019 . ACNU58343-ATRP(001) , DALLAS

COUNTY: DALLAS

WORKING DAYS: 30

for constructing the Resurfacing and Traffic Stripe on CR-80 from SR-14 at Manila to SR-140. Length 2.186 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $360,000 TO $440,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
401B108 28222 SQYD Bituminous Treatment G (W/Polymer)
405A000 454 GAL Tack Coat
407B000 3 MILE Joint Sealant For Hot Mix Asphalt Pave
424A340 2556 TON Superpave Wrg Surf 1/2" ESAL A/B
424A343 150 TON Superpave Wrg Surf Pat 1/2" ESAL A/B
424A346 699 TON Superpave Wrg Surf Lev 1/2" ESAL A/B
600A000 1 LS Mobilization
650A000 642 CUYD Topsoil
652A100 3 ACRE Seeding
652C000 3 ACRE Mowing
656A010 3 ACRE Mulching
665F000 400 EACH Hay Bales
665J002 1950 LF Silt Fence
665O001 1950 LF Silt Fence Removal
698A000 1 LS Construction Fuel (Maximum Bid Limited 19,000.00)
701A030 5 MILE Solid White Cl 2T Ty A Traf Stripe
701A034 5 MILE Solid Yellow Cl 2T Ty A Traf Stripe
701C001 11 MILE Solid Temporary Traffic Stripe
701G251 550 LF Solid White Cl 2 Ty A Traf Str 6" WRS
703A002 22 SQFT Traffic Control Marking, Class 2, Type A
705A037 289 EACH Pavement Markers, Class A-H, Type 2-D
740B000 195 SQFT Construction Signs
740E000 50 EACH Cones (36" High)
740M001 50 EACH Ballast For Cone
740O000 1 EACH Pilot Car