074 . STPOA-9421(600) , HOUSTON

COUNTY: HOUSTON

WORKING DAYS: 30

for constructing the Resurfacing and Traffic Stripe on Prevatt Road from the Ross Clark Circle in Dothan to Forrester Road. Length 1.938 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $305,000 TO $370,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
401B108 33006 SQYD Bituminous Treatment G (W/Polymer)
405A000 2000 GAL Tack Coat
407B000 3 MILE Joint Sealant For Hot Mix Asphalt Pave
424A358 100 TON Superpave Wrg Surf Lev 3/8" ESAL C/D
424A361 2750 TON Superpave Wrg Surf 3/4" ESAL C/D
424B663 200 TON Superpave Upr Bndr Wide 1 1/2" Esal C/D
600A000 1 LS Mobilization
698A000 1 LS Construction Fuel (Maximum Bid Limited 10,000.00)
740B000 368 SQFT Construction Signs
740O000 1 EACH Pilot Car