridges on the relocated SR-13 at Gas Branch southeast of Phil Campbell. Length 0.500 km

BRACKET ESTIMATE: $14,900,000 TO $18,000,000

VIEW ITEMS


006 . NH-HSIP-0008(565) DALLAS COUNTY
WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Temporary Traffic Stripe on SR-8 (US-80) from east of Soapstone Creek (MP 95.060) to west of the Lowndes county line (MP 99.259). Length 4.199 mi.

BRACKET ESTIMATE: $2,870,000 TO $3,500,000

VIEW ITEMS


007 . ACOA58682-EB-9025(600) LEE COUNTY
WORKING DAYS: 250
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $71.00

for constructing the Widening (Grade, Drainage, Pavement, Signals and Signing) on Glenn Avenue/ Frederick Road from the Opelika city limits to Hamilton Road. Length 1.256 mi.

BRACKET ESTIMATE: $4,400,000 TO $5,400,000

VIEW ITEMS


008 . ACBRZ58468-ATRP(001) CHOCTAW COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 7.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on CR-2 at Red Creek southwest of Silas. Length 0.096 mi.

BRACKET ESTIMATE: $220,000 TO $268,000

VIEW ITEMS


009 . ACNU58313-ATRP(001) CONECUH COUNTY

LENGTH: 35.66 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-6, CR-29 and on CR-42 at sites as indicated by the plans. Length 35.662 mi.

BRACKET ESTIMATE: $2,970,000 TO $3,630,000

VIEW ITEMS


010 . ACNU58436-ATRP(001) RUSSELL COUNTY

LENGTH: 5.34 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-18 (Oswichee Road) from CR-39 to SR-165 south of Fort Mitchell. Length 5.338 mi.

BRACKET ESTIMATE: $885,000 TO $1,080,000

VIEW ITEMS


011 . ACNU58450-ATRP(001) TALLAPOOSA COUNTY

LENGTH: 6.15 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-89 from SR-50 in Camp Hill to the Chambers county line. Length 6.154 mi.

BRACKET ESTIMATE: $725,000 TO $880,000

VIEW ITEMS


012 . ACNU58493-ATRP(001) PICKENS COUNTY

LENGTH: 4.36 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-4 from SR-159 at Gordo to the Tuscaloosa county line. Length 4.363 mi.

BRACKET ESTIMATE: $700,000 TO $860,000

VIEW ITEMS


013 . ACNU58573- ATRP(001) DALE COUNTY

LENGTH: 3.23 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-18 from SR-53 (US-231) at Bagwells Crossroads to SR-27. Length 3.230 mi.

BRACKET ESTIMATE: $395,000 TO $480,000

VIEW ITEMS


014 . ACNU58584-ATRP(001) GENEVA COUNTY

LENGTH: 13.25 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-41 from SR-52 east of Geneva to the Houston county line. Length 13.246 mi.

BRACKET ESTIMATE: $1,650,000 TO $2,020,000

VIEW ITEMS


015 . ACNU58623-ATRP(001) CHEROKEE COUNTY

LENGTH: 5.55 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-19 from CR-39 to CR-71 southwest of Centre. Length 5.550 mi.

BRACKET ESTIMATE: $1,435,000 TO $1,755,000

VIEW ITEMS


016 . ACNU58627-ATRP(001) JACKSON COUNTY

LENGTH: 9.30 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-17 from SR-35 in Larkinsville to SR-79. Length 9.297 mi.

BRACKET ESTIMATE: $1,275,000 TO $1,560,000

VIEW ITEMS


017 . ACNU58628-ATRP(001) MARSHALL COUNTY

LENGTH: 12.30 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on Union Grove Road from SR-69 through Union Grove to SR-52 (US-231). Length 12.302 mi.

BRACKET ESTIMATE: $1,560,000 TO $1,910,000

VIEW ITEMS


020 . BR-0026(501) RUSSELL COUNTY
WORKING DAYS: 250
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $39.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on SR-29 at Hatchechubbee Creek and at High Log Creek in Hatchechubbee. Length 0.519 mi.

BRACKET ESTIMATE: $3,000,000 TO $4,000,000

** WITHDRAWN FROM THE LETTING **

021 . BR-0067(503) BLOUNT & CULLMAN COUNTIES

LENGTH: 0.77 MILES.

WORKING DAYS: 190
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $35.00

for constructing the Bridge Replacement and Approaches on SR-67 at the Mulberry Fork of the Black Warrior River north of Roswell. Length 0.765 mi.

BRACKET ESTIMATE: $4,395,000 TO $5,340,000

VIEW ITEMS


022 . BR-0179(500) & BR-0179(501) ETOWAH COUNTY

LENGTH: 0.83 MILES.

WORKING DAYS: 205
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $51.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on SR-179 at Wade Creek south of Aurora and at Little Cove Creek north of Aurora. Length 0.832 mi.

BRACKET ESTIMATE: $2,260,000 TO $2,770,000

VIEW ITEMS


028 . EB-4606(202) MARENGO COUNTY

LENGTH: 6.40 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-47 from CR-30 in Magnolia to CR-33 in Octagon. Length 6.396 mi.

BRACKET ESTIMATE: $930,000 TO $1,140,000

VIEW ITEMS


032 . ERPRF-8930(920) BALDWIN , ESCAMBIA & CONECUH COUNTIES
WORKING DAYS: 175
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $62.00

for constructing the Emergency Repairs at eleven sites as indicated by the plans.

