200 . NHF-0004(531) , MARION

COUNTY: MARION

WORKING DAYS: 120

for constructing the Interchange Lighting on SR-4 (Corridor X) at SR-44 east of Twin. Length 0.757 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $285,000 TO $348,000


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
600A000 1 LS Mobilization
665A000 1 ACRE Temporary Seeding
665B001 3 TON Temporary Mulching
665E000 500 SQYD Polyethylene
665F000 100 EACH Hay Bales
665J002 2000 LF Silt Fence
665O001 2000 LF Silt Fence Removal
665Q002 300 LF Wattle
680A001 1 LS Geometric Controls
698A000 1 LS Construction Fuel (Maximum Bid Limited 8,830.00)
740B000 1514 SQFT Construction Signs
740C000 33 SQFT Special Construction Signs
740D000 200 EACH Channelizing Drums
741C010 2 EACH Port Seq Arrow & Chevron Sign Unit
742A001 1 EACH Portable Changeable Message Sign Type 2
750B437 22 EACH Rdwy Lum Ass W/1 Mod Cob 250W Lum
750C010 22 EACH Pole Foundation,Roadway
750D200 12 EACH Electrical Junction Box,Type 1
750E115 50 LF Conduit,2 Inch,Rigid Nonmetallic
750E125 200 LF Conduit,1 1/4",Rigid Metallic
750F024 600 LF Conductor, #6 AWG
750F026 150 LF Conductor, #2 AWG
750G010 7750 LF Combined Duct & Cable 2#6AWG/1#6AWG GND
750H005 1 EACH Service Pole
750I005 1 EACH Lighting Control Center
756A022 420 LF 4" Elect Conduit 1 Line Ty 5 Install