082 . 99-506-690-000-202 , AUTAUGA , BULLOCK , BUTLER , DALLAS , LOWNDES & MACON

COUNTY: AUTAUGA , BULLOCK , BUTLER , DALLAS , LOWNDES AND MACON

WORKING DAYS: 75

for constructing the Bridge Scour Repair at various structures as indicated by the plans.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $534,000 TO $653,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
504G000 614 LF Steel Piling Encasement Wet Condition
504G001 26 LF Steel Piling Encasement Dry Condition
600A000 1 LS Mobilization
610C001 4367 TON Loose Riprap Class 2
610D003 6577 SQYD Filter Blanket Geotextile
652A100 3 ACRE Seeding
656A010 3 ACRE Mulching
665A000 3 ACRE Temporary Seeding
665B001 9 TON Temporary Mulching
665F000 100 EACH Hay Bales
665G000 100 EACH Sand Bags
665J002 1000 LF Silt Fence
665L000 3000 LF Floating Basin Boom
665N000 225 TON Temporary Coarse Aggregate ALDOT No 1
665O001 1000 LF Silt Fence Removal
665Q002 300 LF Wattle
666A001 3 ACRE Pest Control Treatment
698A000 1 LS Construction Fuel (Maximum Bid Limited To $ 33,000.00)
740B000 944 SQFT Construction Signs