Proposal Letting List
September 28, 2012 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I065(401) , SHELBY 005 . BRF-0008(528) , MARENGO
006 . BRF-0012(547) , COVINGTON 016 . ACBR58382-ATRP(001) , SHELBY
017 . ACBRZ58638-ATRP(001) , DEKALB 018 . ACNU58335-ATRP(001) , BULLOCK
019 . ACNU58343-ATRP(001) , DALLAS 020 . ACNU58346-ATRP(001) , LOWNDES
021 . ACNU58358-ATRP(001) , MONTGOMERY 022 . ACNU58386-ATRP(001) , CHAMBERS
023 . ACNU58435-ATRP(001) , RANDOLPH 024 . ACNU58474-ATRP(001) , SUMTER
026 . ACNU58533-ATRP(001) , COFFEE 027 . ACOA58682-EB-9025(600) , LEE*
045 . ERPR-8910(937) , LOWNDES 047 . ERPR-8930(916) , MONROE
050 . HRRR-CN12(229) , RUSSELL 051 . HRRR-CN12(230) , LIMESTONE
054 . SRTS-SR09(908) , PICKENS 056 . SRTS-SR11(901) , CALHOUN
060 . EB-0021(539) , MONROE 065 . STPBH-CN12(907) , JEFFERSON
066 . STPBH-CN12(908) , JEFFERSON 068 . STPNU-5500(214) , PIKE
072 . STPOA-5823(201) , ST. CLAIR 073 . STPOA-7432(603) , CALHOUN
074 . STPOA-9421(600) , HOUSTON 075 . STPOA-CN11(913) , CALHOUN
080 . 99-302-524-067-201 , MORGAN 081 . 99-307-203-012-201 , COVINGTON
082 . 99-506-690-000-202 , AUTAUGA, etc. 083 . 99-507-690-000-201 , COFFEE, etc.
200 . NHF-0004(531) , MARION 202 . 99-509-273-015-207 , ESCAMBIA

**WITHDRAWN FROM LETTING


001 . IM-I065(401) SHELBY COUNTY
SHALL BE COMPLETED BY: November 1, 2013
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $46.00

for constructing the Bridge Replacement and Approaches on I-65 (NBR) at the Norfolk Southern Railroad north of Exit 228 in Calera. Length 0.659 mi.

BRACKET ESTIMATE: $3,780,000 TO $4,620,000

VIEW ITEMS


005 . BRF-0008(528) MARENGO COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $44.00

for constructing the Bridge Replacement (WBR) and Approaches on SR-8 (US-80) at French Creek east of Demopolis. Length 1.003 mi.

BRACKET ESTIMATE: $3,720,000 TO $4,540,000

VIEW ITEMS


006 . BRF-0012(547) COVINGTON COUNTY

LENGTH: 0.79 MILES.

WORKING DAYS: 190
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $54.00

for constructing the Bridge Replacements and Approaches on SR-12 (US-84) (EBR) at the Yellow River and Relief southeast of Sanford. Length 0.785 mi.

BRACKET ESTIMATE: $3,460,000 TO $4,230,000

VIEW ITEMS


016 . ACBR58382-ATRP(001) SHELBY COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 200
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $18.00

for constructing the Bridge Replacement and Approaches on CR-12 at Dry Creek in Montevallo. Length 0.209 mi.

BRACKET ESTIMATE: $1,610,000 TO $1,995,000

VIEW ITEMS


017 . ACBRZ58638-ATRP(001) DEKALB COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 130
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 4.00

for constructing the Bridge Replacement (Bridge Culvert) on CR-328 at Reedy Creek east of Geraldine. Length 0.010 mi.

BRACKET ESTIMATE: $490,000 TO $600,000

VIEW ITEMS


018 . ACNU58335-ATRP(001) BULLOCK COUNTY

LENGTH: 3.10 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-22 from SR-6 (US-82) to SR-223 southwest of Union Springs. Length 3.096 mi.

BRACKET ESTIMATE: $305,000 TO $373,000

VIEW ITEMS


019 . ACNU58343-ATRP(001) DALLAS COUNTY

LENGTH: 2.19 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-80 from SR-14 at Manila to SR-140. Length 2.186 mi.

BRACKET ESTIMATE: $360,000 TO $440,000

VIEW ITEMS


020 . ACNU58346-ATRP(001) LOWNDES COUNTY

LENGTH: 5.88 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-54 from CR-40 to the Montgomery county line. Length 5.884 mi.