BRACKET ESTIMATE: $1,320,000 TO $1,620,000

VIEW ITEMS


033 . ERPR-8930(923) DALE COUNTY
WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $15.00

for constructing the Slide Repair on SR-123 near CR-108 (Dillard Road) north of Ozark. Length 0.151 mi.

BRACKET ESTIMATE: $1,250,000 TO $1,500,000

VIEW ITEMS


041 . SRTS-SR10(900) BIBB COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 100
COST OF PLANS: $13.00

for constructing the Sidewalks and Traffic Control Markings along Fourth Avenue and Tabernacle Road in Brent at sites as indicated by the plans. Length 0.214 mi.

BRACKET ESTIMATE: $135,000 TO $165,000

VIEW ITEMS


042 . SRTS-SR11(915) HENRY COUNTY

LENGTH: 0.36 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 6.00

for constructing the Sidewalk, Pedestrian Bridge and Traffic Control Markings near the Headland Middle School in Headland at sites as indicated by the plans. Length 0.365 mi.

BRACKET ESTIMATE: $115,000 TO $140,000

VIEW ITEMS


048 . STPAA-0015(522) ESCAMBIA COUNTY

LENGTH: 6.01 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-15 (US-29) from SR-41 (MP 1.291) in East Brewton to east of CR-482 (MP 7.328). Length 6.037 mi.

BRACKET ESTIMATE: $840,000 TO $1,000,000

VIEW ITEMS


049 . STPAA-0042(524) BALDWIN COUNTY

LENGTH: 7.31 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-42 (US-98) from CR-65 (MP 63.007) to the east city limits of Elberta (MP 70.522). Length 7.393 mi.

BRACKET ESTIMATE: $2,000,000 TO $2,500,000

VIEW ITEMS


050 . STPAA-HSIP-0191(500) CHILTON COUNTY

LENGTH: 7.94 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-191 from one mile south of CR-36 to SR-3 (US-31) in Jemison. Length 7.825 mi.

BRACKET ESTIMATE: $2,700,000 TO $3,300,000

VIEW ITEMS


051 . STPAA-0217(502) MOBILE COUNTY

LENGTH: 13.58 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-217 from Jim Tom Circle (MP 12.910) south of Georgetown to Prine Road (MP 26.119). Length 12.713 mi.

BRACKET ESTIMATE: $3,100,000 TO $3,800,000

VIEW ITEMS


052 . STPAA-0217(503) MOBILE COUNTY

LENGTH: 12.29 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-217 from SR-17 (US-45) in Prichard to south of CR-764 (Jim Tom Circle) (MP 12.480). Length 12.290 mi.

BRACKET ESTIMATE: $2,155,000 TO $2,630,000

VIEW ITEMS


055 . STPAA-HSIP-0014(523) DALLAS COUNTY
WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-14 from the Perry county line to SR-8 (US-80) northwest of Selma. Length 6.026 mi.

BRACKET ESTIMATE: $1,890,000 TO $2,307,000

VIEW ITEMS


056 . STPAA-HSIP-FM12(900) WALKER COUNTY

LENGTH: 10.13 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-18 from the Fayette county line to SR-69 and on SR-69 from SR-18 to Market Street in Oakman. Length 10.191 mi.

BRACKET ESTIMATE: $1,760,000 TO $2,150,000

VIEW ITEMS


062 . STPOA-1118(200) CHILTON COUNTY

LENGTH: 4.20 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-29 from SR-3 (US-31) to CR-48 east of Thorsby. Length 4.199 mi.

BRACKET ESTIMATE: $886,000 TO $1,080,000

VIEW ITEMS


063 . STPOA-2712(200) ESCAMBIA COUNTY

LENGTH: 6.20 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-1 (Booneville Road) from Taylor Circle (North) to the Monroe county line. Length 6.292 mi.

BRACKET ESTIMATE: $820,000 TO $1,000,000

VIEW ITEMS


067 . STPOA-0129(503) FAYETTE COUNTY

LENGTH: 6.46 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-129 from near Hubbertville (MP 7.200) to SR-233 at the Marion county line. Length 6.471 mi.

BRACKET ESTIMATE: $1,135,000 TO $1,390,000

VIEW ITEMS


200 . IM-I065(413) LOWNDES COUNTY

LENGTH: 0.09 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 9.00

for constructing the Slide Repair along I-65 (Northbound Outside Shoulder) one mile south of the CR-33 underpass northeast of Fort Deposit. Length 0.087 mi.

BRACKET ESTIMATE: $375,000 TO $460,000

VIEW ITEMS


201 . NH-0069(541) CULLMAN & DEKALB COUNTIES
WORKING DAYS: 30
COST OF PLANS: $ 5.00

for the Demolition and Removal of Structures along SR-74 (US-278/SR-69) in Cullman and SR-75 in Lakeview at sites as indicated by the plans.

BRACKET ESTIMATE: $65,000 TO $80,000

VIEW ITEMS


202 . NH-0135(500) BALDWIN COUNTY

LENGTH: 2.12 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-135 from SR-182 to SR-180 in Gulf Shores. Length 2.115 mi.

BRACKET ESTIMATE: $340,000 TO $415,000

VIEW ITEMS


Return To: Top of this Page