018 . ACNU58335-ATRP(001) , BULLOCK

COUNTY: BULLOCK

WORKING DAYS: 35

for constructing the Resurfacing and Traffic Stripe on CR-22 from SR-6 (US-82) to SR-223 southwest of Union Springs. Length 3.096 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $305,000 TO $373,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
405A000 1500 GAL Tack Coat
407B000 4 MILE Joint Sealant For Hot Mix Asphalt Pave
424A346 3125 TON Superpave Wrg Surf Lev 1/2" ESAL A/B
424B640 200 TON Superpave Upr Bndr Pat 1" Esal A/B
430B043 800 TON Agg Surf (1" Down, Crusher Run)
600A000 1 LS Mobilization
698A000 1 LS Construction Fuel (Maximum Bid Limited 15,700.00)
701A030 7 MILE Solid White Cl 2T Ty A Traf Stripe
701A034 6 MILE Solid Yellow Cl 2T Ty A Traf Stripe
701A044 1 MILE Broken Yellow Cl 2T Ty A Traf Stripe
701C000 1 MILE Broken Temporary Traffic Stripe
701C001 6 MILE Solid Temporary Traffic Stripe
701G251 500 LF Solid White Cl 2 Ty A Traf Str 6" WRS
703A002 80 SQFT Traffic Control Marking, Class 2, Type A
705A032 20 EACH Pavement Markers, Class A-H, Type 1-B
705A037 400 EACH Pavement Markers, Class A-H, Type 2-D
740B000 286 SQFT Construction Signs
740O000 1 EACH Pilot Car