BRACKET ESTIMATE: $862,000 TO $1,050,000

VIEW ITEMS


021 . ACNU58358-ATRP(001) MONTGOMERY COUNTY

LENGTH: 3.61 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-17 (Mitchell Young Road) from SR-8 (US-80) west of the Montgomery city limits to CR-54 (Old Selma Road). Length 3.613 mi.

BRACKET ESTIMATE: $805,000 TO $980,000

VIEW ITEMS


022 . ACNU58386-ATRP(001) CHAMBERS COUNTY

LENGTH: 8.27 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-278 from SR-1 (US-431) to the Georgia state line. Length 8.263 mi.

BRACKET ESTIMATE: $1,075,000 TO $1,310,000

VIEW ITEMS


023 . ACNU58435-ATRP(001) RANDOLPH COUNTY

LENGTH: 3.85 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-65 from CR-61 to CR-59 southwest of Omaha. Length 3.846 mi.

BRACKET ESTIMATE: $533,000 TO $650,000

VIEW ITEMS


024 . ACNU58474-ATRP(001) SUMTER COUNTY

LENGTH: 5.03 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Full Depth Reclamation, Resurfacing and Traffic Stripe on CR-85 from CR-34 at Warsaw to the Pickens county line. Length 5.075 mi.

BRACKET ESTIMATE: $935,000 TO $1,145,000

VIEW ITEMS


026 . ACNU58533- ATRP(001) COFFEE COUNTY

LENGTH: 7.13 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-606 from CR-625 to SR-192 at the Enterprise city limits. Length 7.129 mi.

BRACKET ESTIMATE: $805,000 TO $980,000

VIEW ITEMS


027 . ACOA58682-EB-9025(600) LEE COUNTY
WORKING DAYS: 250
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $71.00

for constructing the Widening (Grade, Drainage, Pavement, Signals and Signing) on Glenn Avenue/ Frederick Road from the Opelika city limits to Hamilton Road. Length 1.256 mi.

BRACKET ESTIMATE: $4,340,000 TO $5,300,000

**WITHDRAWN FROM LETTING**

045 . ERPR-8910(937) LOWNDES COUNTY

LENGTH: 0.08 MILES.

WORKING DAYS: 60
COST OF PLANS: $10.00

for constructing the Slide Repair on CR-37 at approximately 3 miles north of SR-185 northeast of Fort Deposit. Length 0.075 mi.

BRACKET ESTIMATE: $962,000 TO $1,175,000

VIEW ITEMS


047 . ERPR-8930(916) MONROE COUNTY

LENGTH: 0.19 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $19.00

for constructing the Slide Repair on SR-41 from approximately 1 mile south of Limestone Creek to approximately 1.8 miles north of SR-47 north of Monroeville. Length 0.194 mi.

BRACKET ESTIMATE: $680,000 TO $834,000

VIEW ITEMS


050 . HRRR-CN12(229) RUSSELL COUNTY

LENGTH: 9.60 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe, Markings and Pavement Markers on CR-28 (Sandfort Road) from SR-169 to the Phenix City city limits. Length 9.600 mi.

BRACKET ESTIMATE: $94,000 TO $114,000

VIEW ITEMS


051 . HRRR-CN12(230) LIMESTONE COUNTY

LENGTH: 0.23 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 4.00

for constructing the Flashing Beacons, Traffic Stripe, Markings and Legends at three intersections near Athens at sites as indicated by the plans. Length 0.384 mi.

BRACKET ESTIMATE: $45,000 TO $55,000

VIEW ITEMS


054 . SRTS-SR09(908) PICKENS COUNTY

LENGTH: 0.47 MILES.

WORKING DAYS: 80
COST OF PLANS: $17.00

for constructing the Sidewalks, Crosswalks and Signing along 4th Street SW, 7th Avenue SW and 10th Avenue SW in Reform at sites as indicated by the plans. Length 0.466 mi.

BRACKET ESTIMATE: $148,000 TO $181,000

VIEW ITEMS


056 . SRTS-SR11(901) CALHOUN COUNTY

LENGTH: 0.38 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 6.00

for constructing the Sidewalk and Pedestrian Bridge along the Old Piedmont Gadsden Highway from SR-200 to Fifth Avenue North in Piedmont. Length 0.376 mi.

BRACKET ESTIMATE: $150,000 TO $180,000

VIEW ITEMS


060 . EB-0021(539) MONROE COUNTY

LENGTH: 0.90 MILES.

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 9 % COST OF PLANS: $48.00

for constructing the Intersection Improvements on SR-21/SR-47 at CR-42 northeast of Tunnel Springs. Length 0.890 mi.

