068 . STPNU-5500(214) , & STPNU-5528(201) , PIKE

COUNTY: PIKE

WORKING DAYS: 45

MBE/DBE CONTRACT OBLIGATION: 3 %

for constructing the Planing, Resurfacing and Traffic Stripe on CR-5513 from CR-5511 to SR-93 south of Banks and on CR-7708 from CR-7734 to CR-7719 north of Troy. Length 3.738 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $480,000 TO $590,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
210D021 1462 CUYD Borrow Excav (Lse Trb Meas)(A-4 Better)
212A000 395 STA Machine Grading Shoulders
405A000 2193 GAL Tack Coat
407B000 5 MILE Joint Sealant For Hot Mix Asphalt Pave
408A052 43872 SQYD Plane Pvmt Appr 1.10" - 2.0"
424A341 1673 TON Superpave Wrg Surf 3/4" ESAL A/B
424A361 2100 TON Superpave Wrg Surf 3/4" ESAL C/D
424B640 100 TON Superpave Upr Bndr Pat 1" Esal A/B
424B655 100 TON Superpave Upr Bndr Pat 1" Esal C/D
600A000 1 LS Mobilization
652A100 6 ACRE Seeding
656A010 6 ACRE Mulching
665F000 50 EACH Hay Bales
665J002 2000 LF Silt Fence
665O001 2000 LF Silt Fence Removal
698A000 1 LS Construction Fuel (Maximum Bid Limited 25,000.00)
701A034 6 MILE Solid Yellow Cl 2T Ty A Traf Stripe
701A044 3 MILE Broken Yellow Cl 2T Ty A Traf Stripe
701C000 3 MILE Broken Temporary Traffic Stripe
701C001 6 MILE Solid Temporary Traffic Stripe
701G252 500 LF Solid White Cl 2 Ty A Traf Str 5" WRS
703A002 20 SQFT Traffic Control Marking, Class 2, Type A
703D001 20 SQFT Temporary Traffic Control Markings
740B000 367 SQFT Construction Signs
740O000 1 EACH Pilot Car