BRACKET ESTIMATE: $2,400,000 TO $2,950,000

VIEW ITEMS


065 . STPBH-CN12(907) JEFFERSON COUNTY

LENGTH: 16.80 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing and Traffic Stripe at various sites in and around Birmingham as indicated by the plans. Length 16.800 mi.

BRACKET ESTIMATE: $3,400,000 TO $4,290,000

VIEW ITEMS


066 . STPBH-CN12(908) JEFFERSON COUNTY

LENGTH: 6.24 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on various streets in Birmingham at sites as indicated by the plans. Length 6.243 mi.

BRACKET ESTIMATE: $1,785,000 TO $2,185,000

VIEW ITEMS


068 . STPNU-5500(214) & STPNU-5528(201) PIKE COUNTY

LENGTH: 3.74 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on CR-5513 from CR-5511 to SR-93 south of Banks and on CR-7708 from CR-7734 to CR-7719 north of Troy. Length 3.738 mi.

BRACKET ESTIMATE: $480,000 TO $590,000

VIEW ITEMS


072 . STPOA-5823(201) ST. CLAIR COUNTY

LENGTH: 3.83 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-6 from SR-25 (US-411) in Branchville to CR-12. Length 3.832 mi.

BRACKET ESTIMATE: $770,000 TO $940,000

VIEW ITEMS


073 . STPOA-7432(603) CALHOUN COUNTY

LENGTH: 0.70 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on Gardner Drive SE from Church Avenue SE to George Street SE in Jacksonville. Length 0.702 mi.

BRACKET ESTIMATE: $147,000 TO $179,000

VIEW ITEMS


074 . STPOA-9421(600) HOUSTON COUNTY

LENGTH: 1.94 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Prevatt Road from the Ross Clark Circle in Dothan to Forrester Road. Length 1.938 mi.

BRACKET ESTIMATE: $305,000 TO $370,000

VIEW ITEMS


075 . STPOA-CN11(913) CALHOUN COUNTY
WORKING DAYS: 40
COST OF PLANS: $10.00

for constructing the Resurfacing and Traffic Stripe on Mountain Street NW from SR-21 (Pelham Road) to CR-592 (Old Gadsden Road) in Jacksonville. Length 0.815 mi.

BRACKET ESTIMATE: $335,000 TO $410,000

VIEW ITEMS


080 . 99-302-524-067-201 MORGAN COUNTY

LENGTH: 6.59 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-67 from south of the Cotaco Creek Bridge (MP 17.230) through Florette to south of SR-36 (MP 24.020). Length 6.764 mi.

BRACKET ESTIMATE: $2,280,000 TO $2,800,000

VIEW ITEMS


081 . 99-307-203-012-201 COVINGTON COUNTY

LENGTH: 7.75 MILES.

WORKING DAYS: 30
COST OF PLANS: $10.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-12 (US-84) from the Conecuh county line to west of SR-55 (MP 127.301) in River Falls. Length 7.752 mi.

BRACKET ESTIMATE: $964,000 TO $1,178,000

VIEW ITEMS


082 . 99-506-690-000-202 AUTAUGA , BULLOCK , BUTLER , DALLAS , LOWNDES & MACON COUNTIES
WORKING DAYS: 75
COST OF PLANS: $ 5.00

for constructing the Bridge Scour Repair at various structures as indicated by the plans.

BRACKET ESTIMATE: $534,000 TO $653,000

VIEW ITEMS


083 . 99-507-690-000-201 COFFEE , DALE , GENEVA & HENRY COUNTIES
WORKING DAYS: 115
COST OF PLANS: $18.00

for constructing the Pile Encasement and Riprap Placement on various bridges at sites as indicated by the plans.

BRACKET ESTIMATE: $380,000 TO $460,000

VIEW ITEMS


200 . NHF-0004(531) MARION COUNTY
WORKING DAYS: 120
COST OF PLANS: $ 9.00

for constructing the Interchange Lighting on SR-4 (Corridor X) at SR-44 east of Twin. Length 0.757 mi.

BRACKET ESTIMATE: $285,000 TO $348,000

VIEW ITEMS


202 . 99-509-273-015-207 ESCAMBIA COUNTY

LENGTH: 0.09 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 9.00

for the Bridge Coating on SR-15 (US-29) at Murder Creek in Brewton.

BRACKET ESTIMATE: $184,000 TO $225,000

VIEW ITEMS


Return To: Top of this Page